Shariq Saleem

Production And Maintenance Manager at Atlas Battery Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Production And Maintenance Manager
      • May 2016 - Present

    • Pakistan
    • Mining
    • 400 - 500 Employee
    • Assistant Manager
      • Feb 2012 - May 2016

      Assistant Manager, Job Description:  Responsible for planning, organizing and managing of resources(equipment, people, material & system) in order to efficiently, safely and cost effectively achieve performance targets as agreed with management.  Expertise in Project Management & Execution, Commissioning, Quality Assurance, Cost Reduction, Man Power Management, team-building, resource planning.  Create a team culture driven by objective, goals and KPI’s.  Prepare annual budget,.  Optimize and initiate continuous improvement of processes.  Developed implemented of SOP's and HES ).  Development of TPM culture on plant and conducted 5S,RCFA, Six Sigma methodology and Kiazen training.  Working knowledge of pumps (centrifugal, Van type), heat exchanger (Block, shell & tube type), tanks (FRP & Steel) & piping repair work, Agitator (mixer), cooling tower (induced draft), control valves, compressors (screw type), boilers (fire tube), hydraulic & pneumatic systems.  Plan for Improve Equipment Reliability (IER) & Routine Maintenance (RM).  Working on SAP data base software. ACHIEVEMENTS : 1. Successfully completed the 21000 MT erection & commissioning of COLD ROLLED COMPLEX Project. 2. Proposed change in basic design of equipment Edge Wiper automated spray system with static piping design, now producing direct cost saving (equipment cost) estimated 1.8 million and indirect (annual maintenance cost) 0.8 million per Annam. (Kaizen). 3. 100% Productivity achieved after completion of Pickling plant commissioning, with reduced set-up time. 4. • Control scrap %age from 3.5% to 0.5~0.6% (Kaizen). 5 • Proposed change in basic design of equipment Decoiler hydraulic brake by gear pump with hydraulic piping design from main hydraulic pump, now producing direct cost saving (equipment cost) estimated 2.5 million PKR and indirect (annual maintenance cost) 0.2 million PKR per Annam, indirect product and save down time Approx. 45 million per Annam (Kaizen). Show less

    • Site Engineer (Mechanical)
      • May 2011 - Feb 2012

Education

  • NED University of Engineering and Technology
    Master of Engineering (MEng), Manufacturing Engineering
    2013 - 2015
  • Mehran University of Engineering and Technology Jamshoro
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now