Shervin Darvish

Additional Position - Ragsefid Six Clusters, Pipelines and PTL Project Manager at PIDMCO (Petrochemical Industries Development Management Co.)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Tehran Province, Iran, IR
Languages
  • English Professional working proficiency
  • German Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

payman omidjani

shervin has a flexible attitude to his work & colleagues. He has excellent references available upon request. He is a detail-oriented Senior Engineer.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Developing Your Emotional Intelligence
    LinkedIn
    Aug, 2022
    - Nov, 2024
  • introduction to Project Management System Based on the International PMBOK Guide
    QMS Academy
    Mar, 2018
    - Nov, 2024
  • Structure, Requirements and Documentation of Project Management Based on ISO 21500:2015
    QMS Academy
    Apr, 2015
    - Nov, 2024
  • Basics, Structures and Requirements of ISO/TS 29001: 2010
    -
    Nov, 2014
    - Nov, 2024
  • QMS Internal Audit Course For Auditing Management System ISO 19011: 2011
    -
    Nov, 2014
    - Nov, 2024
  • Quality Management in EPC Projects
    Ariana Project Management Institue
    May, 2009
    - Nov, 2024

Experience

    • Additional Position - Ragsefid Six Clusters, Pipelines and PTL Project Manager
      • Sep 2022 - Present

      Six clusters and associated pipelines and power transmission lines as providing feed gas for Ragsefid Compressor station plant to deliver to Bidboland refinery plant are critical and important.So. the defined project was started two months ago by signing the contract with a consortium of an engineering company with a construction company as leader.As project manager in Managing Contract (MC) team, supervising the contractor and in all engineering, procurement and construction fields are the main duties in this position.

    • Project Manager
      • May 2022 - Present

      New role, New challenge, New lessons learned!"Rag Sefid 1 Compressor Station and Gas Dehydration with Pipelines" is a Sub-Project of a Mega-Project for supplying associated gas from different sources to "Persian Gulf Bid Boland Gas Refinery".The project consists of gathering, dehydration, compression and transferring of the inlet gas whichis reached here from first stage of existing Rag sefid production unit which routed to the new compressor station in order to dehydration and compression by using interstate gas compressor package. The dry gas then is transferred to main feed pipeline of Persian Gulf Bid Boland Gas Refinery.My duties as project manager in the Managing Consultant team consists of monitoring and managing the activities of the EPC Contractor (EIED) in all known aspects of the project.

    • Iran
    • Oil and Gas
    • 1 - 100 Employee
    • Project Manager
      • Sep 2021 - May 2022

      The “Wet-process phosphoric acid production” is the most widely used in the world to produce different grades of phosphoric acid, high concentrate phosphate fertilizers and by‐products plants from sulfuric acid by utilizing phosphate rock/concentrate zero discharge/waste.The Phosphoric Acid plant includes reaction, filtration, concentration and tank farm for product. The circulation water for reaction & filtration, material handling, milling, power system and other utilities are also included.The sulfuric acid plants in Sarcheshmeh and Kahtoonabad smelters to absorb SO2 from off-gas are available to produce downstream products as aforesaid. The project scope is included to review the basic engineering package documents, providing detailed design documents as well as technical support on procurement and construction.The stakeholders of the project are:- Owner/ Main Client: National Iranian Copper Industries Company (NICICO) and MONENCO as his Managinig Contractor- Client / Contractor Consortium: Including NIPEC, Moshiran and Jahanpars- Basic Designer Consultant: WENGFU Engineering & Contracting Co. (WFEC)- Detail Designer Joint Venture: Pertogas Jahan and Imen Rah Farzin

    • Iran
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineering Manager
      • Aug 2020 - Sep 2021

      It is my honor to join to Jondishapour Engineering team as an agile company and professional people came together to build new history, after long time working in IRITEC along with very nice people there. I really miss them when I remember all brilliant time working together in projects ...Now in Jondishapour, as PEM (Project Engineering Manager) of ABS/Rubber project with more than 80 percent progress, and lack of presence of licensor as well as technologic companies who left the project after sanctions returned, made the normal duties harder in this position.ABS (Acrylonitrile Butadiene Styrene) is a common thermoplastic polymer with physical properties such as:- High rigidity- Good impact resistance, even at low temperatures- Good insulating properties- Good weldability- Good abrasion and strain resistance- High dimensional stability (Mechanically strong and stable over time)- High surface brightness and excellent surface aspect Has wide range application in automotive, transportation and home appliances and other industries which explain the importance of having the production technology of such material.

    • Program (Multi Project) Manager
      • Jan 2018 - Aug 2020

      As a unique project in Iran and rare industrial countries such as China, India, Great Britain, Japan and United States, the "Graphite Electrode Production Project" for establishing a factory to produce Graphite Electrodes from petroleum coke by special baking process using in steel making furnaces is a kind of challenging jobs I ever have had!Responsibilities as Multi-Projects (Program) manager including monitoring, leading and handling oversea basic designer company, as well as construction activities at the site simultaneously and pursuing procurement main equipment from local / foreign providers.

