Slavoljub KOSTADINOVIC, P.Eng

Mechanical Engineer at Dynamic Air Shelters
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Calgary, Alberta, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • P.Eng
    The Association of Professional Engineers and Geoscientists of Alberta (APEGA)

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jan 2019 - Present

    • Canada
    • Truck Transportation
    • 1 - 100 Employee
    • Courier
      • Jul 2018 - Dec 2018

    • Software Developer Intern At Enfocom
      • May 2018 - Jul 2018

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Object Oriented Software Developer
      • Oct 2017 - May 2018

    • Machinery Commissioning/Startup Supervisor
      • May 2015 - Oct 2015

      Oil Refinery Rotating Machinery Mechanical completion/ Functional Testing/ Commissioning/ Startup

    • Mechanical Construction Coordinator
      • Sep 2014 - Apr 2015

      • Provided technical advises to the contractors related to equipment, packages installation• Supervised the installation of pumps, packages, compressors, pressure vessels, tanks, heat exchangers• Provided technical advice related to problem with the alignment, foundation, grouting, and elevation• Coordinated with QA/QC/Client team for the inspection of mechanical equipment • Coordinated mechanical equipment activities with pre-commissioning and commissioning team • Supervised closing of punch items as a part of mechanical completion and turn-over to the client

    • Package specialist
      • Feb 2013 - Sep 2014

       Interface with other disciplines on daily basis to eliminate flaws and develop safe and efficient designs.  Selecting, recommending a project equipment as per process requirements, data sheets, pump curves.  Analyzing equipment influences on other parts of the plant by building charts to analyze related data.  Understanding and incorporating industry standards into engineering work.  Executing material requisitions and other technical documents related to the project.  Prepared a technical deviation requests TDRs to deviate from client specifications.  Prepared a requests for information RFIs to get client's approval and/or technical clarification.  Analyzing technical data, GA drawings and other data provided by the vendors to assure compliance with client and project requirements.  Providing with technical input to cost estimates and engineering design.  Preparing datasheets, specification for sour water pumps, seal pots and other auxiliaries equipment.

    • Mechanical Construction & Commissioning Coordinator
      • Aug 2010 - Feb 2013

       Evaluated project documentation, specifications, codes, procedures, drawings, data sheets, pump curves and scope of work.  Checked if received equipment and packages are as per client standards, P&IDs and GA drawing  Determined methods and solutions for engineering problems and select the most efficient in meeting the project objectives.  Prepared a technical deviation requests TDRs to deviate from client specifications.  Prepared a requests for information RFIs to get client's approval and/or technical clarification. Main interface and liaison for construction interference, integration management, and effective coordination of construction activities, contractors and suppliers.  Supported site administration requirements, including quality monitoring, field engineering, materials management and turnover.  Evaluated project progress and created reports for client submittal.  Prepared a commissioning procedure for packaged equipment and systems  Executed commissioning of plant sub-systems

    • Research Engineer Assistant
      • Sep 2009 - Aug 2010

       Provided with the technical solution, design, and operation of an experimental project to maximize productivity and efficiency in oil sand industry.  Executed hydraulic calculations and analysis of the experimental set up.  Performed optimization of the system parameters for timely and cost effective execution (layout, pump, piping, tank, and jet nozzles).  Provided with the technical solution and design of the project nozzle joint.  Executed the 3D model of the project nozzle join by using SolidWorks software.  Selected the major project equipment as per process and project requirements and facility limitations.  Processed and analyzed data.

    • Chemical Manufacturing
    • 400 - 500 Employee
    • Plant Layout Engineer
      • Jan 2008 - Jan 2009

      Reviewed and evaluated project documentation, standards, codes and data sheets. Executed 3D models of a chemical-industrial plants as per project P&IDs, standards and codes. Prepared 3D models of a plant equipment as per project data sheets. Arranged a layout of plants, HVAC systems, plant equipment, piping and pipe-lines as per projectdocumentations, P&IDs, standards, regulations and limitations. 3D models built by using PDMS software. Executed project documents and drawingsRas Tanura, DOW-Chemical, 300 KTPA high-density polyethylene (HDPE), Saudi Arabia.Kalush, LUKOIL Chemical Group, 300 KTPA of suspension PVC (S-PVC), Ukraine.LDPE-3, QAPCO Qatar Petrochemical Co., 300 KTPA low-density polyethylene (LDPE), QATAR.

    • Plant Designer Engineer
      • Jan 2007 - Jan 2008

      Reviewed and evaluated project documentation, standards, codes, pump curves and data sheets. Executed 3D model of a pharmaceutical plant as per project P&IDs, standards and codes. Arranged a plant, equipment and pipe-lines layout within architectural limitations. Performed the plant steel structure to support and make major and auxiliary equipment accessible 3D models completed by using AutoPlant software. Reviewed and approved design of mechanical equipment, and plant vessels. Prepared project documentation, layouts, isometrics and required sections. Produced shop drawing to support plant fabrication.Bulk Vaccine Plant Project, GSK Singapore.

    • HVAC Engineer
      • Jan 2004 - Jan 2007

       Performed project thermal balance calculation. Prepared hydraulic calculations, dry and wet side. Produced project documentation, calculations and drawings. Executed a dry side, ductwork sizing, shaping, layout as per project documentation, thermal needs, airvelocities, sanitary needs, noise level. Executed a wet side, piping sizing and layout as per project documentation. Calculated required thermal power in order to select a proper HVAC equipment, major and auxiliaries. Built 3D model of a project HVAC systems per project P&IDs, standards, codes. Built 3D model of the HVAC equipment, major and auxiliary as per technical data sheets. 3D models created by using CADVent software. Effective liaison with other technical departments (architectural, construction, electrical). Executed general plan of external networks (sewage, water and connections to related city networks). Managed and monitored installation works at construction site as well as final balancing of HVAC systems.“RADUGA” Shopping center, 4MW of heat consumption, St. Petersburg, Russia.“Hotel Jilska”, Prague, Czech Republic.“Four Seasons Hotel Gresham Palace”, Budapest, Hungary.

Education

  • Southern Alberta Institute of Technology (SAIT)
    Certificate, Object Oriented Software Development
    2017 - 2018
  • University of Belgrade
    Master's degree, Thermal Power Enginering
    1994 - 2003

Community

You need to have a working account to view this content. Click here to join now