Somnath Chowdhury

Project Manager at The West Bengal Power Development Corporation Limited (WBPDCL)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Kolkata metropolitan area, West Bengal, India, IN
Languages
  • English Native or bilingual proficiency
  • Bengali Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • Deutsch Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Tanumay Das

excellent project manager

shambo mukherjee

Somnath works with utter dedication and loves working even in non conducive environment. He is definitely a sincere guy with lots of passion in his work.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Project Manager
      • Feb 2017 - Present

      Initiation & planning of Complete FGD (Flue Gas De-Sulphurisation) system for 2260 MW Coal Based Thermal Power Station at Sagardighi, West Bengal, India. Detail Engineering of Hydrogen Generation Plant Package of Sagardighi Thermal Power Extension Project U#3 & U#4 (2x500 MW) sub-critical units.

    • Assistant Manager (Project & Planning)
      • Sep 2016 - Jan 2017

      Carried out Feasibility Study of 1x660 MW at Sagardighi Thermal Power Project with our Engineering Consultant M/s Development Consultants Ltd., KolkataReviewed and finalized the Detailed Project Report (DPR) of 1x660 MW Coal Based Super-Critical Unit at Sagardighi Thermal Power Project with M/s Development Consultants Ltd., Kolkata.Presently working for Design Intent Methodology (DIM) for 1x660 MW Coal Based Super-Critical Unit at Sagardighi Thermal Power Project with M/s Development Consultants Ltd., Kolkata. Show less

    • Assistant Manager (Project & Planning)
      • Jan 2010 - Aug 2016

      Technical specification review and finalization of 2x500 MW Coal Based Sub-Critical Unit at Sagardighi Thermal Power Project with our engineering M/s Development Consultants Ltd., Kolkata. Successfully done the Bid Evaluation and LOA placement of the International Competitive Bidding (ICB) for this Mega Power Project.Actively done the detail engineering before the actual supply of material starts alongwith the in house Engineering personnel and Engineering Team from M/s Development Consultants Ltd., Kolkata. Pro-actively monitored the quality and on time delivery of material to Sagardighi Site for faster Project progress without any delay.COD (Commercial Operation Declaration) of both the Units were done within the calendar year 2016.Moving towards contract closing of the B-T-G package. Show less

    • Assistant Manager
      • Nov 2008 - Dec 2009

      Presently responsible for Project Planning,to monitor project progression through Prima-vera and Assist in Financial Analysis in R&M projects and Review of technical specifications & Drawings for upcoming Power plant projects.

    • Associate System Engineer
      • Jun 2008 - Nov 2008

      Worked as a SAP-Practitioner to develop codes in ABAP. Worked as a SAP-Practitioner to develop codes in ABAP.

Education

  • St. Xavier's College (Autonomous), Kolkata
    Post Graduate Diploma, Logistics and Supply Chain Management
    2017 - 2018
  • Jadavpur University
    B.M.E, Engineering
    2005 - 2008

Community

You need to have a working account to view this content. Click here to join now