Shams ul Hasan Tariq

Manager Projects at Access Group of Companies
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Manager Projects
      • Nov 2022 - Present

      Currently working as Manager Projects for Industrial Refrigeration Projects for clients like Pepsi International & Coca Cola İçecek. Responsibilities include: ● Production planning & scheduling. ● Execution of project works on production floor as well as erection & commissioning at plant. ● Productivity analysis. ● Man power handling. ● Consumable control. ● On time shipments. ● Planning & Execution of Fabrication activities and Material & Resource management of projects. ● As Project Manager, I am managing and mentoring a team of 2 engineers, 4 supervisors & 32 crew members for fabrication activities and erection, commissioning at plant site for the following projects: ● Removal of old condenser and installation of new condenser at Coca Cola Plant Karachi, Pakistan. ● Capacity enhancement and installation of new pumps for Ammonia Refrigeration System for Northern Bottling Company (Pepsi Peshawer). Show less

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Lead Production Planning Engineer
      • Jul 2022 - Sep 2022

      Worked as Lead Production Planning Engineer in Production Department. Responsibilities include: ● Production planning & scheduling. ● Execution of project works on production floor. ● Productivity analysis. ● Man power handling. ● Consumable control. ● On time shipments. ● Planning & Execution of Fabrication activities and Material & Resource management of projects ● As Lead Production Planning Engineer, I managed and mentored a team of 4 engineers, 6 supervisors & 72 crew members for fabrication activities execution for MANUFACTURING, AND SUPPLY OF 15.4 TPH (NET), 10 BAR A, 180ºC HRSG & THERMAL OIL HEATER 881 TPH (1100 M3/HR) @ 310ºC for GATRON INDUSTRIES LIMITED –KARACHI. Show less

    • Qatar
    • Construction
    • 700 & Above Employee
    • Area In Charge
      • Jan 2022 - Mar 2022

      Worked as Area In charge from client QATAR GAS for their annual turn around shut down 2022. Responsibilities included: ● To receive permit from main control building for the activity to be performed at planned area. ● To review permit requirements, JHA & other required documents and hand over to site supervisor for execution of activity (dismantling equipments, their connections for positive blinding for equipment isolation for cleaning & repair). ● Effective communication with all site team members to get the resources on required location on time to get the planned activity done on time. ● To ensure with site supervisor and area operator that ongoing activity must be executed in safe way as mentioned in JHA and as per QATAR GAS safety standards. ● At shift change get signed permit from site supervisor, review it and close it by signing and hand over to main control building for closing. ● Update daily progress of shut down activities and float to all concerned personnel. ● Attend meeting with shift supervisors to discuss about daily targets achieved and look ahead plans for upcoming activities. ● As Area In charge, I managed and mentored a team of 2 engineers, 4 supervisors & 105 crew members for plant valves service valves repair & maintenance of AKG-II unit of Qatar Gas. Show less

    • Pakistan
    • Outsourcing and Offshoring Consulting
    • 700 & Above Employee
    • Senior Fraud Analyst
      • Feb 2021 - Jan 2022

      Worked as Senior Fraud Analyst at Mindbrdge Pvt Limited (A BPO organization) Responsibilities included: ● Primarily responsible for monitoring, analyzing and investigating fraudulent transactions. ● These fraudulent transactions include the transactions made by our Revolut Customers as well as the fraudulent transactions made to our Revolut Customers by the users of other banks. ● So, I was handling both Inbound and Outbound fraudulent transactions. Worked as Senior Fraud Analyst at Mindbrdge Pvt Limited (A BPO organization) Responsibilities included: ● Primarily responsible for monitoring, analyzing and investigating fraudulent transactions. ● These fraudulent transactions include the transactions made by our Revolut Customers as well as the fraudulent transactions made to our Revolut Customers by the users of other banks. ● So, I was handling both Inbound and Outbound fraudulent transactions.

