Shane Delaney

Commissioning Project Manager and Lead Construction Inspector at Skyline Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Brooklyn, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Marion Jacquin

I had the pleasure to recruit Shane for a greenfield project at a biopharma client in Switzerland. Despite his young age, Shane is truly an expert in his field (Mechanical/Building Design & Construction Engineering). Working with Shane is very easy as he is a loyal, trustworthy, and easy-going person. I would highly recommend Shane and hope to keep on working with him in the future.

Ashok Dhayal BEng MTech MIEI

To the best my knowledge, Shane is a very active, sincere and kind person who is always keen to learn and update his area of interest. While working with him I have realized that he has good knowledge of Building Physics. I very much appreciate his report writing skills which demonstrates clear ideas about the subject. I wish him excellent future with his studies and employment.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Mechanical Inspector
    International Code Council
    Nov, 2022
    - Nov, 2024
  • Certified Energy Manager (CEM)
    Association of Energy Engineers
    May, 2021
    - Nov, 2024
  • Member
    Engineers Ireland
    Sep, 2018
    - Nov, 2024
  • Building Commissioning Professional (BCxP)
    ASHRAE
    Apr, 2023
    - Nov, 2024
  • Safe Pass
    SOLAS (An tSeirbhís Oideachais Leanúnaigh agus Scileanna)
    Apr, 2019
    - Nov, 2024
  • Associate
    ASHRAE

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Commissioning Project Manager and Lead Construction Inspector
      • Aug 2022 - Present

      At Skyline Engineering, I work across two departments, Commissioning/ Energy Services and Special Inspections, within the company across the 5 Burroughs of NYC. Commissioning Project Manager Engineer: - Responsible for the pre-functional and functional commissioning of equipment such as AHU's, AC Units, VRF systems, ERVs, Chillers, Boilers, Cooling Towers, Pumps, Fans, Hot Water Heaters, Heat Exchangers, Power Generators, Transformers, Automatic Transfer Switch Gear, Lighting… Show more At Skyline Engineering, I work across two departments, Commissioning/ Energy Services and Special Inspections, within the company across the 5 Burroughs of NYC. Commissioning Project Manager Engineer: - Responsible for the pre-functional and functional commissioning of equipment such as AHU's, AC Units, VRF systems, ERVs, Chillers, Boilers, Cooling Towers, Pumps, Fans, Hot Water Heaters, Heat Exchangers, Power Generators, Transformers, Automatic Transfer Switch Gear, Lighting etc. - Commissioning Project Manager for a portfolio of projects across New York for a variety of building types including Health, Mixed Use (commercial and residential) and Education facilities. - Involved in retro-commissioning of existing equipment to ensure better energy performance for the building owner. - Ensuring new equipment meets NYC Energy Code and is operating at its most energy efficient. Lead Construction Inspector: - Special Inspector for MEP and Architectural systems. - Project Managing third party inspections for buildings on behalf of the New York Department of Buildings and Port Authority of New York and New Jersey for items such as mechanical, HVAC, sprinkler, plumbing, fire-resistant rated construction, boilers, water heaters, power generators, chillers and energy code compliance. - Ensuring quality, testing, construction, materials and installation meets New York and International Building Code. Show less At Skyline Engineering, I work across two departments, Commissioning/ Energy Services and Special Inspections, within the company across the 5 Burroughs of NYC. Commissioning Project Manager Engineer: - Responsible for the pre-functional and functional commissioning of equipment such as AHU's, AC Units, VRF systems, ERVs, Chillers, Boilers, Cooling Towers, Pumps, Fans, Hot Water Heaters, Heat Exchangers, Power Generators, Transformers, Automatic Transfer Switch Gear, Lighting… Show more At Skyline Engineering, I work across two departments, Commissioning/ Energy Services and Special Inspections, within the company across the 5 Burroughs of NYC. Commissioning Project Manager Engineer: - Responsible for the pre-functional and functional commissioning of equipment such as AHU's, AC Units, VRF systems, ERVs, Chillers, Boilers, Cooling Towers, Pumps, Fans, Hot Water Heaters, Heat Exchangers, Power Generators, Transformers, Automatic Transfer Switch Gear, Lighting etc. - Commissioning Project Manager for a portfolio of projects across New York for a variety of building types including Health, Mixed Use (commercial and residential) and Education facilities. - Involved in retro-commissioning of existing equipment to ensure better energy performance for the building owner. - Ensuring new equipment meets NYC Energy Code and is operating at its most energy efficient. Lead Construction Inspector: - Special Inspector for MEP and Architectural systems. - Project Managing third party inspections for buildings on behalf of the New York Department of Buildings and Port Authority of New York and New Jersey for items such as mechanical, HVAC, sprinkler, plumbing, fire-resistant rated construction, boilers, water heaters, power generators, chillers and energy code compliance. - Ensuring quality, testing, construction, materials and installation meets New York and International Building Code. Show less

