Slobodan Cvetković

Senior Piping Engineer at ids industrieservice anlagebau
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Serbia, RS
Languages
  • English Professional working proficiency
  • German Elementary proficiency
  • Serbian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Germany
    • 1 - 100 Employee
    • Senior Piping Engineer
      • Aug 2019 - Present

      Working at the Chemie Event 2010 Project in Shell Deutschland Oil GmbH, Rheinland Refinery, Wesseling. Engineuring and design of process piping. Reviewing of existing solutions. Working at the Chemie Event 2010 Project in Shell Deutschland Oil GmbH, Rheinland Refinery, Wesseling. Engineuring and design of process piping. Reviewing of existing solutions.

    • Germany
    • Utilities
    • 1 - 100 Employee
    • Senior piping engineer
      • Mar 2016 - Jul 2019

      Type of business: Senior site engineer responsible for construction of integral piping on Units 3 / 4 / 5 / 6 at Kusile Power Station 6x800MW Construction Project Proportion office / field work: 40 / 60 - Responsible for installation of HP integral piping for 4 units. - Review & adjustment of engineering solutions. - Construction schedules. Software used: AutoCAD, Excel, Type of business: Senior site engineer responsible for construction of integral piping on Units 3 / 4 / 5 / 6 at Kusile Power Station 6x800MW Construction Project Proportion office / field work: 40 / 60 - Responsible for installation of HP integral piping for 4 units. - Review & adjustment of engineering solutions. - Construction schedules. Software used: AutoCAD, Excel,

    • Kazakhstan
    • Construction
    • 200 - 300 Employee
    • Senior construction engineer
      • May 2014 - Feb 2016

      Type of business: On field construction of pipe racks and pipelines on oil terminals GNPS1 and NPS2Proportion office / field work: 10 / 90- Responsible for construction of pipe racks and pipelines.- Review & adjustment of engineering solutions acc. To GOST.- Construction schedules.- As BuiltSoftware used: AutoCAD, Excel

    • Lead workshop engineer
      • Mar 2013 - May 2014

      POSITION: Lead workshop engineer; As a lead workshop engineer I am responsible for: - Production organization (work organization for around 100 workers, scheduling, material take-off, engineering support, quality assurance); - Reporting to general management about efficiency and productivity; - Supervising that all work will be finished on time and in safe manner; POSITION: Senior construction engineer; During this period I was working on next Project: Construction of OIL REFINERY,Antipino, Tyumen, Russian Federation My main responsibilities ware: - Senior construction engineer for pipe racks, technological structures and similar steel constructions; - Senior construction engineer for underground piping; - Review & adjustment of engineering solutions; - Construction schedules; - As Built; Show less

    • Mechanical Engineer
      • Feb 2012 - Mar 2013

      POSITION: Senior piping erection engineer. During this period I was working on next Project: Replacement of stow B at POWER PLANT Drmno, Serbia Since October 2012 I was working on replacement of stow B at 375MW Power Plant Drmno, Serbia. My main responsibilities ware: - Senior construction engineer; - Review & adjustment of engineering solutions; - Commissioning; - Construction schedules; - As Built; Pancevo OIL REFINERY modernization project 77,000Nm3/h hydrogen generation unit; Since beginningof 2012 I was working as a lead piping erection engineer on project Pancevo oil refinery modernization project 77,000Nm3/h hydrogen generation unit. My main responsibilities ware: - Senior construction engineer for all above ground CS, AS and SS piping; - Commissioning; - Construction schedules; - As Built; Show less

    • Serbia
    • Machinery Manufacturing
    • Head of department
      • May 2011 - Feb 2012

      POSITION: Branch office executive. INOS-SINMA a.d., Sevojno, Serbia, is amongst the leading recycling companies in Serbia. As an executive of branch office in Pancevo my key responsibilities were: - Work organization in accordance with adopted standardsand procedures; - Contracts with third party and Logistics; - Administration and HR Management POSITION: Branch office executive. INOS-SINMA a.d., Sevojno, Serbia, is amongst the leading recycling companies in Serbia. As an executive of branch office in Pancevo my key responsibilities were: - Work organization in accordance with adopted standardsand procedures; - Contracts with third party and Logistics; - Administration and HR Management

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • May 2009 - May 2011

      Since beginning of 2009 I’m working as a Project engineer for Petrolcomet Oil Services company, a small contractor company, whose main activities are construction, engineering and technical services. Depending of projects, my responsibility starts with cost estimations and assistance in preparation of offers during the bidding stage, and afterwards, if we were awarded with contract, I was responsible for engineering, design, project planning and supervising. During this period I was working on next Projects: - Installation of Fire protection systems on two tanks and Fire Detection systems on the floating roof tanks at Tobruk REFINERY in Libya; - Refurbishment of one tank at RasLanuf REFINERY in Libya; - Upgrading of the fixed installed fire fighting system at two GAS FIELDS in Libya; - The new Meters installation & calibration device replacement at Tobruk REFINERY terminal in Libya; - The new Meters installation at Nafoora OIL FIELD in Libya Show less

    • North Macedonia
    • Retail
    • 1 - 100 Employee
    • Mechanical Engineer
      • Sep 2005 - May 2009

      I was working as a mechanical engineer in research and development department in aluminium extrusion plant. During this period I was responsible for: 2006 – 2009 POSITION: Chief of Research and Development Department: - Development of new systems of aluminium profiles, - Technical support and supervision, - Correspondence with foreign companies – suppliers, - Procurement of materials and equipment, - Maintenance of extrusion press and surrounding facility, - Planning and organization. 2005-2006POSITION: Mechanical Engineer: - Design of new systems for aluminium doors, windows and building facades, - Design of profiles for aluminium extrusion, - Design of programs for cutting on numerical machine, - Construction of glass facades or composite panelfacades with aluminium or steel assembly Show less

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jan 2005 - Sep 2005

      During the first half of 2005, I was working as a site engineer on construction of DESALINATION PLANT in Libyan town Zuara. I was employee of Slovenian company HIDROMONTAZA but main contractor for this job was French company SIDEM. My responsibilities were: POSITION: Mechanical Site Engineer: - Construction of desalination plant in Libyan - town Zuara, - Preparation works and construction organization of steel and GRP pipelines, - Preparation works and construction organization of steel elements for supporting structures, pipe racks and walkways, - As-Built documentation for pipelines and steel construction, - Supervision during construction of prepared steel elements Show less

    • Poland
    • Business Consulting and Services
    • Mechanical Engineer
      • May 2004 - Jan 2005

      I was working on projects that include reparation of process equipment that usually was coming from nearby OIL REFINERY and PETROCHEMICAL complex. - Projects that include inspection, dismantling, reparation and installation of various process equipment (pressure vessels, heat exchangers), - Projects for new Piping systems, new process equipment and As-Built projects, - Involved in preparation of various technical documentation. I was working on projects that include reparation of process equipment that usually was coming from nearby OIL REFINERY and PETROCHEMICAL complex. - Projects that include inspection, dismantling, reparation and installation of various process equipment (pressure vessels, heat exchangers), - Projects for new Piping systems, new process equipment and As-Built projects, - Involved in preparation of various technical documentation.

Education

  • Faculty for Mechanical Engineering, University of Belgrade
    Master of Science (MSc), Industrial Engineering
    1993 - 2003

Community

You need to have a working account to view this content. Click here to join now