Simone Mola

Area Manager Middle East at Fincantieri Infrastructure
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Qatar, QA
Languages
  • English Professional working proficiency
  • Italian Native or bilingual proficiency
  • Latin -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

BRAHIM NASSIRI

I worked with Simone at the project mentioned below: - EXPANSION (DESIGN & BUILD) OF THE NAVIGATIONAL CHANNELS AND TURNING BASIN, Qatar - DESIGN & BUILD OF SIX ARTIFICIAL ISLAND, Qatar - NEW ISLAND AT NORTH LUSAIL, Qatar I have found him at all times to be both an enthusiastic and effective personality. Simone is very knowledgeable in the field of Project management, carrying with him a wealth of practical experience. Simone is never afraid to go the extra mile..! I found Simone to be a solid and sincere professional, with a charming character very pleasant to work with..!

Subhasis Bhaumik

Simone has specific specialization in Floating Structures. Very conversant with other marine structures and like breakwater, revetment, piled jetty etc.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Chartered Engineer
    Ordine degli Ingegneri della Provincia di Roma
    Apr, 2004
    - Nov, 2024
  • SCUBA - Advanced
    PADI
  • SCUBA - Open Water
    SSI Scuba Schools International

Experience

    • Italy
    • Civil Engineering
    • 1 - 100 Employee
    • Area Manager Middle East
      • May 2022 - Present

      Area Manager Fincantieri Infrastructure Opere Marittime Area Manager Fincantieri Infrastructure Opere Marittime

    • Denmark
    • Construction
    • 200 - 300 Employee
    • Design, Execution & Coordination Manager Marine Works - Immersed Tunnel
      • Aug 2020 - May 2022

      THE WORLD’S LONGEST IMMERSED TUNNEL - The 18 km immersed Fehmarnbelt tunnel will connect Denmark and Germany.https://femern.com/en THE WORLD’S LONGEST IMMERSED TUNNEL - The 18 km immersed Fehmarnbelt tunnel will connect Denmark and Germany.https://femern.com/en

    • Belgium
    • Civil Engineering
    • 700 & Above Employee
    • Project Manager - Design Manager - Technical Manager
      • Oct 2019 - May 2022

      Project Manager – Tender Manager – DEME OffshoreNLNG – TRAIN 7 Project – NigeriaEPCI of New LNG Jetty and PC of MOF2 Jetty ExtensionExecution of the Engineering, Procurement & Construction of the Train 7 LNG Jetty Facilities required at the project site and Procurement & Construction of Material Offloading Facility (MOF2) Jetty Extension. The LNG Jetty includes Marine facilities to allow receipt of LNG Carriers, accommodation of process facilities for products export, and ancillary systems associated with the above while MOF2 Jetty has been designed for oceanic transport vessels mooring and loading of the offloaded material.Design Manager – DI Saudi Arabia ECI - AMAALA TRIPLE BAY MARINA BASINThe Marina Basin’s layout shall maximize berthing opportunities for luxury boats and super yachts, including navigation/entrance channel, which provides access from the Red Sea to the proposed Marina, and two flushing channels to promote flushing by sea water from the Red Sea to maintain water quality. Two coastal islands will be formed and provided on either side of the navigation channel.Design Manager – Tender Manager – DEME OffshorePCI of EMPIRE WIND FARMThe project is expected to be developed with 60-80 wind turbines, with an installed capacity of more than 10 MW each. Procurement, Construction & Installation of the GBFs (Gravity Base Foundations up to 6500 tons) includes Marine transportation of both GBFs and TPs.

    • Construction
    • 1 - 100 Employee
    • Technical Manager
      • May 2018 - Sep 2019

      Gewan Island Marine WorksDoha, Qatar - $75mExecution of the marine works including marine dredging and reclamation, the construction of sand beaches, shore protection rock revetments, breakwaters, and quay walls for Gewan Island.Duties involved control of the works related to the construction of the 1,27 km of Concrete Quay Wall, testing of the Concrete, review of the design, installation of the blocks and dealing with Client Representative. Gewan Island Marine WorksDoha, Qatar - $75mExecution of the marine works including marine dredging and reclamation, the construction of sand beaches, shore protection rock revetments, breakwaters, and quay walls for Gewan Island.Duties involved control of the works related to the construction of the 1,27 km of Concrete Quay Wall, testing of the Concrete, review of the design, installation of the blocks and dealing with Client Representative.