    • Switzerland
    • Pharmaceutical Manufacturing
    • 700 & Above Employee
    • CQV/Project Engineer
      • Oct 2021 - Aug 2022

      Worked as a Commissioning Qualification Validation (CQV)/Project Engineer on a new bio-manufacturing facility that produces mRNA vaccines. My responsibilities included the below; - HVAC and Cleanrooms C&Q Lead. - Mechanical Completion Walkdown subject matter expert for black and clean utilities, HVAC and Cleanrooms. Signing off systems on behalf of the client team based on quality, completeness and system readiness. - Project completions engineer for utilities, HVAC and… Show more Worked as a Commissioning Qualification Validation (CQV)/Project Engineer on a new bio-manufacturing facility that produces mRNA vaccines. My responsibilities included the below; - HVAC and Cleanrooms C&Q Lead. - Mechanical Completion Walkdown subject matter expert for black and clean utilities, HVAC and Cleanrooms. Signing off systems on behalf of the client team based on quality, completeness and system readiness. - Project completions engineer for utilities, HVAC and Cleanrooms. - Process equipment Mechanical Completion coordinator for the CQV team. - CQV System equipment owner for a number of eLNP and fLNP (mRNA) mixing skids. These mixing skids are critical for upstream and downstream process manufacturing. - Authoring and executing CQV protocols. (URS, Handover, TS, FS, IQ, EQ, OQ, uCQP and SAT/COMM protocols) Show less Worked as a Commissioning Qualification Validation (CQV)/Project Engineer on a new bio-manufacturing facility that produces mRNA vaccines. My responsibilities included the below; - HVAC and Cleanrooms C&Q Lead. - Mechanical Completion Walkdown subject matter expert for black and clean utilities, HVAC and Cleanrooms. Signing off systems on behalf of the client team based on quality, completeness and system readiness. - Project completions engineer for utilities, HVAC and… Show more Worked as a Commissioning Qualification Validation (CQV)/Project Engineer on a new bio-manufacturing facility that produces mRNA vaccines. My responsibilities included the below; - HVAC and Cleanrooms C&Q Lead. - Mechanical Completion Walkdown subject matter expert for black and clean utilities, HVAC and Cleanrooms. Signing off systems on behalf of the client team based on quality, completeness and system readiness. - Project completions engineer for utilities, HVAC and Cleanrooms. - Process equipment Mechanical Completion coordinator for the CQV team. - CQV System equipment owner for a number of eLNP and fLNP (mRNA) mixing skids. These mixing skids are critical for upstream and downstream process manufacturing. - Authoring and executing CQV protocols. (URS, Handover, TS, FS, IQ, EQ, OQ, uCQP and SAT/COMM protocols) Show less

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Turnover Quality Engineer
      • Jul 2021 - Oct 2021

