Sliman ENNAYRI, PMP®

Site Manager at Nareva Enel Green Power Morocco
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Languages
  • Français Native or bilingual proficiency
  • Arabe Native or bilingual proficiency
  • Anglais Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Tarik Bakeli, Ph.D., Eng.

We’ve collaborated on a number of projects under the JESA Field Technical Services Department, and Slimane was one of the best team members I’ve ever had. I would strongly recommend his services to anyone in need of a Senior Field engineer. He is the wisest person I have ever met, and his talent to solve any situation with a smile is amazing. Any team would love to have Slimane as its member!

Younes DHIBA, PMP®

I have worked with Mr. ENNAYRI on two occasions (2 projects, in total 3 to 4 years), and I have seen him on the field managing construction and commissioning activities in a very effective way. Mr. ENNAYRI is a very insightful manager, with a very good technical background and knwoledge that give him notoriety among the team he is managing, the contractors, and the client.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • GWO
    Global Wind Organisation
    Mar, 2022
    - Nov, 2024
  • Project Management Professional (PMP®)
    Project Management Institute
    Sep, 2020
    - Nov, 2024

Experience

    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Site Manager
      • Jan 2022 - Present

      850 MW Integrated Wind Power Project 850 MW Integrated Wind Power Project

    • Morocco
    • Construction
    • 700 & Above Employee
    • Senior Project Engineer
      • Jan 2021 - Jan 2022

       Preparing, scheduling, coordinating, and monitoring of engineering projects. Formulating project parameters and assigning responsibilities to the mostcapable employees and monitoring the project team. Interacting with clients, interpreting their needs and requirements, andrepresenting them in the field. Performing quality control tasks on budgets, schedules, plans, and personnelperformance and reporting on the project's status. Cooperating and communicating with the project manager and other projectparticipants and collaborating with senior engineers to create more efficientproject methods and to maintain the project's profitability. Reviewing the engineering tasks and initiating the necessary correctiveactions. Developing specifications for the project's needed equipment. Creating frameworks to measure the project's metrics and data collection. Establishing field test methods and methods for monitoring the quality ofthose tests. Ensuring the project's compliance with the applicable codes, practices,policies, performance standards, and specifications.

    • Senior Field Engineer
      • Nov 2018 - Dec 2020

       Interact with electrical engineers and staff members to identify, define andresolve developmental issues. Conduct mechanical assembly utilizing power and manual tools. Contribute to constant upgrading of product documentation. Direct and assist technically Electrical Superintendents and crafts. Oversee and coordinate performance and routine activities of electrical fieldengineering personnel. Conduct electrical progress work inspections on continuous basis along withcomplete end electrical installations checkout. Ensure quality and compliance to parameters and codes preceding turnoverto client establishment. Support project controls and supervise detailed work plans as well as minischedulesestablishment. Coordinate and record client as well as vendor needed electrical installationsand tests verifications. Coordinate with Electrical Engineers to solve drawing as well as set-routeproblems. Inspect permanent plant components through receiving process to ensureproject drawings and standards are attained. Coordinate and check subcontractors in electrical field engineering. Perform inter-discipline checks. Compliance in accordance with HSE Standard.

    • Commissioning Engineer
      • Sep 2017 - Nov 2018

      Project Name : DOWNSTREAM: Construction of a FLASH DRYER AND CLASSIFIER ofPhosphate (Designed to dry 1400 t/h);Vender: FLSMIDTHOwner : OCP Group , ELJORF, ELJADIDA MOROCCO-Receives Project documentation and understands Scope of Work.-Report to Commissioning Manager as per project Organization chart.-Lead a team to undertake commissioning activities in the projects.-Implement & test the subsystems as per project commissioning test sheets.-Preparation of method statements, procedures and routines where required.-Interface towards Pre-commissioning and Company personnel.-Reports on work progress, bringing to notice potential problems or delays andrecommends solutions.-Assist in Vendor activities as required.-Ensure temporary supplies and commissioning spares are adequate for thesubsystem testing;-Perform inter-discipline checks.-Compliance in accordance with HSE Standard.

