Shawn Pettibone

Director at MGC Technical Consulting
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Seattle Area

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Director
      • Jan 2019 - Present

    • Project Manager / OSP Engineer
      • Aug 2015 - Present

      Project Engineering and Design with CAD Drawings for Major Utilities. Design and Engineer pathway for Directional Drill shots, Open Trench, or Aerial New Build or Overlash. MGC has field crews that field all poles and gather all info for UG projects. All ROW work or Private property. The Field Crews and CAD Drafters work very close to us Project Managers/ OSP Engineers. I see a project from the time it comes over to the time it leaves and is submitted for permit. We also do Cost Estimates with Cad Drawings to match the cost. WSDOT Permits, SDOT Major Permits, SCL, PSE, All city ROW permits, Bellevue, PSE permits, King County, all Railroad, SNOPUD & WSDOT. We are building this company and I enjoy playing a major role with MGC and our Management team! Very Professional and very talented team that makes this machine run very smooth! Show less

    • Telecommunications
    • 700 & Above Employee
    • Outside Plant Fiber Engineer
      • Nov 2014 - Aug 2015

      Level 3 has bought out TW Telecom so we are now Level 3 employees. Currently serving the greater Seattle area, and long haul Fiber optics that run through our area. Excited about working with Level 3 to create a monster of a company with TW Telecom & Level 3 merging together. We are currently working on Metro and Longhaul Fiber. We are currently working on a couple of big projects. Building a new Fiber ring that goes through Century Link Field, out and through Safeco Field. -Planning and commissioning of new metro and long-haul DWDM nodes. -Fiber extensions -Vyvx systems -Maintaining the Fiber rings and system -RFP -Estimates for new projects -Relocation projects -Dark fiber Show less

    • United States
    • Telecommunications
    • 700 & Above Employee
    • Outside Plant Fiber Engineer
      • Jul 2014 - Nov 2014

      Outside Plant Engineer for TW Telecom/ Level 3 in Seattle WA. Also deal with the Fiber for the whole PNW. We deal strictly with Fiber Optics. Building projects and bring Fiber to Enterprise Companies and to the Workplace. We also Have long haul fiber that runs all over the world. I don't call this my job, I call it my Career!! Outside Plant Engineer for TW Telecom/ Level 3 in Seattle WA. Also deal with the Fiber for the whole PNW. We deal strictly with Fiber Optics. Building projects and bring Fiber to Enterprise Companies and to the Workplace. We also Have long haul fiber that runs all over the world. I don't call this my job, I call it my Career!!

    • United States
    • Telecommunications
    • 200 - 300 Employee
    • Outside Plant Engineer/ Project Coordinator
      • Jul 2013 - Jul 2014

      Engineer/Design new build of Comcast System. Permitting and all communication to build of new plant. Preconstruction meetings and walk outs of all new Fiber optics or Coax. Estimates and costing of all construction. Inspect all work whether it is inside new residential or commercial buildings to new plats. Also do forced relocates of Comcast system. Supervise all contractors doing work in my footprint which is Mercer Island, Seattle, Shoreline, Lake city, and University District. Engineer/Design new build of Comcast System. Permitting and all communication to build of new plant. Preconstruction meetings and walk outs of all new Fiber optics or Coax. Estimates and costing of all construction. Inspect all work whether it is inside new residential or commercial buildings to new plats. Also do forced relocates of Comcast system. Supervise all contractors doing work in my footprint which is Mercer Island, Seattle, Shoreline, Lake city, and University District.

  • Monroe High School
    • Monroe, Washington
    • Freshmen Head Basketball Coach, Varsity Assistant Coach, Girls
      • Nov 2012 - Sep 2013

      I am the C-Team head Coach for Girls Basketball at Monroe High School. I also assist the Varsity Girls as well. I am the C-Team head Coach for Girls Basketball at Monroe High School. I also assist the Varsity Girls as well.

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Outside Plant Engineer/ Project Coordinator
      • May 2012 - Jul 2013

      Permitting of all construction that will happen in Seattle, Mercer Island, & Shoreline. Preconstruction Meetings to Engineer how Comcast plant will get inside of new or existing buildings, New platt of homes, businesses, & New Residential. Reroutes of major Fiber and Coax Runs for new builds like the Seattle Tunnel Project, Bill Gates Foundation and New Amazon Buildings. Schedule and Supervise the whole process of being constructed. When projects are complete, we need to do asbuilts and invoice every ascpect of the job. Show less

    • Driller/ CDL Driver
      • Nov 2011 - May 2012

      Helped run Ditch Witch Drills to put new Conduit in the ground for Power or any type of communications. Helped run Ditch Witch Drills to put new Conduit in the ground for Power or any type of communications.

    • United States
    • Telecommunications
    • 200 - 300 Employee
    • Construction Supervisor/ Plant Engineer
      • Oct 2010 - Nov 2011

      Construction of Comcast Plant, and also Engineered jobs. Make sure deadlines are met and also responded to emergencies to down system. Construction of Comcast Plant, and also Engineered jobs. Make sure deadlines are met and also responded to emergencies to down system.

    • Inspector/ Construction Supervisor
      • Mar 2008 - Oct 2010

      Engineered and designed drill shots and Supervised the crews. Also Inspected all drill shots and did compaction testing. Asbuilts and invoicing the jobs when completed. Engineered and designed drill shots and Supervised the crews. Also Inspected all drill shots and did compaction testing. Asbuilts and invoicing the jobs when completed.

Education

  • Monroe High School
    Diploma, Fire Prevention and Safety Technology/Technician
    2000 - 2003

Community

You need to have a working account to view this content. Click here to join now