    • Project Manager
      • Apr 2013 - Mar 2018

      Project: KARANJ Gas Injection, Phase-III (Feasibility Study, Conceptual Study, Basic Design Engineering and Providing Tender Documents)1- Design development and detail design of Marun Petrochemical Plant 5th booster compressor.2- Conceptual study, finding proper Technical / Commercial solution, basic engineering design and providing EPC tender documents for third phase of KARANJ Gas Injection Plant.Project duty including to increase oil recovery from the oilfield by increasing flow and pressure of the injected gas to 1000 MMSCFD and 3500 psig respectively by establishing the required gas compression / pipelines and revamping the existing facilities.The final scheme after final decision of conceptual study committee included only new injection station CS-800 by 1000 MMSCFD @230 bar injection duty to inject lean gas to 10 well heads, associated pipelines and modifications on both manifolds. As per final proposal both CS-500 and CS-600 existing injection stations cannot handle defined flow according to defined duty for the project and should be disregarded.On December 2016 the final tender document for EPC project has been delivered to the client.On March 2018 the closing process is started by submitting final invoice and requesting for financial clearance with the client.satisfaction letter was submitted by the client to the project along with evaluation form which shows satisfying level of doing the project by IRITEC.

    • Engineering Manager
      • Apr 2011 - Apr 2013

      The company has a foreigh partner for design and providing pumps and special equipment for On-Skid Chemical Injection packages. Mission of engineering manager was defined as below:- Design and supervision on manufacturing of various types of Chemical Injection Packages in Oil & Gas Plants, especially it the field of South Pars Gas Field Development SP12 (EPC2 / EPC3) & SP14.- Design and supervision on fabricating of other Oil & Gas related packages Esp. in Oily Water Treatment systems.The duties of my position could be described as below:- Supervising on engineering activities to provide on-time required documents based on approved project document list.- Attending clarification meetings with the client to reduce divergences between client request and project needs.- Providing document list and close cooperation to prepare EPC project time schedule.- Providing TBE for project Equipment / material and review sub-vendor document to meet project requirements.- Supervision and troubleshooting the different problems during fabrication.

    • Project Engineering Manager /Deputy Engineering Manager
      • Sep 2008 - Apr 2011

      Project: Kharg Island Gas Gathering and NGL Recovery Plant (EPCC+F Project with 12 Sub-Projects by $ 1.2 B cost) Main activities are as below:Managing Engineering departments to handle engineering / EPC sub-contractors providing required documents of Front-End Engineering for own Projects.Integration whole project by means of engineering committees to find best solution with less side effects for other sub-projects.Good and face-to-face co-operation with planning and project control team to meet the stated deadlines in sub-contractors projects progress.Handling and supervision on any individual sub-project for feed documents endorsement, providing basic and detail engineering, tender documents, vendor selection and TBE.Liaison with international sub-contractors to achieve project requirements.Troubleshooting the different occurred problems at site.

    • Engineering Lead / Engineering Manager
      • Feb 2005 - Jul 2009

      BINAK Desalting / Dehydration Plant (Quality Improvement of Crude Oil)Main activities including as following:Handling and leading the engineering disciplines to provide required documents of front-end engineering.Providing project engineering activities with a mechanical emphasis to ensure the successful implementation of multiple disciplines and vendors to meet demanding schedule requirements whilst maintaining the highest quality standards for the achievement of the business’s stated aims and objectives.Co-operation with the control project team to meet the stated deadlines.Liaison with international vendors to achieve project requirements.Supervision at site engineering related activities.

    • Field Engineering Office Lead
      • Apr 2002 - Nov 2004

      Project: AMAK Associated Gas Gathering and Sweetening PlantsResponsibilities consisting of supervision and handling of field engineering team of about 20 people including engineers, technicians, draftspersons.Assessment and review of engineering documents providing solutions for discrepancies between engineering documents and construction problems at site.Live Coordination with engineering department and the construction team at the same time; negotiate with client site representatives to have their approval for design changes.Coordination with the site project control to meet the stated deadlines.Coordination between general contractors, sub-contractors and vendors at site to minimize design conflicts within construction / commissioning.Review working procedures provided by contractors / vendors to make confidence of quality of ongoing project work.Review and approve documents in accordance with total piping activities handled by contractors.

    • Mechanical and Machinery Equipment Coordinator/Designer
      • Oct 1996 - Apr 2002

      Mechanical and Machinery Design Department Deputy ManagerMechanical Engineer in Mobarake Steel PlantMechanical Engineer in Zamzam Steel Plant projectMechanical Engineer in Sarcheshme Copper refining Plant

    • Mechanical Design Engineer
      • Nov 1994 - Oct 1996

      As responsible engineer for design and fabrication of Giraffe type cranes Chassis, the following activities were considered for my position:- Design and supervision on manufacturing 15T /40T Unloading Jib crane.- Design and supervision on manufacturing 150T Unloading bucket elevator crane. As responsible engineer for design and fabrication of Giraffe type cranes Chassis, the following activities were considered for my position:- Design and supervision on manufacturing 15T /40T Unloading Jib crane.- Design and supervision on manufacturing 150T Unloading bucket elevator crane.

Education

  • IUST (Iran University of Science and Technology)
    Bachelor of Applied Science (B.A.Sc.), Mechanical Engineering - Solid Mechanics
    1988 - 1992