Sizwe Calaza
Sinoir Technical Team Leader at SITECH SA- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
SITECH SA (Pty) Ltd
-
Construction
-
1 - 100 Employee
-
Sinoir Technical Team Leader
-
-
Hulamin
-
Mining
-
500 - 600 Employee
-
Quality strecher Operator
-
Jan 2010 - Jan 2011
• Checking Die failures for example shape, die lines, bearing mark and scoring• Checking dimensions according to tolerance book.• Make sure that each section is straight before it has cut according to customer requirement. • Checking Die failures for example shape, die lines, bearing mark and scoring• Checking dimensions according to tolerance book.• Make sure that each section is straight before it has cut according to customer requirement.
-
-
-
-
Draughtsman
-
Feb 2009 - Jan 2010
Planning for the City of Cape Town and minicipality buildings. Planning for the City of Cape Town and minicipality buildings.
-
-
-
-
Junior Process Engineer
-
Feb 2008 - Jan 2009
• I worked as an operator to become familiar with the machines and the processes for the period of five months. • I also did Process Capability, SPC (Statically Process Control), PFMEA (Potential Failure Mode Effective Analysis), Fishbone diagram and Error-proofing for all the Machines in the plant to reduce breakdown on machines.• Refurbishment of Master remover tank, this tank was used to wash compression springs, valves and orifice disc for the Sub-Assembly Cell – they build compression heads. It was change to a paint stripping tank for hangers, shock absorbers, struts and spinners. Initially the company was using a contractor (TMC) for paint stripping.• Assist Process Engineers to keep production in good quality.
-
-