    • Project Manager
      • Jan 2018 - Apr 2018

    • Construction
    • 1 - 100 Employee
    • Project Manager
      • Jul 2016 - Dec 2017

      - EXPANSION (DESIGN & BUILD) OF THE NAVIGATIONAL CHANNELS AND TURNING BASIN- DESIGN & BUILD OF SIX ARTIFICIAL ISLAND- NEW ISLAND AT NORTH LUSAILSupervision in accordance with General Conditions of Contract strictly based on FIDIC rules for large and challenging projects.Coordination of coastal and marine projects including engineering consultancy, construction administration & site supervision services. Organize and manage his staff to optimize the performance in their assignment.Supervise works to ensure design and specification requirementIssue construction and drawing to the to the contractor’s agentReview Contract document and recommending action by the ClientMonitoring progress against the program and undertaking corrective action Review payment proposal before recommendation to the Client, Finalize Change of Scope give advice on claimVerify all the necessary document for Variation Order, Taking Over Certificate, Snag List...Projects include marinas, breakwaters, artificial islands, navigational channels, floating pontoons, beaches etc and are in various stages of design phase or constructionInspection on site to verify the adherence of specifications, standards and drawingsClient liaison and coordination with stakeholders during design/construction phase.Review of technical documents HR responsibilitiesCost processing Preparation of technical & financial proposals for marine design/supervisionBusiness Development of company in the field of Marine Consultancy Services

    • Civil Engineering
    • 1 - 100 Employee
    • Marine Specialist
      • Jun 2016 - Dec 2017

      KOC SMALL BOAT HARBOURS PROJECT Supervision Consultancy Services Marine Facilities Upgrading Project which comprises Quay Wall, Breakwater, Revetment, Dredging, Reclamation, Soil Improvement, Shiplift, Floating Structures, Slipways etc.Work closely to the Marine Project Manager to assist him to review the technical drawings/technical reports/design documents etc. mainly for Quay Wall, Breakwater, Revetment, Floating Structures.Participate to the construction meeting/Progress Meeting to monitor the progress.Co-ordinated with Client Rep/ Technical Managers & Team from Contractor to discuss technical issues & provide feasible solution.Make random inspection on site to verify the adherence of specifications, standards & drawings.http://www.sshic.com/projects/koc-marine

    • CEO, Project Manager, Senior Marine Engineer
      • Sep 2013 - Jun 2016

      Yacht harbor specialistTouristic Harbour of Crotone – (April 2016 - July 2016)Executive project and design, construction management and installation of 10 new floating pontoons ALL IN CONCRETE 12x2,5 m 13,5 ton, mooring system for boat up to 45 m, electrical pedestal, gangway and a floating slipway of 12x10 mLe Maldive 2 – July 2016Executive project and design, construction management and installation of floating pontoon 70x2,5 m realized by HDPE cubic floats.Columbus Yachting Trapani – (Feb. 2016 - April 2016)Executive project and design, construction management and installation of 5 new floating pontoons ALL IN CONCRETE 12x2,5 m 13,5 tonCIRCOLO CANOTTIERI ANIENE (ROME) – (June. 2015 - Jan. 2016)Executive project and design, construction management and installation of floating platform about 25x10 m with a gym house of 20x8 m with 2 floor and a small rowing platform about 18x5 m

    • General Manager, Marine Engineer, Project Manager
      • Oct 2012 - Jun 2016

      Yacht harbor specialistManage construction projects including, jetties, mining pontoons and marinas, floating pontoons, wave attenuator, marina projects and layout, fixed pontoons, vertical breakwater with anti reflection cells, mooring system for boat, mega and giga yacht, marine installation and marina managementDeliver marine projects on time within budget including progress reports, proposals and variationsPorto Ercole – Tuscany:Executive project, construction management and installation of floating pontoons and accessories, totally up to 230 m of pontoons and accessories to moor boats up to 30 mMarina Sveva – Adriatic Sea:design, construction management and installation of floating pontoons and accessories, totally up to 500 m of pontoons and accessories to moor boats up to 25 mParadise Resort - Sardinia:Executive project, construction management and installation of floating bridge, totally up to 30 m of floating systems and accessoriesPorto Cervo – Sardinia:design, construction management and installation of floating pontoons and accessories in Porto Cervo/new harbor and in Porto Cervo/oldest harbor; totally up to 230 m of pontoons and accessories to moor boats up to 30 mPorto Rotondo – Sardinia:design, construction management and installation of 50x5 m floating pontoons, mooring system and accessories to moor boats up to 30 mPortus Karalis –Cagliari - Sardinia:design, construction management and installation of 200x6 m floating pontoons and mooring system to moor alongside boats up to 100 m; 150x3 m floating pontoons and mooring system to moor boats up to 40 mSan Vincenzo Harbor Marina – Tuscany:design, supervision of construction and installation of 960x2,5 m of floating pontoons, n° 150 finger up to 15 m and accessories totally for 400 boats up to 30 mPorto Cervo molo A – Sardinia:design and supervision of construction of the new concrete pier, mooring system and accessories for mooring gigayachts up to 150 m

    • Founder and CEO
      • Jan 2009 - Oct 2012

      PR Communication Manager for Marina di Porto Rotondo Group.Since 2009 I worked with "Marina di Porto Rotondo" in Sardinia with the Managing Director in order to increase their commercial area and was also PR communication manager for the "Porto Rotondo Group" that include 5 marinas in Sardinia which are "Marina di Cala Bitta", "Marina di Portus Karalis", "Marina di Punta Marana", "Marina di Porto Rotondo" and "Marina di Bosa".In 2010 I organized an event in “Porto Rotondo” with the possibility to make a test drive with Jaguar and Lotus, I collaborated with Yacht Club Porto Rotondo to organize their fishing games “Big Game” and I gave logistic help to the Marina to organize “6 Porto Rotondo Boat Show”; in 2011 I organized the “7 Porto Rotondo Boat Show”, an event with Jaguar and with a F3 car. I made also “Porto Rotondo – la Marina” a magazine of lifestyle in Porto Rotondo that was delivered to all customers of the Marina Group.