    • Qatar
    • Construction
    • 700 & Above Employee
    • Area In Charge
      • Dec 2019 - Apr 2020

      Worked as Area In charge from client ORYX GTL Limited side on supply for their annual turn around shut down 2020 & mechanical fabrication & installation of Pressure Vessels & Heat exchangers for the area Gas Circuit 1 that includes ASU (Air Separation Unit) and ATR (Auto Thermal Reformer). Responsibilities included: ● To receive permit from main control building for the activity to be performed at planned area. ● To review permit requirements, JHA & other required documents and hand over to site supervisor for execution of activity (dismantling equipments, their connections for positive blinding for equipment isolation for cleaning & repair). ● Effective communication with all site team members to get the resources on required location on time to get the planned activity done on time. ● To ensure with site supervisor and area operator that ongoing activity must be executed in safe way as mentioned in JHA and as per ORYX safety standards. ● At shift change get signed permit from site supervisor, review it and close it by signing and hand over to main control building for closing. ● Update daily progress of shut down activities and float to all concerned personnel. ● Attend meeting with shift supervisors to discuss about daily targets achieved and look ahead plans for upcoming activities. ● As Area In charge, I managed and mentored a team of 5 engineers, 10 supervisors & 130 crew members for repair & maintenance of existing heat exchangers, pressure vessels & columns of Gas Circuit I of ORYX GTL Plant . Show less

  • A. J. Corporation
    • Qasba Gujrat, Muzaffar Garh
    • Site Manager
      • May 2018 - May 2019

      Worked as SITE Manager in A.J. Corporation at Site PARCO Refinery Qasba Gujrat, Pakistan for fabrication and erection of 13 nos. Storage tanks that included 5 nos. MOGAS Storage Tanks (Ø 55.5m), 1 nos. Fire Water Tank (Ø 24m), 2 nos. Transmix Storage Tanks (Ø 21 m), 1 nos. HSD Day Tank (Ø 15m), 1 nos. MOGAS Day Tank (Ø15m), 1 nos. MOGAS Slop Tank (Ø 9.5m) & 2 nos. Fuel Oil Tanks (Ø4.5m). Responsibilities included: ● To conduct daily short meetings with all managers including Construction Manager, HSE Manager, Planning Manager, Quality Manager, Store Manager, Administration and Security Manager, Workshop Fabrication Manager before activity starting at SITE. ● To assign every manager their daily targets as discussed and agreed with client and closely monitor on daily basis. ● To visit the Site daily for checking the ongoing project activities in terms of productivity as per agreed plan and safety standards. ● As SITE Manager, I managed and mentored a team of 7 Managers, 8 Engineers, 10 Supervisors & 560 crew members for fabrication & erection activities. Show less

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Manager-Mechanical
      • Sep 2017 - Dec 2017

      Worked with Maple Leaf Cement Factory Limited as Manager Fabrication for their Project Line-III development having capacity of 7300 TPD Grey Cement for Equipments fabrication from contractors received as flame cut material from designer FLSmidth, Denmark, Major responsibilities include: ▪ To ensure equipment is fabricated as per drawings & specification provided by FLSmidth. ▪ To have close co-ordination with contractor team for daily fabrication activities and progress monitoring to ensure smooth, flawless and right on time fabrication of equipments. ▪ To highlight & address on site problems of contractor regarding working area, platform for fabrication and miscellaneous issues to be resolved in timely manner to avoid delays in fabrication. ▪ To witness inspection carried out during fabrication stages by Maple Leaf QC and FLSmidth representative. Total weight of SSX (Seller Supply as Flame cut Material) material to be fabricated is approx. 2500 Tons, which includes Cyclones, Calciner for Pre-Heater, Auxilliary Steel Structure, Bins & Hoppers of different capacities, Storage Tanks for different media like oil, water etc. Currently working contractors for fabrication of SSX material are Al- Bario Engineering (Pvt) Limted & 7 Star Engineering Kinetics (Pvt) Limited. Show less

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Manager Workshop
      • Jan 2017 - Sep 2017

      Worked with Petrocon Pvt Ltd as Workshop Manager at Korangi Industrial Area Karachi, a well know contractor for providing Fabrication, Installation & Commissioning services of Oil & Gas Industry in Pakistan mostly in Karachi. Worked with Petrocon Pvt Ltd as Workshop Manager at Korangi Industrial Area Karachi, a well know contractor for providing Fabrication, Installation & Commissioning services of Oil & Gas Industry in Pakistan mostly in Karachi.

