Sharan Venugopal

MEP Head at NEW YORK ENGINEERS- MEP Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Pune, Maharashtra, India, IN
Languages
  • English Native or bilingual proficiency
  • Malayalam Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • Tamil Limited working proficiency
  • Kannada Limited working proficiency
  • Telugu Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Electrical CAD Professional Certification
    CADD Centre
    Jun, 2010
    - Nov, 2024

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • MEP Head
      • Mar 2019 - Present

    • Denmark
    • Civil Engineering
    • 700 & Above Employee
    • Team Lead - MEP
      • Nov 2017 - Mar 2019

    • United States
    • Architecture and Planning
    • 200 - 300 Employee
    • Electrical Design Engineer
      • Dec 2012 - Nov 2017

      As an Electrical engineer, I am involved in designing and developing electrical control systems, devising systems to cater requirements of various equipments and components to required specifications, focusing on economy, safety, reliability, quality and sustainability.I work in a very wide range of sectors, including building services, manufacturing, transport networks and soon, as the organization expands, I plan to specialise in other areas of business like power generation, transmission and distribution, telecommunications as well as scientific and military research.I have involved in projects from the concept and detail of the design through to implementation, testing and handover. In some projects, I have also been involved in maintenance programmes.

    • Electrical Engineer
      • May 2010 - Sep 2012

      As an Electrical Engineer I was involved in various stages of Engineering of two Mega Power Projects1) 4 X 660 MW Bhavanapadu Thermal Power Project2) 2 X 600 MW Singhittarai Thermal Power Project.ABIR Infrastructure Pvt. Ltd. was the BOP (Balance of Plant) Contractor for both these projects.I was involved in the Basic Engineering, Design/Document review of Documents received from various consultants and also the various contracts and tendering operations of the projects. In addition to technical knowledge, I was expected to project manage and multitask. I also had to have commercial awareness to aid various flow of processes. Additional attributes, such as team leadership and management skills helped me handle the tasks assigned to me.

    • Jr. Design Engineer
      • Jun 2009 - May 2010

      I received exposure to a wide variety of Building systems in my tenure with MECA Project Engineers Pvt. Ltd. MECA Project Engineers dealt with a wide variety of building systems ranging from Hotels, Multiplexes to Industrial Buildings. I handled design and planning of MEP resources here. I also handled design of HVAC systems as an additional charge over Electrical Design. I received exposure to a wide variety of Building systems in my tenure with MECA Project Engineers Pvt. Ltd. MECA Project Engineers dealt with a wide variety of building systems ranging from Hotels, Multiplexes to Industrial Buildings. I handled design and planning of MEP resources here. I also handled design of HVAC systems as an additional charge over Electrical Design.

    • France
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Engineer (Site)
      • Aug 2008 - Apr 2009

      AREVA T&D (I) Pvt. Ltd, was the switchyard contractor for 2 X 507.5 MW Udupi Thermal Power Project which was owned by Udupi Power Corporation. As an Engineer (Site) I was incharge of manpower deployment, generation of Daily Progress Reports and tracking overall progress of the contract. I was responsible for Overall Supervision of the Earthmat Laying Process where I had to deal with a dozen other contractors who shared the same work space. I had to streamline and plan the areas to be covered each day without affecting the work of other contractors which otherwise would have affected the timely completion of the project. Later in the project, I could also see the erection of other switchyard equipments as well as the control room equipments and panels.

Education

  • NSS College of Engineering, Palakkad
    Bachelor of Technology (B.Tech.), Electrical and Electronics Engineering
    2004 - 2008
  • MSP Higher Secondary School
    HSC
    2001 - 2003
  • MSP English Medium High School
    SSLC
    1999 - 2001
  • Presentation English Medium High School
    1989 - 1999

Community

You need to have a working account to view this content. Click here to join now