    • Italy
    • Telecommunications
    • 1 - 100 Employee
    • Consultant
      • May 2012 - Jun 2012

      Consultant Consultant

    • General Manager, Project Manager, Commercial Director
      • Mar 2005 - Jun 2012

      Coordination and management of customers to create their Marinas, coordination of work teams for installation, design and project management, optimization of the layout of marinas, Project ManagerYacht harbor Specialist, floating pontoons, wave attenuator, marina projects and layout, fixed pontoons, jetty, vertical breakwater with anti reflection cells, mooring system for boat, mega and giga yacht, marine installation and marina managementAmerica’s Cup World Series 2012-2013 – Bagnoli – Naples:I was involved with “Impresa Pietro Cidonio SpA” one of the bigger italian marittime company to the tender for the award of the work of the America's Cup World Series in 2012 in Bagnoli - Naples, where I project n°17 floating breakwater of 20x5x3, 95 m weight up to 165 tonnes, all mooring systems, 500x2, 5 m of floating pontoons, 100x5 m floating dock and the specialist report. The work we have been awardedLusben Craft – Viareggio – AZIMUT/BENETTI: design dock for refitting boats with fixed pontoons wide 5 m total length of 300 m, design and installation of mooring system for boats up to 70 m with 70 knots of wind;Cantieri del Sud – Taranto:design, construction management and installation of n°11 floating breakwater 20x4x2,4 m weight up to 91 t, 100 m of floating pontoons, , mooring system and accessories up to 200 boatsCantieri di Bari – Bari:design, supervision of construction and installation of 400x2,5 m fixed pontoons and mooring systemMarina di Nido d’Aquila – La Maddalena - Sardinia: tourist harbor design, construction management and installation of floating pontoons and accessories for 230 boatsYachting Club Torre a Mare – Bari:tourist harbor design, construction management and installation of floating pontoons and minifinger for 250 boatsADPS Prà Sapello – Genova:tourist harbor design, construction management and installation of floating pontoons and minifinger for 400 boats

    • Consultant, project manager
      • Apr 2009 - Apr 2012

      Project manager, design and construction supervisionTourist harbor of Cariati - Catanzaro:design, construction management and installation of n°4 floating breakwater 20x4x2,4 m weight up to 91 t, 340 m of floating pontoons, , mooring system and accessories up to 250 boats Fertilia Harbor Marina – Sardinia:design, construction management and installation of floating pontoons and accessories totally up to 350 m of floating pontoons and mooring systemCala di Volpe – Porto Cervo – Sardinia:design, construction management and installation of 30x2,5 catwalk over the cliff in private villa, little catwalk to reach the private floating pontoons where we moor only one private boatSporting Cinquale – Forte dei Marmi - Toscany:tourist harbor design, construction management and installation of floating pontoons for 150 boats; project, construction and installation of a mobile bridge draw steel and floor-wood , light overall length up to 18 m Varazze Harbor – Liguria:project, construction and installation of a mobile bridge draw steel and floor-wood , light overall length up to 25 m

    • consultant
      • Jun 2009 - Mar 2012

      Design and construction supervision Design and construction supervision

    • YCC Commercial Director
      • Jun 2004 - Jun 2005

      Yacht Club Channel - TV ChannelMarina Management Yacht Club Channel - TV ChannelMarina Management

    • Sales Engineer
      • Jun 2003 - Jun 2004

      Yacht Harbor Specialist, floating pontoons, wave attenuatorBadolato Harbour Marina - Catanzaro: tourist harbor design, construction management and installation of floating pontoons for 310 boatsCircolo Albatross - Como Lake: design, construction management and installation of floating pontoons and 6 m catwalk Yacht Harbor Specialist, floating pontoons, wave attenuatorBadolato Harbour Marina - Catanzaro: tourist harbor design, construction management and installation of floating pontoons for 310 boatsCircolo Albatross - Como Lake: design, construction management and installation of floating pontoons and 6 m catwalk

    • Italy
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Sales Engineer
      • May 2002 - Dec 2002

      Yacht Harbor Specialist, floating pontoons, wave attenuator Yacht Harbor Specialist, floating pontoons, wave attenuator

Education

  • Università degli Studi di Roma Tre
    Master's Degree in Marine Civil Engineering, Marine Civil Engineering
    -

Community

You need to have a working account to view this content. Click here to join now