      Contract at CSL Behring, Lengnau, with the Jacobs Construction Management team on site. Part of the Turnover Quality team of this greenfield biopharmaceutical project. Other responsibilities include; -System Turnover -Room Handover -Mechanical Completion -Pre-commissioning -CTOP, VTOP, Commissioning and Testing documentation compilation Contract at CSL Behring, Lengnau, with the Jacobs Construction Management team on site. Part of the Turnover Quality team of this greenfield biopharmaceutical project. Other responsibilities include; -System Turnover -Room Handover -Mechanical Completion -Pre-commissioning -CTOP, VTOP, Commissioning and Testing documentation compilation

    • Ireland
    • Architecture and Planning
    • 700 & Above Employee
    • Building Services Engineer
      • Sep 2018 - Jul 2021

      Project: NIBRT Cell Gene Therapy Expansion (March - June 2021) Roles: Lead Mechanical Building Services HVAC Design Engineer •Designed in detail all building services for this project within a tight schedule on-time and in budget. •Engineered all heating, ventilation, air-conditioning, fire protection, utilities and water needs for the new state of the art facility. •Completed the comprehensive specification and design of new equipment such as DX units, Air Handling Unit… Show more Project: NIBRT Cell Gene Therapy Expansion (March - June 2021) Roles: Lead Mechanical Building Services HVAC Design Engineer •Designed in detail all building services for this project within a tight schedule on-time and in budget. •Engineered all heating, ventilation, air-conditioning, fire protection, utilities and water needs for the new state of the art facility. •Completed the comprehensive specification and design of new equipment such as DX units, Air Handling Unit, Chiller, Water Heaters, LPHW Boiler, Pumps, Fume hoods and Energy Recovery package. •Co-ordinated all the Building Services such as ductwork and pipework with a multi-discipline team (Architecture, Structural, Civil, Electrical and Process) in 3D on Revit for this complex project. Project: MSD Biotech Dublin (April 2019 to December 2020) Roles: Mechanical Design/Building Services Engineer. Support During Construction Engineer. Commissioning Engineer. BMS Engineer. •Surveying and carrying out walk-downs on all mechanical equipment needed for the building services i.e. Chillers, Dry Coolers, AHU's, FCU's, Refrigerant Systems, Boilers, Air Compressors, BMS Equipment and Heat Exchangers. •Providing detailed design for the pharma/biotech facility i.e. HVAC and utility schematics, drawings, layouts, specifications and schedules. •Design and handover of HVAC and utility I/O lists for the building automation system (BMS). Involved in the design of Sequence of Operations (SOO) Control documentation and reviewing Functional Specification Design Software from BMS contractors. •Experience gained in FATs, GDP, GMP, URS and PCC/Change Controls for the Pharma/Biotech Industry. •Supporting turnover and CQV teams in the installation and operation of designed HVAC and utility systems (Steam, Compressed Air, Gases, LPHW, CHW, Domestic Water & Process Water). Show less Project: NIBRT Cell Gene Therapy Expansion (March - June 2021) Roles: Lead Mechanical Building Services HVAC Design Engineer •Designed in detail all building services for this project within a tight schedule on-time and in budget. •Engineered all heating, ventilation, air-conditioning, fire protection, utilities and water needs for the new state of the art facility. •Completed the comprehensive specification and design of new equipment such as DX units, Air Handling Unit… Show more Project: NIBRT Cell Gene Therapy Expansion (March - June 2021) Roles: Lead Mechanical Building Services HVAC Design Engineer •Designed in detail all building services for this project within a tight schedule on-time and in budget. •Engineered all heating, ventilation, air-conditioning, fire protection, utilities and water needs for the new state of the art facility. •Completed the comprehensive specification and design of new equipment such as DX units, Air Handling Unit, Chiller, Water Heaters, LPHW Boiler, Pumps, Fume hoods and Energy Recovery package. •Co-ordinated all the Building Services such as ductwork and pipework with a multi-discipline team (Architecture, Structural, Civil, Electrical and Process) in 3D on Revit for this complex project. Project: MSD Biotech Dublin (April 2019 to December 2020) Roles: Mechanical Design/Building Services Engineer. Support During Construction Engineer. Commissioning Engineer. BMS Engineer. •Surveying and carrying out walk-downs on all mechanical equipment needed for the building services i.e. Chillers, Dry Coolers, AHU's, FCU's, Refrigerant Systems, Boilers, Air Compressors, BMS Equipment and Heat Exchangers. •Providing detailed design for the pharma/biotech facility i.e. HVAC and utility schematics, drawings, layouts, specifications and schedules. •Design and handover of HVAC and utility I/O lists for the building automation system (BMS). Involved in the design of Sequence of Operations (SOO) Control documentation and reviewing Functional Specification Design Software from BMS contractors. •Experience gained in FATs, GDP, GMP, URS and PCC/Change Controls for the Pharma/Biotech Industry. •Supporting turnover and CQV teams in the installation and operation of designed HVAC and utility systems (Steam, Compressed Air, Gases, LPHW, CHW, Domestic Water & Process Water). Show less

