Sheylicar Salazar

PMO - Operation Support at MGT consulting
  • Claim this Profile
Contact Information
Location
ES
Languages
  • Spanish Native or bilingual proficiency
  • Russian Professional working proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Fundamentos de la gestión del tiempo
    LinkedIn
    Dec, 2022
    - Sep, 2024

Experience

    • Business Consulting and Services
    • 1 - 100 Employee
    • PMO - Operation Support
      • Sep 2021 - Present

      Prepare and facilitate meetings and support preparation of milestones. Track programme progress and provide visualization and early warning of potential issues to allow for early mitigation, anticipation and data-driven decisions. Ensures consistency among all contractual, financial and technical requirements and coverage in the Project Management Plan. Monitoring, Analysis of platform integrations error for financial controls. Prepare and facilitate meetings and support preparation of milestones. Track programme progress and provide visualization and early warning of potential issues to allow for early mitigation, anticipation and data-driven decisions. Ensures consistency among all contractual, financial and technical requirements and coverage in the Project Management Plan. Monitoring, Analysis of platform integrations error for financial controls.

    • Poland
    • Business Consulting and Services
    • 1 - 100 Employee
    • Analista de datos
      • Nov 2020 - Jul 2022

      Monitoring, Analysis and Reporting KPI's in maintenance / installation of telecommunications Networks. Monitoring, Analysis and Reporting KPI's in maintenance / installation of telecommunications Networks.

    • Argentina
    • Business Consulting and Services
    • 700 & Above Employee
    • Project Control Service Analyst - Functional Designer
      • Dec 2018 - Nov 2019

      As Functional Designer: - Collection, analysis and monitoring of customer needs. - Drafting of functional and technical specifications. - Creation of the functional interface with the client together with the development department and the project management department. As PMO- Project Controller - Working and liaising with the Project Manager. - Managing teams for strategic decision making and liaising with around eleven team leaders to communicate required completion dates and interaction meetings of project/operational team. - Histogram of the Project including its weekly or monthly update. - Developing and implementing of plan versus actual progress charts (histograms/S curves). Analysis and reporting of deviations from plan. - Performing probability analysis of completion dates and potential alternatives. Presenting risk-based analysis of expected completion dates. KPI monitoring - Provide periodical project updates. - Preparing and updating schedule on a three weeks/months basis, prioritising activities. - Diarising meetings weekly (scheduling meetings and reviewing meetings). Participating in meetings with client on a weekly basis. Show less

    • Planning Specialist
      • Jun 2015 - Sep 2015

      • H2s/So2 Analyzer Replacement in SRU- Petromonagas. MARA Consultores y Proyectos, C.A., Lechería-Anzoátegui, Venezuela. • Comercial Center “Arrecife”, El Tigrito. MARA Consultores y Proyectos, C.A., Lechería-Anzoátegui, Venezuela. Scope of the Project: Engineering, Procurement and Construction (EPC) • Platform for Access to Storage Tanks in Refinery Puerto la Cruz. MARA Consultores y Proyectos, C.A., Lechería-Anzoátegui, Venezuela. Scope of the Project: Basic and Detailed Engineering Design. Responsabilities:  Preparing cost estimation and scheduling bar chart plan, based on the available resources (manpower, equipment and materials), production and construction sequences.  Development and implementation of plan versus actual progress charts (histograms/S curves). Report and analysis of deviations from plan.  Utilizing planning tools such as MS Excel, MS Project, Primavera P6.  Preparing and updating way-forward schedule on a three weeks and three months basic, considering the priority of activities.  Performing probabilistic analysis of completion dates and potential alternatives. Presenting risk based analysis of most likely completion and expected deviation range.  Liaising with all team leaders and/or members to communicate required completion dates and interfaced between functional team/operational team and project team.  Participating in meetings (i.e schedule review meetings, progress meetings, coordination meetings, constructive review meetings and so on). Show less

