Sidharthan Baskar

Electrical Maintenance Manager at Balcan Plastics
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Montreal, Quebec, Canada, CA
Languages
  • English Native or bilingual proficiency
  • French Professional working proficiency
  • Tamil Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Professional AutoCAD Electrical
    CADD CENTRE INDIA PVT. LTD.
    Apr, 2013
    - Nov, 2024

Experience

    • Packaging and Containers Manufacturing
    • 1 - 100 Employee
    • Electrical Maintenance Manager
      • Aug 2018 - Present

    • Electrical Engineer
      • Mar 2014 - Present

      Electrical Machine MaintenanceDesign and implementation of Electrical Panels.Setup, Analysis and troubleshooting of drivesProgramming and Analysing of Programmable Logical Controllers (Omron, Mitsubishi, Allen-Bradley, Direct Logic, Siemens)Installation, maintenance and fixing of thermo controllers and Corona Treaters.Design and analysis of DC and AC circuitsEngineering Management and Electrical Purchase managementPlant Improvement and Maintenance

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Junior Circuit Designer
      • 2010 - 2011

      • Explored alternative power generation resources by considering wind speed of 7 knots & 4.8kW of solar. • Designed a 2.23kW to 3kW boost conversion unit by integrating CUL and Single-ended Primary Inductor Converter (SEPIC) eliminating the input filter requirement with the help of PSim and AutoCAD. • Maximum power was obtained by realizing MPPT. • Implemented the hardware on a PCB by using two 9V batteries as power source. • Prepared the single line diagrams and cable scheduling. • Prepared the parts list, electrical equipment specification list and assisted in contacting the manufacturers to obtain the cost estimation. • Prepared project proposal for the implementation of alternative power source. • Supervised the construction of generation plant and reported to the chief engineer on daily basis. • Monitored production on the use of raw materials and recorded the amount of waste. • Analyzed the cause of excess waste if any and proposed corrections and implemented them. • Tested the manufactured switching devices for physical damages and performed electrical load test, shock test and power leakage test. Show less

Education

  • Concordia University
    Master of Engineering (MEng), Electrical, Electronics and Communications Engineering
    2011 - 2013
  • Anna University
    Bachelor's degree, Electrical and Electronics Engineering
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now