Shawn Harrison

Capital Project Manager at Seqirus
  • Claim this Profile
Online Presence
Contact Information
Location
Raleigh-Durham-Chapel Hill Area

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Lean Six Sigma Yellow Belt Certification
    Solomon EOS, LLC
    Apr, 2023
    - Sep, 2024
  • OSHA 30 Hour
    OSHA
    Apr, 2008
    - Sep, 2024

Experience

    • Pharmaceutical Manufacturing
    • 1 - 100 Employee
    • Capital Project Manager
      • Jul 2021 - Present

      • Capital Project Manager managing multiple projects. • Developed acceptance and turnover documentation. • Developed Capital Acquisition Requests (CAR) and Scope of Work (SOW) for multiple sitewide projects. • Created/Developed Business Cases for capital (CAPEX) & operations (OPEX) projects. • Developed and Managed project budgets and schedules. • Assist and direct facility expansion designs and construction. • Assist with Annual Capital Budget forecasting. • Entered Purchase Requisites for subcontractors and equipment purchases. • Developed Rough Order of Magnitude (ROM) estimates. • Developed Standard Operating Procedures and templates for the Capital Projects Group. • Assisted with sitewide CAD management and development of company standards. Show less

    • Canada
    • Pharmaceutical Manufacturing
    • 100 - 200 Employee
    • Project Manager/Engineer
      • Jun 2018 - Jul 2021

      • Project Manager, Project Engineer, Construction Management and Administration on multiple projects. • Developed Capital Acquisition Requests (CAR) and Scope of Work (SOW) for multiple sitewide projects. • Developed and Managed project budgets and schedules. • Assist and direct Owners side of facility expansion designs and construction. • Assist with Annual Capital Budget forecasting. • Entered Purchase Requisites for subcontractors and equipment purchases. • Developed Rough Order of Magnitude (ROM) estimates. • Assisted with sitewide CAD management and development of company standards. Show less

    • United States
    • Civil Engineering
    • 700 & Above Employee
    • Sr. Process Designer
      • Mar 2017 - Jun 2018

      • Project Manager, Project Engineer, Lead Field Engineer, Lead Mechanical Designer, Construction Management and Administration on multiple projects. • Located and arranged process equipment on multiple projects. • Verifying process and mechanical load calculations per engineering documentation. • 3D design and modeling of process, mechanical, & electrical systems and equipment. • Verification of mechanical equipment and piping materials per project. • Process and mechanical equipment specifications, equipment sizing & placement for new designs & retrofits, equipment list generations. • Lead Piping Designer on multiple projects. • Generation of Piping & Instrumentation Drawings, (P&ID’s). • Component & equipment selection per design requirements. • CAD coordination between consultants & disciplines responsible for new & renovation designs for multiple projects. Show less

    • BIM Specialist/Site Manager
      • Aug 2015 - Mar 2017

      Create and manage corporate BIM and CAD standards. Reviewing submittal information compared against project specifications on construction & engineering projects. Onsite Representative/Manager on new construction opportunity. Reviewing design concepts and intent by reviewing construction documentation. Provide recommendations & feedback regarding design and equipment selection. Coordinate and evaluate corporate expansion opportunities. Design, layout, & coordinate existing and new build opportunities. Review as-built documentation for accuracy and completeness. Assist with facilities commissioning and operations. Show less

    • United Kingdom
    • Construction
    • BIM Integration Manager/Project Manager
      • Nov 2013 - Mar 2015

      •BIM Integration Manager, Project Manager, Lead Field Engineer, Construction Management and Administration. • Submittal Manager responsible for creating and managing the Submittal Package Process. • Facilitated and managed the BIM Coordination Process. • Onsite technical support for the Process and Mechanical designs. • Involved with the Business Development for the Life Sciences Group. • Onsite IT support and database management. •BIM Integration Manager, Project Manager, Lead Field Engineer, Construction Management and Administration. • Submittal Manager responsible for creating and managing the Submittal Package Process. • Facilitated and managed the BIM Coordination Process. • Onsite technical support for the Process and Mechanical designs. • Involved with the Business Development for the Life Sciences Group. • Onsite IT support and database management.