    • As QA/QC Inspector
      • Nov 2014 - Nov 2014

      Plant Shutdown for Maintenance at METOR,S.A. Fibrapetrol, C.A. Jose-Anzoátegui, Venezuela Scope of the Project: Thermal insulation Replacement and steam reformed refractory installation for transfer line Responsibilities: Inspection and approval activities of Thermal Insulation Replacement and steam reformed refractory installation for transfer line. Plant Shutdown for Maintenance at METOR,S.A. Fibrapetrol, C.A. Jose-Anzoátegui, Venezuela Scope of the Project: Thermal insulation Replacement and steam reformed refractory installation for transfer line Responsibilities: Inspection and approval activities of Thermal Insulation Replacement and steam reformed refractory installation for transfer line.

    • Planning Engineer
      • Jul 2013 - Sep 2013

      • Preparing cost estimation and scheduling bar chart plan considering all input availability (manpower, equipment and materials) availability, production and construction sequences. • Development and updating resource (manpower and equipment) histogram weekly or monthly as required • Development and implementation of plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan. • To use planning tools such as MS Excel, MS Project. • Preparing and updating three weeks and three months look-ahead schedule that reflect the priority activities • Performing probabilistic analysis of completion dates and potential alternatives. Presenting risk based analysis of most likely completion and expected deviation range • Liaising with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team. • Participating in meetings (i.e schedule review meetings, progress meetings, coordination meetings, constructive review meetings and so on ). Show less

    • Spain
    • Food and Beverage Manufacturing
    • Planning Engineer
      • Oct 2012 - Jul 2013

      • Preparing cost estimation and schedule bar chart plan considering all input (manpower, equipment and materials) availability, production and construction sequences. • Developing and updating resource (manpower and equipment) histogram weekly or monthly as required • Development and implementation of plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan. • To use planning tools such as MS Excel, MS Project. • Preparing and updating three weeks and three months look-ahead schedule that reflect the priority activities • Performing probabilistic analysis of completion dates and potential alternatives. Presenting risk based analysis of most likely completion and expected deviation range • Liaising with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team. • Participating in meetings (i.e schedule review meetings, progress meetings, coordination meetings, constructive review meetings and so on ). Show less

    • Planning Engineer
      • Apr 2012 - Jul 2012

      • Developing and updating resource (manpower and equipment) histogram weekly or monthly as required • Development and implementation of plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan. • Utilizing planning tools such as MS Excel, MS Project, Primavera P6. • Performing probabilistic analysis of completion dates and potential alternatives. Presenting risk based analysis of most likely completion and expected deviation range. • Participating in meetings (i.e schedule review meetings, progress meetings, coordination meetings, constructive review meetings and so on ). Show less

    • United States
    • Food and Beverage Services
    • IT Specialist
      • Aug 2011 - Mar 2012

      •Technical Support Level 1, 2 and 3. •Issue Solving 24/7. •Performing daily system monitoring, verifying the integrity and availability of all server resources, systems and key processes, reviewing system and application logs, and verifying completion of scheduled jobs such as backups. •To Develop and maintain installation and configuration procedures. •Management of server´s user account. •Backup remote and OnSite data •Technical Support Level 1, 2 and 3. •Issue Solving 24/7. •Performing daily system monitoring, verifying the integrity and availability of all server resources, systems and key processes, reviewing system and application logs, and verifying completion of scheduled jobs such as backups. •To Develop and maintain installation and configuration procedures. •Management of server´s user account. •Backup remote and OnSite data

    • Planning Engineer
      • Jan 2011 - Aug 2011

      •Development and implementation of plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan. •Utilizing planning tools such as MS Excel, MS Project. •Development and implementation of plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan. •Utilizing planning tools such as MS Excel, MS Project.

Education

  • Финансовый университет при правительстве Российской Федерации
    Master's degree, Auditoría
    2016 - 2018
  • Universidad de Oriente (VE)
    Engineer's degree, Systems Engineer
    2005 - 2010
  • INDESA- Universidad de Oriente
    Graduate Diploma, Planning
    2011 - 2012

Community

You need to have a working account to view this content. Click here to join now