Shawn Benedict
Vice President of Operations at Morgner Construction Management Corp.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
LinkedIn User
Highly recommend Shawn as a Director of QA/QC and Construction Management.
LinkedIn User
Highly recommend Shawn as a Director of QA/QC and Construction Management.
LinkedIn User
Highly recommend Shawn as a Director of QA/QC and Construction Management.
LinkedIn User
Highly recommend Shawn as a Director of QA/QC and Construction Management.
Experience
-
Morgner Construction Management Corp.
-
United States
-
Business Consulting and Services
-
1 - 100 Employee
-
Vice President of Operations
-
Aug 2023 - Present
-
-
Project Director
-
Aug 2022 - Present
-
-
-
Hill International, Inc.
-
United States
-
Construction
-
700 & Above Employee
-
Sr. Construction Manager
-
Jan 2016 - Aug 2022
-
-
Program Manager
-
Jan 2016 - Aug 2022
-
-
-
GLC
-
Canada
-
Farming
-
Deputy Chief Technical Officer
-
2012 - Dec 2015
The Presidio Parkway project is a replacement of Doyle Drive, a 1.6-mile segment of Route 101 in San Francisco that is the southern access to the Golden Gate Bridge, connecting Marin and San Francisco counties and providing a major regional traffic link between the peninsula and North Bay Area counties. The current structure, built in 1936, does not meet current highway standards and is seismically deficient. The project includes construction of a high viaduct, shallow cut and cover tunnels, at-grade roadways, etc. through the Presidio. Through a competitive procurement process, Caltrans selected a private consortium, the Golden Link Concessionaire, to deliver Phase II as a design, build, finance, operate, and maintain (DBFOM) availability-pay concession. The P3 Project Agreement with GLC was executed on January 3, 2011. Show less
-
-
-
AECOM
-
United States
-
Civil Engineering
-
700 & Above Employee
-
QA Manager
-
Oct 2011 - Oct 2012
Performed as the Program QA manager on Positive Train Control Development and Implementation in the Los Angeles basin area for Metrolink Commuter Rail services. Performed as the Program QA manager on Positive Train Control Development and Implementation in the Los Angeles basin area for Metrolink Commuter Rail services.
-
-
-
-
Resident Engineer
-
Jun 2009 - Oct 2011
Performed as project Resident Engineer on the construction of the BART Fremont Central Park Subway, Transition Structures, Ventilation Structures (2), Trackway, City of Fremont Park Replacement Facilities. This project was part of the expansion of BART towards San Jose. Performed as project Resident Engineer on the construction of the BART Fremont Central Park Subway, Transition Structures, Ventilation Structures (2), Trackway, City of Fremont Park Replacement Facilities. This project was part of the expansion of BART towards San Jose.
-
-
-
BEKLLC
-
United Kingdom
-
Food & Beverages
-
Construction Manager
-
May 2006 - Dec 2008
Was actively engaged on multiple hospitality projects for private clients in both Northern and Southern California. These projects included Design/Build and CM at Risk. Was actively engaged on multiple hospitality projects for private clients in both Northern and Southern California. These projects included Design/Build and CM at Risk.
-
-
-
Carter & Burgess
-
Architecture and Planning
-
1 - 100 Employee
-
Deputy Resident Engineer on C735
-
2005 - 2006
-
-
-
EarthTech
-
Australia
-
Business Intelligence Platforms
-
1 - 100 Employee
-
Construction Manager
-
2004 - 2005
-
-
-
-
Project Engineer
-
1998 - 2004
-
-