shawn hollenback

Parts Counterperson at Bill Kay Nissan
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Woodridge, Illinois, United States, US
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Automotive
    • 1 - 100 Employee
    • Parts Counterperson
      • Mar 2018 - Present

    • Warehouse Manager
      • Jun 2015 - Oct 2015

      Checked in completed Window Treatments Made deliveries to vendors and clients homes Installation of window treatments in clients homes Set up store displays at local Costco’s Window Screen Installer, Comfort Windows Checked in completed Window Treatments Made deliveries to vendors and clients homes Installation of window treatments in clients homes Set up store displays at local Costco’s Window Screen Installer, Comfort Windows

    • United States
    • Construction
    • 1 - 100 Employee
    • warehouse
      • May 2014 - Apr 2015

      Placed screen mesh from a roller into a metal frame by hand Cleaned frame after mesh installation Cleaned warehouse Loaded truck with completed frames

    • Caser Operator
      • Sep 2013 - Apr 2014

      Fork lift operator – moved cases of milk from production line to trucks Operated caser machine which boxed cartons of milk on an assembly line Operated a palletizer which wrapped cases of milk with protective filmCleaned milk and contaminates that spilled during production from the machines

    • United States
    • Consumer Services
    • 1 - 100 Employee
    • Saw Operator
      • Jul 2010 - Aug 2013

      Operated a saw on the production line as well as driving forklifts Stacked hard wood flooring Completed maintenance on production line equipment 3-4 times a weekOperated control panels for wood planer Operated a saw on the production line as well as driving forklifts Stacked hard wood flooring Completed maintenance on production line equipment 3-4 times a weekOperated control panels for wood planer

Education

  • Downers Grove North High school
    -

Community

You need to have a working account to view this content. Click here to join now