    • Process/Piping Designer
      • Feb 2011 - Dec 2013

      •Project Engineer, Lead Field Engineer, Lead Mechanical Designer •Equipment list generations, contractor supervision, field verifications and approvals of design issues, resolutions, modifications. •Located and arranged process and packaging equipment. •Verifying mechanical load calculations per engineering documentation. •3D design and modeling of mechanical systems and equipment. •Verification of mechanical equipment and piping materials per project. •Pipe routing for process & utility systems, mechanical/process equipment specifications, equipment sizing & placement for new designs & retrofits, equipment list generations, scheduling & documentation control for utility systems shutdown work which included preventive maintenance & enhancements to existing systems, testing & balancing of HVAC systems, duct routing for existing & retrofits, plumbing designs of new projects & retrofits Show less

    • Field Engineer
      • Nov 2004 - Feb 2011

      •Project Manager, Project Engineer, Lead Field Engineer, Lead Mechanical Designer, Construction Management and Administration on multiple projects. •Equipment list generations, contractor supervision, field verifications and approvals of design issues, resolutions, modifications, and verification and approvals of Change Order Requests. Assisted in scheduling of contractors and periodical shutdown work performed, lab planning, equipment relocation, generation and execution of commissioning protocol documentation for a BSL/3 lab suite, and assisted in SOP documentation generation. •Located and arranged process and packaging equipment on multiple projects. •Verifying mechanical load calculations per engineering documentation. •3D design and modeling of mechanical systems and equipment. •Verification of mechanical equipment and piping materials per project. •Manager of Machine Guarding Group. •Facilitated Machine Guarding Risk Assessments for mechanical, electrical, and controls portions of existing equipment. •Reviewed and recommended machine guarding upgrades on new equipment. •Reviewed, provided recommendations, and approved vendor supplied Risk Assessments •Technical support for machine guarding tasks for new projects. •Pipe routing for process & utility systems, mechanical/process equipment specifications, equipment sizing & placement for new designs & retrofits, equipment list generations, scheduling & documentation control for utility systems shutdown work which included preventive maintenance & enhancements to existing systems, testing & balancing of HVAC systems, duct routing for existing & retrofits, plumbing designs of new projects & retrofits. Show less

    • Process/Mechanical Designer
      • 2000 - 2002

      •Lead Mechanical Designer on multiple projects. •Construction administration for multiple projects consisting of new and renovated facilities. •Responsible for pipe & ductwork routing in existing & new buildings, equipment list generations, & field verification of new & existing designs. •CAD coordination between consultants & vendors responsible for new machine designs & facilities on multiple projects. •3D modeling of piping, HVAC, electrical, controls, & machine designs using multiple software programs. •Construction & wiring of control panels & cabinets. •Generation of company standards & forms. Show less

    • Process/Mechanical Designer
      • 1995 - 2000

      •System Administrator for Plant 4d Database package which involved setting up a network for use on a SQL server. Developed standards for using the system. Instructed personnel & clients on using the system. Controlled & manipulated program for use with company standards. •Lead Mechanical Designer on multiple projects, which involved multiple responsibilities. •Project management, pipe routing for process & utility systems, equipment specifications, equipment sizing & placement for new designs & retrofits, equipment list generations, field verifications for designs, supervision of field crews, trouble shooting of construction designs, scheduling & documentation control for utility systems shutdown work which included preventive maintenance & enhancements to existing systems, testing & balancing of HVAC systems, duct routing for existing & retrofits, electrical layouts for new designs & retrofits, plumbing designs of new projects & retrofits. •Temperature mapping of process systems. Generated & executed Installation Qualification (IQ), Operational Qualification (OQ), & Performance Qualification (PQ) validation protocols. •Supervision of CAD drafters, set up of computers for personnel & trouble shooting of computer problems, set up of cad files according to projects, development of details & isometrics for construction use, supervision & updating of detail catalogs, conversion of client, architect, & vendor files, development of “as built” drawings, 3D modeling of mechanical, process, & electrical systems. Show less

Education

  • Erie Triangle Tech
    Associate in Specialized Technology, Mechanical Design
    1992 - 1994
  • General McLane High School
    1985 - 1988

Community

You need to have a working account to view this content. Click here to join now