Sinan Acar
Werkvoorbereider/ Construction Work Preparator at Bouwbedrijf M.J. de Nijs en Zonen B.V.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Türkçe Morsmål eller tospråklig kompetanse
-
İngilizce Komplett profesjonell kompetanse
-
Dutch Grunnleggende kunnskap
Topline Score
Bio
Experience
-
Bouwbedrijf M.J. de Nijs en Zonen B.V.
-
Netherlands
-
Construction
-
100 - 200 Employee
-
Werkvoorbereider/ Construction Work Preparator
-
feb. 2022 - - nå
-
-
-
TAV Construction
-
Construction
-
700 & Above Employee
-
Site Manager
-
des. 2018 - jan. 2022
Schiphol Airport A-Pier Project//Head of Structural Works (Structural Steel/ Concrete/ Staircases)• Responsible site manager overseeing and directing structural works consisting of steel structure, concrete and staircase subcontractors for 55.000m² airport extension project (reporting to General Construction Manager).• Supervising work processes and adherence to project schedule, and FIDIC contract requirements• Reviewing work progress on daily basis• Overseeing construction operations to monitor if operations are compliant with specifications and drawings• Liaising with on-site work preparators and off-site designers to clarify missing details and improve construction methodologies• Communicating daily with other trades such as MEP, facade, finishing to ensure teams are not clashing on workfronts• Coordinating support teams such as logistics, surveyors on daily basis to keep workforce operational and to ensure proper material handling• Arranging work inspections for finished works' handovers with QAQC team• Compliance with safe construction procedures in coordination with safety team• Preparing reports pertaining to job status• Conducting weekly planning meetings and daily follow-up meetings with subcontractors to review progress• Conducting weekly delivery meetings with consultant and management team to review progress and design Vis mindre
-
-
Site Architect Jr.
-
jan. 2015 - des. 2018
DAMAC Towers by Paramount project• Managed the 30.000 m2 marble and ceramic operations for the 60-floor Paramount Hotel tower and podium areas for hotel and residences Front of House areas below towers, from start to handover, in time and within specs. • Managed drywall, blockwork, plaster and fit out works in the hotel tower • Managed snagging, de-snagging and handing over processes for the hotel tower• Specific process experience in these assignments included:o Leading team of 100+ supervisors, foremen and workers of different disciplines on site o Prioritizing, organizing and supervising site operations and coordinating site teams and subcontractorso Following up site progress and giving out reports to planning and managemento Coordinating with MEP, Technical, Planning, QAQC, Survey, HSE and Procurement departments• Contributed to company-wide process improvements with self-initiated suggestions like site progress tracking sheets for consultant and client reports, adopted as the template for all project teams. Vis mindre
-
-
-
EAA-Emre Arolat Architecture
-
Türkiye
-
Architecture and Planning
-
1 - 100 Employee
-
Architectural Intern
-
aug. 2013 - sep. 2013
*Developed architectural drawings and made 3d modelings/visualizations for ongoing projects *Developed architectural drawings and made 3d modelings/visualizations for ongoing projects
-
-
-
Akturk Yapi A.S. / ZORLU CENTER Mixed Use Project
-
Civil Engineering
-
1 - 100 Employee
-
Intern Site Architect
-
jan. 2012 - sep. 2012
*Site supervision for Mall and Hotel finishing works *Site supervision for Mall and Hotel finishing works
-
-
Education
-
Istanbul Technical University
Bachelor of Architecture (B.Arch.), Architecture -
University of Central Florida
CMMS Intensive English Course -
Bilge Adam bilgi Teknolojileri Akademisi
3D Studio Max-Photoshop-VRay -
Nişantaşı Anadolu Lisesi
High School, Science-Maths Degree -
Terakki Vakfı Şişli Terakki Okulu
Elementary and Middle School