Shristi Tripathi

Planning Engineer at EAGLE INFRA INDIA LIMITED
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mumbai, Maharashtra, India, IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • India
    • Construction
    • 200 - 300 Employee
    • Planning Engineer
      • Mar 2023 - Present

      Contract No. DMRC/MU/LINE-6/BC/02R: Part Design & Construction of Viaduct & 5 Elevated station Viz. Mahakali caves, Seepz Village, Saki Vihar Road, Rambaug, & Powai Lake (Excluding architectural Finishing & Pre-Engineered steel roof structure of station) from Chainage 5857.40 to 9586.50 of Swami Samarth Nagar JVLR SEEPZ-Kanjurmarg Vikhroli (EEH) Metro Line corridor (Line-6) of Mumbai Metro Rail Project. Client: MMRDA Consultant: DMRC Project Cost: -392 Cr. Contract No. DMRC/MU/LINE-6/BC/02R: Part Design & Construction of Viaduct & 5 Elevated station Viz. Mahakali caves, Seepz Village, Saki Vihar Road, Rambaug, & Powai Lake (Excluding architectural Finishing & Pre-Engineered steel roof structure of station) from Chainage 5857.40 to 9586.50 of Swami Samarth Nagar JVLR SEEPZ-Kanjurmarg Vikhroli (EEH) Metro Line corridor (Line-6) of Mumbai Metro Rail Project. Client: MMRDA Consultant: DMRC Project Cost: -392 Cr.

    • Jr Planning Engineer
      • Jan 2022 - Mar 2023

      Contract: MMRDA/4/MMRP/CA-10: Part Design and Construction of elevated viaduct and 6 elevated stations viz. Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila & Sonapur [Excluding Architectural Finishing & Pre-engineered steel roof structure of Stations] from chainage 12250. 746 M to 18935.299 M of Line-4 Corridor [Wadala-Ghatkopar• Mulund-Thane-Kasarvadavali] of Mumbai Metro Rail Project of MMRDA. Project Length: 6.3 Km Project Cost: 513 Cr Contract: MMRDA/4/MMRP/CA-10: Part Design and Construction of elevated viaduct and 6 elevated stations viz. Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila & Sonapur [Excluding Architectural Finishing & Pre-engineered steel roof structure of Stations] from chainage 12250. 746 M to 18935.299 M of Line-4 Corridor [Wadala-Ghatkopar• Mulund-Thane-Kasarvadavali] of Mumbai Metro Rail Project of MMRDA. Project Length: 6.3 Km Project Cost: 513 Cr

    • India
    • Civil Engineering
    • 1 - 100 Employee
    • Trainee Engineer
      • Dec 2020 - Dec 2021

      Contract CA-48 - Design and Construction of Elevated Viaduct and Nine (9) Elevated Stations (Excluding Architectural Finishes and PEB Roof Structure) Including Two (2) Flyovers, and Underground Twin Tunnel, Cut and Cover, Ramp and One (1) Underground Station (Including Architectural Finishes and PEB Structures) For Corridor of Mumbai Metro Line 9 I.E. Extension of Line 7 From Dahisar (East) To MiraBhayandar and Andheri to CSIA of Mumbai Metro Rail Project of MMRDA. Client: MMRDA Consultant: SYSTRA-CEG-SMCIPL CONSORTIUM Project Cost:1,998 Cr. Show less

Education

  • SHREE L R TIWARI COLLEGE OF ENGINEERING, THANE
    Bachelor of Engineering - BE, Civil Engineering
    2019 - 2022
  • Thakur polytechnic
    Diploma in Civil Engineering, Civil Engineering
    2016 - 2019

Community

You need to have a working account to view this content. Click here to join now