Smruti Ranjan Pattnaik

Senior Manager , Project Engineering , Quality and Commissioning at Bangladesh India Friendship Power Company (P) Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
India, IN
Languages
  • English -
  • Hindi -
  • Oriya -
  • Bengali -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Arnob Nandy Mazumder

I have worked with Pattnaik sir for nearly one and a half years. During the final six months of that period, he served as my reporting officer. He had been a very helpful supervisor. During the commissioning phase of the Ash Handling Plant for the Maitree Supercritical Thermal Power Project, he guided me. He also assisted me during the initial phase of Coal Handling Plant operation. I wish him the best of luck.

Rajeev Kumar

Very innovative and helpful. Highly focused attitude.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bangladesh
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Manager , Project Engineering , Quality and Commissioning
      • Jun 2018 - Present

    • Manager, Project Engineering
      • Jun 2018 - Dec 2018

    • Utilities
    • 700 & Above Employee
    • Manager
      • Jan 2016 - Jun 2018

      • Managed cross-functional team to conceptualize, design and deliver end to end engineering for material handling systems of combined worth approx. INR 2500Cr.• Managed six projects from concept to completion; led complex vendor negotiations, and guided team’s performance through effective communication.• Coordinated with various functional groups, project sites spread across the nation and external stakeholders (vendors, international OEMs and statutory bodies) to streamline project delivery and reduce engineering cycle time.• Liaised with construction site, equipment vendors, and civil contractors and collaborated with cross-functional teams to resolve site issues and expedite engineering processes.• Responsible for Conducting Gap Analysis and Communicating the business requirements to the implementation team to ensure a smooth transition from blueprinting to implementation stages.• Timely response to provide solutions to various site issues related to O&M, erection and commissioning.• Involved in forward integration strategy to engage cement manufacturers/cement consultants to set up fly ash based cement plant near NTPC thermal power plants to utilize fly ash.• Identifying functional bottlenecks & assisting enhancements in the existing project engineering and management set up.• Responsible for training the Core team members and help develop a center of Excellence team to take care of issues in business transformation.Projects :In addition to the projects already mentioned in the tenure of Deputy Manager and Asst. Manager below, following projects were also entrusted to me:• Balance works of Ash Handling Plant for Barh Super Thermal Power Plant (3x600MW) worth approx. 90 Cr.• Coal Mill Rejects Handling System for Barh Super Thermal Power Plant (3x660MW) worth approx.16 Cr. Show less

    • Deputy Manager
      • Jan 2013 - Dec 2015

      • Lead a cross functional team to drive detail engineering activities for Coal Handling Plant (CHP), Ash Handling Plant (AHP), Fuel Oil Handling Plant (FOHP) and Mill Rejects Handling System (MRHS) fueling NTPC’s growth.• Managed 4 CHP projects, 4 AHP projects, 4 FOHP, and 2 Renovation & Modernization(R & M) projects combined worth of approx. 2000Cr. • Key contributor to the procurement process for capital goods and services worth approx. INR 800Cr. • Handled NTPC first 800MW project – Kudgi STPP ; Handle NTPC highest rated CHP plant – 3700TPH• Evaluation of Techno Commercial Bids and Qualifying Requirements; Preparation of Technical Evaluation Report.• Initiated, led and completed standardization of technical specifications for CHP & AHP based on industry benchmarking, operational feedback and recurring engineering issues.• Preparation of Feasibility Report, Bill of Quantities for cost estimate analysis; Preparation of Technical Specification for CHP, AHP and FOHP ; Preparation of Qualifying Requirements and Financial Parameters for the bidders and sub-vendors/associates.• Techno-Economic Study of having sheds over stock pile- storing imported coal.• Root cause analysis of various failures at site.• Headed a 3 member team to expedite the delivery of 3 nos. Stacker cum Reclaimer from M/s Zoomlion, China.Projects :In addition to the projects already mentioned in the tenure of Asst. Manager below, I was the custodian of the following projects too :• CHP, AHP, FOHP & MRHS of Kudgi Super Thermal Power Plant (3x800MW) worth approx.620 Cr.• CHP, AHP, FOHP & MRHS of Nabinagar Super Thermal Power Plant (3x660MW) worth approx.600 Cr. Show less

    • Assistant Manager
      • Jun 2008 - Dec 2012

      • Preparation of Feasibility Reports & BOQ for various upcoming projects such as Nabinagar STPP (3x660MW), Kudgi STPP (3x800MW), Dhuvran STPP (2x660MW), Gajmara STPP (2x660MW), Adra STPP(2x660MW)• Involved in Pre award activities and Post award activities of various packages.• Responsible as a review engineer for detail engineering of CHP, AHP, FOHP & MRHS.• Managed R&M project for Ash Handling Systems (for 7 units totaling 1600MW), mitigating challenges arising due to interface issues, space constraints and multiple stakeholder requirements• Initiated and led process improvement efforts such as standardization of MDL, Technical Data Sheets; Preparation of checklists for reviewing drawings; Preparation of design criteria for CHP, AHP & FOHP.• Lead TCMs with various vendors on engineering and design issues ; Preparation of Minutes of meeting • Preparation of excel based programs for various sizing calculations.• Undertook a project - “Benefits of HCSD system over Conventional LSDS” for two thermal plants, establishing that there is indeed reduction in land usage and water requirement in HCSD system.• Spearheaded digital drive at the departmental level – digitizing Technical Specifications, Feasibility Reports, and Tender Drawings etc. Projects:1. CHP, AHP, FOHP & MRHS of Barh Super Thermal Power Plant- Stage-II (2x660MW) worth approx. 500 Cr2. CHP, AHP, FOHP & MRHS of Nabinagar Thermal Power Plant (4x250MW) worth approx. 400 Cr. Show less

Education

  • National Institute of Technology Rourkela
    Bachelor of Technology (B.Tech.), Mechanical Engineering
    2004 - 2008

Community

You need to have a working account to view this content. Click here to join now