    • Electrical Commissioning Engineer
      • Dec 2016 - Sep 2017

      Project Name : ODI2 JFC3: Construction of Fertilizer Production Plant, Phosphoric Acid Plant andSulfuric Acid Plant.Owner : OCP Group , ELJORF, ELJADIDA MOROCCO-Execute Electrical commissioning activities-Ensure a high standard of safety is achieved and Environmental and QualityAssurance procedures are followed;-preparation of pre-commissioning, commissioning and start up plans andprocedures-Participation in start-up sequence workshops with both client and contractors-Development of completions work packs and plans-Commissioning tests of MV/LV sub-station

    • Spain
    • Renewable Energy Semiconductor Manufacturing
    • 700 & Above Employee
    • Site Engineer
      • Jan 2015 - Dec 2016

      Managing construction of 400 KV overhead power transmission lines-Schedule the work in accordance to project timeline and deadlines- Supervise project execution, evaluate and monitor manpower productivity- Supervise electrical supervisors and foremen's.- Maintain the different phases of the project and evaluate all the technicalproblems and resolve them- Prepare Technical documents and ensure that the work was carried inaccordance to the drawings and specifications-Coordinate with Client, Subcontractors and various stakeholders involved inthe project- Liaise with the client and consultants resolving all on-site and contractualproblems.- Write reports about work process and completion rates.- Verify and validate all work permits, work method statement and proceduresof the general contractors and all electrical subcontractor on site.

    • Ingénieur technico-commercial
      • Sep 2014 - Dec 2014

      Réalisation des études de marché ; Prospection des clients et présentation des produits (Moteurs, Variateurs et Motoréducteurs) ; Réalisation et négociation des devis. Réalisation des études de marché ; Prospection des clients et présentation des produits (Moteurs, Variateurs et Motoréducteurs) ; Réalisation et négociation des devis.

    • Graduation Project & internship
      • Mar 2014 - Sep 2014

      Design and implementation of the control system controlling a DC machine using a card withthe same time a Digital Signal Processor (DSP) and Field Programmable Gate Array (FPGA)- Elaboration of the speed control loop of the DC machine- Simulation of the control onMatlab Simulink (Igniter thyristors, current loop and speed loop)- Configuring the igniter thyristors on FPGA using VHDL (Xilinx ISE)- Current controller programming and speed DSP (TMS320F2812) using CCS tool Design and implementation of the control system controlling a DC machine using a card withthe same time a Digital Signal Processor (DSP) and Field Programmable Gate Array (FPGA)- Elaboration of the speed control loop of the DC machine- Simulation of the control onMatlab Simulink (Igniter thyristors, current loop and speed loop)- Configuring the igniter thyristors on FPGA using VHDL (Xilinx ISE)- Current controller programming and speed DSP (TMS320F2812) using CCS tool

    • France
    • Information Technology & Services
    • 700 & Above Employee
    • Engineering internship
      • Aug 2013 - Sep 2013

      Établissement d'une gamme de maintenance des vannes TOR et régulatrices. Établissement d'une gamme de maintenance des vannes TOR et régulatrices.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Stage téchnique
      • Jul 2012 - Aug 2012

      Automatisation d’un manège d’emplissage de gaz en utilisant un automate (SIEMENS S7 200) Etude critique du système existant ; Proposition et conception d’une solution pour l’amélioration de rendement du système ; Choix du type du matériel nécessaire pour la réalisation de la solution proposée. Etude technico-économique du projet Automatisation d’un manège d’emplissage de gaz en utilisant un automate (SIEMENS S7 200) Etude critique du système existant ; Proposition et conception d’une solution pour l’amélioration de rendement du système ; Choix du type du matériel nécessaire pour la réalisation de la solution proposée. Etude technico-économique du projet

    • Morocco
    • Mining
    • 700 & Above Employee
    • Stage d'initiation
      • Aug 2011 - Aug 2011

      Découverte de l'entreprise et accompagnement des équipes de maintenance Découverte de l'entreprise et accompagnement des équipes de maintenance

Education

  • ENSA Khouribga
    Ingénieur d'état, Génie électrique
    2009 - 2014

Community

You need to have a working account to view this content. Click here to join now