    • Ireland
    • Construction
    • 1 - 100 Employee
    • Building Physics Engineer
      • Jan 2018 - Mar 2018

      Involved in building energy analysis, thermal modelling, hygrothermal evaluation, acoustics, airtightness and fire resistance. Assisted with thermal modelling in accordance to NSAI and BBA for U-Value and condensation risk calculations. Involved in building energy analysis, thermal modelling, hygrothermal evaluation, acoustics, airtightness and fire resistance. Assisted with thermal modelling in accordance to NSAI and BBA for U-Value and condensation risk calculations.

    • Ireland
    • Renewable Energy Equipment Manufacturing
    • 1 - 100 Employee
    • Energy Consultant
      • Apr 2016 - Sep 2016

      Worked for Energy Services Ltd. before it became ActionZero and got involved in two areas of the company. Energy Procurement: Reducing energy costs by managing energy use and by optimising the procurement and risk management of energy supply contracts. Services include; -Risk Management -Energy Procurement -Tariff Analysis and Optimisation -Account Management -Bill Validation -Market Analysis -Performance Benchmarking -Hedging Strategies Energy… Show more Worked for Energy Services Ltd. before it became ActionZero and got involved in two areas of the company. Energy Procurement: Reducing energy costs by managing energy use and by optimising the procurement and risk management of energy supply contracts. Services include; -Risk Management -Energy Procurement -Tariff Analysis and Optimisation -Account Management -Bill Validation -Market Analysis -Performance Benchmarking -Hedging Strategies Energy Management: Reducing an organisation’s consumption of energy while maintaining quality and productivity. Services include; -Energy Management Systems to ISO 50001 -Energy Auditing -Monitoring and Targeting -Energy Efficiency Projects -Project Management -Sustainable and Renewable Energy Technology Implementation Show less Worked for Energy Services Ltd. before it became ActionZero and got involved in two areas of the company. Energy Procurement: Reducing energy costs by managing energy use and by optimising the procurement and risk management of energy supply contracts. Services include; -Risk Management -Energy Procurement -Tariff Analysis and Optimisation -Account Management -Bill Validation -Market Analysis -Performance Benchmarking -Hedging Strategies Energy… Show more Worked for Energy Services Ltd. before it became ActionZero and got involved in two areas of the company. Energy Procurement: Reducing energy costs by managing energy use and by optimising the procurement and risk management of energy supply contracts. Services include; -Risk Management -Energy Procurement -Tariff Analysis and Optimisation -Account Management -Bill Validation -Market Analysis -Performance Benchmarking -Hedging Strategies Energy Management: Reducing an organisation’s consumption of energy while maintaining quality and productivity. Services include; -Energy Management Systems to ISO 50001 -Energy Auditing -Monitoring and Targeting -Energy Efficiency Projects -Project Management -Sustainable and Renewable Energy Technology Implementation Show less

Education

  • University College Cork
    MEngSc, IT in Architecture, Engineering & Construction
    2017 - 2018
  • University College Cork
    Honours Bachelor’s Degree, Energy Engineering
    2013 - 2017

Community

You need to have a working account to view this content. Click here to join now