Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Level 3 Certificate in the Requirements for Electrical Installations
    City and Guilds of London Institute
    May, 2009
    - Sep, 2024
  • Microcomputer Systems Installation and Maintenance 2
    City and Guilds of London Institute
    May, 2002
    - Sep, 2024
  • NVQ Certificate of Competence, Electrical Installation Level 3
    City and Guilds of London Institute
    Aug, 1995
    - Sep, 2024
  • CITB Electrical Installation Competencies Part 2
    City and Guilds of London Institute
    Jun, 1995
    - Sep, 2024
  • Practical Skills Test for Installation Electricians - Achievement Measurement 2
    City and Guilds of London Institute
    Jun, 1995
    - Sep, 2024
  • Practical Skills Test for Installation Electricians - Achievement Measurement 1
    City and Guilds of London Institute
    Nov, 1993
    - Sep, 2024
  • CITB Electrical Installation Competencies Part 1
    City and Guilds of London Institute
    Aug, 1993
    - Sep, 2024

Experience

    • Site Supervisor
      • Sep 2020 - Present

    • Electrical Service Technician
      • 2016 - Sep 2020

    • United States
    • Packaging and Containers Manufacturing
    • 700 & Above Employee
    • Engineering Coordinator
      • Feb 2015 - Jun 2015

      From the dates mentioned, I was promoted to the position of Engineering Coordinator. This position required me to organise and oversee all the required maintenance, project work and any machinery installations across the entire site. In this position I managed the work load, Preventative Maintenance Schedule and Project Work for the maintenance shifts and liaised with the Team Leaders of those shifts to deliver the required work, on time and to a high standard.

    • Engineering Shift Team Leader
      • Apr 2010 - Feb 2015

      Between the dates mentioned I was promoted to the position of Engineering Shift Team Leader. This position required me to organise and oversee the following electrical and mechanical work;- Installation and commissioning of new machinery- Manage and maintain good working practices of the department staff- Modify existing machinery to latest Safety Requirements- Install Cat 5E networks, Security Cameras and VOIP telephony systems- Implement Planned Preventative Maintenance schedule for all four sites- Manage and schedule work for the Engineering department, covering the four sites that Solo Cup Europe operate from.- Liaise with outside contractors for work to be done on site- Source and procure required parts for the production lines and related projects- Implement continuous improvement programme to increase production efficiencies Show less

    • United States
    • Consumer Goods
    • 400 - 500 Employee
    • Shift Maintenance Electrician
      • Sep 2002 - Apr 2010

      Between these dates I was employed by Solo Cup Europe, in the position of Shift Maintenance Electrician, on a four on four off shift rota. This role involved the following work; - Electro-Mechanical maintenance of fifty styrene bead formers, eleven thermoforming lines, seven paper cup formers, five cup printers, three lid printing machines and all ancillary equipment (i.e. bus bar systems, air compressors, water chillers and air conditioning) - Maintenance of D.C. drives and A.C. Inverter drives - Modification of existing machinery to latest Safety Requirements - Installation of Cat 5E networks and telephone cabling Show less

    • United States
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Approved Electrician
      • Sep 2000 - Sep 2002

      I joined Vogal Group in the position of Approved Electrician. Since the aforementioned date I was employed for the following projects; - Installation of process equipment - Pedigree Petfoods (Melton Mowbray, England) - Construction and commissioning of automated production line - Baker Perkins Ltd – Special Projects (Peterborough, England) - General maintenance of engine production and test facility - Perkins Engines (Peterborough, England) I joined Vogal Group in the position of Approved Electrician. Since the aforementioned date I was employed for the following projects; - Installation of process equipment - Pedigree Petfoods (Melton Mowbray, England) - Construction and commissioning of automated production line - Baker Perkins Ltd – Special Projects (Peterborough, England) - General maintenance of engine production and test facility - Perkins Engines (Peterborough, England)

    • United Kingdom
    • Food and Beverage Manufacturing
    • 1 - 100 Employee
    • Maintenance Electrician
      • Jan 2000 - Sep 2000

      Between these dates I was employed as a Maintenance Electrician for the above company. My range of work included the following; - Electrical and electro-mechanical maintenance of fifteen production lines - Fault finding and testing of defective machinery - Manufacture of required control systems for in house product movement - Installation of new services equipment - Locating and installing new production lines and ancillary equipment - P.A.T. testing (Portable Appliance Test) of entire site - Liaising with parts suppliers for correct delivery of required items - Active participant in the modernisation of the entire site. Show less

    • Approved Electrician
      • Sep 1991 - Dec 1999

      From September 1991 to September 1996 I was employed as an apprentice for the above firm. After September 1996 to December 1999 I was employed as a CITB part 2 Approved Electrician and also as an NVQ Competent Electrician. During my time with the company, I was employed on the following; - Installation of major process / packaging and production equipment at the sites listed below; Pedigree Petfoods (Peterborough and Melton Mowbray sites, England) Tate and Lyle Sugars (Silvertown, London, England) Perkins Engines (Peterborough, England) Revlon Manufacturing UK (Bridgend, South Wales) Land Rover (Solihull, England) Zeneca Agrochemicals (Falkirk, Scotland) VIP Polymers (Huntingdon, England) Baker Perkins Ltd (Peterborough, England) - Contracted out to the companies listed below for maintenance cover, both shift and shut down work; Pedigree Petfoods (Peterborough & Melton Mowbray Sites, England) Perkins Engines (Peterborough, England) VIP Polymers (Huntingdon, England) Show less

Community

You need to have a working account to view this content. Click here to join now