  • Certified training certificate in the field of project management
    PM-Tricks
    Jan, 2023
    - Nov, 2024
  • Approval of the Infrastructure Engineer for the Al-Alia scheme project
    Knowledge Economic City
    Nov, 2021
    - Nov, 2024
  • approval of an infrastructure engineer
    Euro Group for Engineering Consultancy
    Nov, 2021
    - Nov, 2024
  • Performance rates in construction projects - how to build a professional database
    Udemy
    Jun, 2020
    - Nov, 2024
  • Primavera P6 latest edition Training Course and Tutorial
    Udemy
    Jun, 2020
    - Nov, 2024
  • Estimating costs - case studies for civil works
    Udemy
    May, 2020
    - Nov, 2024
  • Structural Design
    Mansoura University
    Aug, 2018
    - Nov, 2024

Experience

    • Saudi Arabia
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Site Civil Engineer
      • Oct 2022 - Present

    • Saudi Arabia
    • Construction
    • 1 - 100 Employee
    • Site Civil Engineer
      • Nov 2021 - Oct 2022

      The project is one of the project of Knowledge Economic City (KEC) with the aim of expansion of Madinah city, that was designed by Farhat Urban Consultant and Euro Group Engineering Consultancy was the Supervision Consultant. Project Proposal - The Project total duration is 12 month and A cost of 36.6 million SAR. - The Sewage Networks (3.3KM): HDPE (315, 225 & 160 mm) and (500, 400 & 300 mm) GRP Pipe. - The Storm Networks (3.4KM): GRP (300, 400 & 500 mm) and (600,700 & 800 mm) RC Pipe. - The Water Supply Network (5.3KM): HDPE (200, 110 &63 mm) Pipe. - The Irrigation And Firefighting Network (11.7KM): HDPE (200, 160 & 63 mm) Pipe. - The Electrical And Telecom Network ) Area Approx 280,056 M 2: Medium and Low Voltage line(1500KVA & 1000KVA) Transformer with Electrical Rooms and RMU, Electrical Pole (192). - The Road Network (2.8KM): Construction of Road (includes excavation & backfilling, Sub-base and Base course), sidewalks and Parking Etc (Responsibilities) - Ensure that Work Procedures and Method Statements for all work activities are prepared and followed during work execution. - Ensure that correct work processes are implemented to ensure work completed are as per specifications. - Notify the QA/QC Engineer and Client's representative when work is to be progressed for their joint inspection. - Review Plant, Labor and Material allocations and advise Project Manager of any potential problems.

    • Egypt
    • Construction
    • 1 - 100 Employee
    • Site Civil Engineer
      • Sep 2020 - Nov 2021

      The project of sewage networks and lifting stations and force main lines for the kafr al faraiha village (07C-R) (Ibrahim Hassan And Al-Manshar) Awlad_Sqr The project owner is sharqiya Holding Company for Water & Wastewater, financed by the World Bank Sustainable Rural Sanitation Services Program (SRSSP), and under the supervision of the Talaat & Emam consultant Engineers. Project Proposal - The project serves 12 thousand people at A cost of 74.8 million pounds. - The sewage networks UPVC-DN (160-315 mm) with a length of (12km) and (2 lifting stations). - The force main (Ibrahim Hassan) HDPE-DN (225 mm) with a length of (6 km) and (AlManshar) force main UPVC-DN (200 mm) with a length of (1km). (Responsibilities) - The implementation of some of the gravity lines works, including the house connections, the crossings Underground Crossings (open cut). - The implementation of the force main the And the washing valve rooms, the air valve rooms , the main valve room and the supervision of the implementation of the crossings (Horizontal Directed Drilling (HDD) ). - The implementation of the lifting station of the village of (Ibrahim Hassan), the construction works, insulation works, and approved finishes for sewage yard and ancillary buildings. -"Some work" in the Department slipform and heavy lifting - The second digester for the great national project (Alexandria East-Wastewater treatment plant) Sludge digestion Tank D201. - 250 continuous hours of concrete to reach the final level 17.8 meters height for a tank diameter 36.4 m with 1.2 m wall thickness.

    • Egypt
    • Design Services
    • 100 - 200 Employee
    • Inspection Engineer
      • Jun 2020 - Sep 2020

      A Supervision engineer in project of sewage networks and lifting stations and force main lines for the(Dikirnis Center – Dakahlia Governorate). - Kafr Abu Nasser first decade village gathering project (Kafr Abu Nasser Village - Abu Ali Village. - Manshaat Mubarak Village – Al azazneh VillageAl – Bashmoor Village). at a cost of 274 million Egyptian pounds. -Kafr Abu Nasser the second decade (Dimshalt village - Kafr El-Baz village - Mit Al-Nahal village) at a cost of 396 million Egyptian pounds. financed by the World Bank (SRSSP) As the project serves 80 thousand people. - The project implementer is a company Samcrete Engineers & Contractors. -The project owner is Holding Company for Water & Wastewater.

  • Tiba Company For Engineering And Contracting
    • الشرقية مركز أولاد صقر مصر
    • Site Civil Engineer
      • Jun 2019 - Jun 2020

      The project of sewage networks and lifting stations and force main lines for the Sufi villages project (61) (the village of Zour Abu Al-lail) Awlad_Sqr . -The project owner is sharqiya Holding Company for Water & Wastewater, financed by the World Bank Sustainable Rural Sanitation Services Program (SRSSP), and under the supervision of the Talaat & Emam consultant Engineers. Project Proposal - The project serves 21 thousand people at A cost of 92.4 million pounds. - The sewage networks UPVC-DN (200-600 mm) with a length of (24km) and (lifting stations). - The force main HDPE-DN (450 mm) with a length of (6 km) (Responsibilities) - The implementation of some of the gravity lines works, including the house connections, the crossings underground crossings (open cut). - The implementation Installation of the force main. - Implementation of the lifting station of the village of (Zour Abu Al-lail), the insulation works, and approved finishes for sewage Station and ancillary buildings.

  • Mansour company for water & wastewater
    • الدقهلية المنصورة مصر
    • Engineering training
      • Jul 2018 - Aug 2018

      Water Purification Station in Mit Badr Khamis , Mansoura. Mit Khamis water plan expansion project, at a cost of 68 million pounds Water Purification Station in Mit Badr Khamis , Mansoura. Mit Khamis water plan expansion project, at a cost of 68 million pounds

    • Egypt
    • Construction
    • 700 & Above Employee
    • Engineering training
      • Jul 2017 - Oct 2017

      New Faculty of Literature Mansoura University New Faculty of Literature Mansoura University

  • Dar Makkah for Engineering and Contracting
    • الدقهلية المنصورة مصر
    • Engineering training
      • Jun 2016 - Oct 2016

      buildings and towers buildings and towers

Education

  • Misr Higher Institute for Engineering & Technology
    Bachelor of Engineering., Civil Engineering
    2014 - 2019

Community

You need to have a working account to view this content. Click here to join now