Simon Bingham
General Manager at Malabar Associates Pty Ltd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Dutch Professional working proficiency
Topline Score
Bio
Experience
-
Malabar Associates Pty Ltd
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
General Manager
-
Sep 2020 - Present
Project Development Project Development
-
-
-
Realtor
-
Oil and Gas
-
1 - 100 Employee
-
Project Development Manager
-
Feb 2019 - Present
Management of all aspects of oil and gas developments from appraisal to project execution Management of all aspects of oil and gas developments from appraisal to project execution
-
-
-
Quadrant Energy
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
Development Manager
-
Jun 2015 - Mar 2019
Managed multiple external pre-FEED engineering studies for NWS: Carnarvon & Bedout areas. Preliminary engineering concept designs for various gas tieback opportunities to Varanus Island including: Spartan, Kultarr, Ginger and Denver, achieving typically rates of return (AT)> 30%. Development planning for the recent Bedout field discoveries including: Phoenix South, Roc & Dorado: o Studies included stand alone oil export; domestic gas export; LPG export & near shore LNG. o Developed the engineering and costs basis for all upstream facilities from the wellhead to the delivery pipeline. Total development costs ranging from U$1B - U$4B Prepared multiple field development scenario estimates using Que$tor development planning tool.
-
-
-
Apache Corporation
-
Oil and Gas
-
700 & Above Employee
-
Project Manager
-
Sep 2013 - Jun 2015
Engineering Manager – Canada 2013 – 2015Managed pre-FEED engineering for the Apache & Chevron joint venture onshore Kitimat LNG development.Developed the engineering and costs basis for all upstream facilities from the wellhead to the delivery pipeline. Facilities included: o Multiple unconventional gas well pads in the Liard & Horn River basins; o Water delivery and treatment systems; o Raw gas gathering and water pipelines; o Gas dehydration and compression facilities in the fields; o Export pipeline to gas plant; o 2BCFPD gas plant.Part of Apache Canada asset team involved in the successful divestment of the field and LNG facilities to Woodside Petroleum for $2.8B, 2015.
-
-
Project Development Manager
-
Jan 1991 - Aug 2013
Project Manager & Chief Facilities EngineerManaged all Appraisal and FEED work on the following prospects and developments: o Taunton oil field; o Zola area gas strategy studies including review of CO2 sequestration, GTL, LNG, domestic gas, ammonia, urea and methanol options. o Various well & pipeline tie-back studies.Managed multiple projects including: o Halyard gas field subsea tie-back; project highlight: less than 3 years from discovery to first gas achieved ahead of schedule o Apache’s 1ST FPSO development at Van Gogh, responsible for start-up and SURF development; U$560MM development, started up in 2010 at > 40,000 bopd, project pay-out < 1 year o Gipsy subsea and Simpson “fast track” minowpod oil field developmentsField Development Manager for Apache Egypt, responsible for the full field development plan including offshore gas fields, subsea infrastructure, pipelines, onshore gas plants and facilities for multi-TCF West Med gas field development, successful divestment to Amerada Hess for U$413MM, 2005.As Chief Facilities Engineer, ensured the integrity of all assets including offshore platforms & pipelines and onshore gas & oil facilities and pipelines.Prepared plans for expansion of onshore gas plant and pipeline facilities & development plans after Apache obtained operator ship from Repsol Poland, 1997.East Spar Development; part of Alliance Management team, directly involved with novel decision to use control buoy & subsea tie-back to VI, 1995.As Project Engineer, oversaw the development of Apache’s first domestic gas plant and infrastructure in Australia; Harriet Gas Project, 1991.
-
-
Education
-
City, University of London
Bachelor of Science - BS, Civil Engineering