Shayla Wang

Junior Electrical Engineer at Primary Engineering and Construction Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saskatoon, Saskatchewan, Canada, CA
Languages
  • English Full professional proficiency
  • Chinese Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Utilities
    • 200 - 300 Employee
    • Junior Electrical Engineer
      • Aug 2015 - Present

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Graduate Research Assistant
      • Feb 2013 - Oct 2014

      • Collected transportation data and executed data analysis based on database of U.S. Department of Transportation.• Built and programmed prototypes of electric vehicles through vehicle classification.• Explored the reliability impacts of sustainable transportation and renewable energy on power systems.• Performed system reliability analysis on generation, transmission and distribution system considering generator maintenance, transmission congestion, system disturbances, load diversity, protection relay configuration and settings. Show less

    • Graduate Teaching Assistant
      • Jan 2014 - May 2014

      • Team member involved in developing assignments and solutions for ‘Introduction to Electric Power Systems’.• Provided academic help for second-year students.

    • Research Assistant
      • Jul 2011 - Apr 2012

      • Designed current differential control strategy for inverter unit and developed control schematic using AutoCAD and MATLAB. • Developed testing system, set up control module and performed safety and performance tests. On-site experiment results showed system harmonic distortion and output voltage deviations were improved by my control strategy. • Managed test data and performed data analysis for design verification. • Analyzed single-phase inverter diagram, and designed separate control modules for grid-connected and isolated solar system. Explored the protective and relay coordination system specifically for power systems with renewable energy. • Reviewed a number of technical reports and proposals for National Natural Science Foundation of China. Show less

    • China
    • Telecommunications
    • 700 & Above Employee
    • Project Assistant
      • Jun 2011 - Sep 2011

      • Team member involved in provincial design project of electric vehicles charging station. • Coordinated between different groups to manage project schedule. • Compiled technical part of project proposal and feasibility analysis report. • Implemented project cost estimation. Assisted equipment selection and procurement. Collected and organized electrical equipment quotations. • Assisted in charging station schematic design and layout drawing. • Team member involved in provincial design project of electric vehicles charging station. • Coordinated between different groups to manage project schedule. • Compiled technical part of project proposal and feasibility analysis report. • Implemented project cost estimation. Assisted equipment selection and procurement. Collected and organized electrical equipment quotations. • Assisted in charging station schematic design and layout drawing.

    • Data Analyst
      • Oct 2010 - May 2011

      • Investigated equipment selection and assisted project commissioning. • Performed subsystem design and draft drawing for a flywheel energy storage system. • Organized specifications of flywheel-motor-bearing system, motor and generator system, and control and protection system. • Maintained data logging system. Collected experiments data and executed data analysis. • Compiled documents including: cost estimation report, data analysis report and product maintenance package. • Investigated equipment selection and assisted project commissioning. • Performed subsystem design and draft drawing for a flywheel energy storage system. • Organized specifications of flywheel-motor-bearing system, motor and generator system, and control and protection system. • Maintained data logging system. Collected experiments data and executed data analysis. • Compiled documents including: cost estimation report, data analysis report and product maintenance package.

Education

  • University of Saskatchewan
    Master’s Degree, Electrical and Computer Engineering
    2012 - 2015
  • North China Electric Power University
    Master’s Degree, Electrical Power Systems. Renewable Energy.
    2009 - 2012
  • North China Electric Power University
    Bachelor's Degree, Electrical Engineering
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now