spencer davis
Project Manager at GEBHARDT ECS Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
GEBHARDT ECS Ltd.
-
United Kingdom
-
Transportation, Logistics, Supply Chain and Storage
-
1 - 100 Employee
-
Project Manager
-
Aug 2021 - Present
• Leading project portfolio including multiple project assignments • Procurement of Projects from inception to completion. • Intralogistics – Tote, Pallet, Bulk storage systems, pallet lifts (Amazon) • Despatch conveyor systems, including multiple bulk pack size • Managing external sub-contractors • Cost Analysis and improvement • Client Relations / Negotiation • MS project schedules / Timing plans • Project review Meetings, - Customer, Design, Purchasing, Controls, Build • On-site CDM • IOSH
-
-
-
LAC Conveyors & Automation
-
United Kingdom
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Nov 2019 - Jul 2020
• Project / Program Management • Conveyor systems, production lines (JLR) • Procurement of Projects from inception to completion. • Client Relations / Negotiation • Customer Support • MS planning • Project review Meetings, - Customer, Design, Purchasing, Controls, Build, • Production Deployment and planning • Lean Manufacturing / Timing Plans • FMEA / DFMEA Sign off • MBOM/CBOM Sign off • Project / Program Management • Conveyor systems, production lines (JLR) • Procurement of Projects from inception to completion. • Client Relations / Negotiation • Customer Support • MS planning • Project review Meetings, - Customer, Design, Purchasing, Controls, Build, • Production Deployment and planning • Lean Manufacturing / Timing Plans • FMEA / DFMEA Sign off • MBOM/CBOM Sign off
-
-
-
ATM Automation
-
United Kingdom
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Mar 2018 - Mar 2019
• Project / Program Management • Procurement of Projects • Client Relations / Negotiation • Customer Support • MPS (master planning schedule) • Project review Meetings, - Customer, Design, Purchasing, Controls, Build, • Production Deployment • Lean Manufacturing / Timing Plans • MBOM/CBOM Sign off • Project / Program Management • Procurement of Projects • Client Relations / Negotiation • Customer Support • MPS (master planning schedule) • Project review Meetings, - Customer, Design, Purchasing, Controls, Build, • Production Deployment • Lean Manufacturing / Timing Plans • MBOM/CBOM Sign off
-
-
-
TRANSMISSION OF POWER LIMITED
-
United Kingdom
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Special Project Manager/CAD Designer
-
Aug 2013 - Mar 2018
• Processing and planning projects from initial prototype design to sign off, liaising with Tier 1 Suppliers and OEM customers, laying out Schemes together with production requirements. Quotations, Costing’s and timing plans for the complete project. • General Assembly Designs on AutoCAD for approval. Full Design Detail Drawings (Automotive Assembly Pallets, Production Lines, Special Purpose Machines, Conveyors Systems) for Manufacture including material specifications and processes/treatments, Fabrication, Electronics, Hydraulics. Issuing and managing the manufacture of the component. • Assisting with the manufacture of parts – Tool Room work, Milling, Grinding, Turning and Fitting. Final inspection of all manufactured parts before assembly and after final assembly for signing off and delivery. • Purchasing of raw materials for manufacture, all ancillary parts.
-
-
-
-
Project Manager/CAD Designer
-
May 2011 - Aug 2013
• Processing and planning projects from initial concept to installation, liaising with customers and laying out Schemes together with production requirements. Quotations/Costing’s and timing plans for the complete project. • General Assembly Designs on AutoCAD for approval. Full Design Detail Drawings (Jigs, Fixtures, Gauges) for Manufacture including material specifications and processes/treatments, Fabrication, issuing and managing the manufacture of the component parts on the shop floor. • Assisting with the manufacture of parts – Tool Room work, Milling, Grinding, Turning, Jig Boring and Fitting. Final inspection (Mitutyo co-ordinate measuring machine) of all manufactured parts before assembly and after final assembly for signing off and delivery. • Purchasing of raw materials for manufacture, all ancillary parts (Hydraulics, Gauges, Valves, Nuts and Bolts) required for Assembly, Special Tooling, cutters/taps, and general shop floor tooling. • Management of IT and implementing hardware/software requirements, maintaining data/customer-based information and access, E-mail accounts and Telecoms, all plant equipment and servicing. • Responsible for all managerial rolls within the company, and the running of the company in absence of the Managing Director.
-
-
-
Implemental Ltd
-
United Kingdom
-
Telecommunications
-
1 - 100 Employee
-
Designer/Surveyor
-
Feb 2009 - May 2011
• Cell site and technical environments survey, design, visualisations including producing drawings required for planning/acquisition, detailed design, specification and construction drawings, for upgrades and new ‘rollout’ sites: Greenfield, Rooftop and street-side telecommunication cell sites. • Working within a multidiscipline team on Critical Environments projects to short timescales on the production of scheme coordination, detailed design and structural steelwork fabrication/installation drawings for proposed alterations to building services existing large IT/switch and industrial installations. • Managing company servers’ access both internally for each department’s specific requirements, external access for contractors/surveyors. Integrating new software, and responsible for mobile telecoms for on-site remote access.
-
-
-
Burnsall Engineering
-
United Kingdom
-
Appliances, Electrical, and Electronics Manufacturing
-
1 - 100 Employee
-
Computer Aided Design Designer
-
Oct 1997 - Feb 2009
• Design and detailing of rubber/Silicon/Plastic injection moulds • Purchasing. • Design and detailing of rubber/Silicon/Plastic injection moulds • Purchasing.
-
-
-
KRAMARK GAUGE & TOOL LIMITED
-
United Kingdom
-
Mining
-
Project Manager/CAD Designer
-
Oct 1997 - Feb 2009
• Processing and planning projects from initial concept to installation. • General Assembly Designs and full detailing on AutoCAD • Assisting with the manufacture of parts-Tool Room work, Milling, Grinding, Turning, Jig Boring and Fitting. • Full inspection before assembly and after final assembly. • Purchasing of all materials for manufacture, all ancillary parts • Processing and planning projects from initial concept to installation. • General Assembly Designs and full detailing on AutoCAD • Assisting with the manufacture of parts-Tool Room work, Milling, Grinding, Turning, Jig Boring and Fitting. • Full inspection before assembly and after final assembly. • Purchasing of all materials for manufacture, all ancillary parts
-
-
-
-
CAD Designer/Inspector
-
Mar 1992 - Jun 1994
• Design and detailing of Press tools for the automotive industry. • Inspection of finished pressing, CNC Mitutyo co-ordinate measuring machine • Design and detailing of Press tools for the automotive industry. • Inspection of finished pressing, CNC Mitutyo co-ordinate measuring machine
-
-
-
-
Apprenticeship Tool Maker
-
Sep 1987 - Mar 1992
• Tool Maker - Milling, Grinding, Turning, Jig Boring and Fitting. • Draftsman – design and detailing Jigs, Fixtures and gauges (Drawing Board) • Tool Maker - Milling, Grinding, Turning, Jig Boring and Fitting. • Draftsman – design and detailing Jigs, Fixtures and gauges (Drawing Board)
-
-
Education
-
Henley College
BTEC Higher National Certificate, Computer Aided Engineering -
Henley College
BTEC National Certificate, Engineering -
Henley College
City and Guilds, Mechanical Production -
Henley College
City and Guilds, Engineering Competences -
,