    • Pakistan
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Manager Projects
      • Jan 2016 - Dec 2016

      Managed All Industrial Refrigeration Projects across Pakistan. Project planning & project management professional. Technical expertise includes excellent understanding of project dynamics. GEA Refrigeration industrial compressors both reciprocating & screw Project Planning, Monitoring & Commissioning. Managed All Industrial Refrigeration Projects across Pakistan. Project planning & project management professional. Technical expertise includes excellent understanding of project dynamics. GEA Refrigeration industrial compressors both reciprocating & screw Project Planning, Monitoring & Commissioning.

    • Saudi Arabia
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Project Engineer
      • Nov 2011 - Dec 2015

      Project planning, forecasting, progress monitoring and reporting, design documents interpretation Procurement planning on the basis of MTO & Nesting Drawings, fabrication planning. Project closure, lesson learned preparation I also assist proposals department for the bids being competitive by providing all the technical and commercial support to marketing. Project planning, forecasting, progress monitoring and reporting, design documents interpretation Procurement planning on the basis of MTO & Nesting Drawings, fabrication planning. Project closure, lesson learned preparation I also assist proposals department for the bids being competitive by providing all the technical and commercial support to marketing.

    • Assistant Manager
      • Apr 2011 - Sep 2011

       Responsible for implementation of the contract activities in an efficient & controlled manner.  Generate, modify, review & issue all documents required to be submitted to the client & company’s head office.  Prepare master, monthly, weekly & daily plans / execution targets (as per site requirements) and monitor site progress against such plans.  Prepare progress & analytical reports for submission to the client and company head office as per requirements in line with project planning & controlling formats.  Man power (Direct & Indirect) & Equipment Deployment.  Prepare commercial & technical proposal based on planning norms.  Follows up customer or Engineering company for delivery of drawings as per agreed schedule.  Closely co-ordinate with client/consultant for changes in plan, priorities, technical queries & how they affect contractual obligations and milestones.  To oversee the execution of a project.  Raises invoices as per agreed invoicing procedure as per contract and in accordance with a closely monitored and ensured date for submission of invoice.  Attend meeting and prepare the minutes of meeting. Show less

    • Pakistan
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Sr. Project Engineer
      • Jul 2009 - Apr 2011

       Being owner of the project, my responsibilities include project planning, forecasting, progress monitoring and reporting, design documents interpretation, procurement planning on the basis of MTO , fabrication planning, logistic (loading, dispatch, unloading etc.) planning, subcontracting, equipment erection and commissioning planning, cash flow control, scope management, team building, client handling, project closure, lesson learned preparation, stakeholder analysis and risk management. I also assist marketing and proposals department for the bids being competitive by providing all the technical and commercial support to marketing. Show less

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Project Leader
      • Apr 2005 - Jul 2009

      Being owner of the project, my responsibilities include project planning, forecasting, progress monitoring and reporting, design documents interpretation, procurement planning on the basis of MTO , fabrication planning, logistic (loading, dispatch, unloading etc.) planning, subcontracting, equipment erection and commissioning planning, cash flow control, scope management, team building, client handling, project closure, lesson learned preparation, stakeholder analysis and risk management. I also assist marketing and proposals department for the bids being competitive by providing all the technical and commercial support to marketing. MAJOR ACHIEVEMENTS Worked as Project Leader for designing and manufacturing of 01 No. of U Stamped (ASME Sec. VIII Div.1. Ed. 2007) Slug Catcher (Skid mounted vessel with piping) for BP/PDIL. Project Budget: 9.7MPkr/= Duration: 8 months Man Hours: 7265 Worked as Project Leader for designing and manufacturing of 11 Nos. U Stamped (ASME Sec. VIII Div.1. Ed 2007) Vessels (Including skid mounted vessels and piping) for PDIL/MOL. Project Budget: 82.8MPkr/= Duration: 10 months Man Hours: 50000 Worked as Project Leader for designing and manufacturing & supply of vessels & skid mounted packages & skid piping for U Stamped (ASME Sec. VIII Div.1. Ed. 2007) SRU (Sulphur Recovery Unit) for OGDCL/PDIL. Project Budget: 65.5MPkr/= Duration: 9 months Man Hours: 59000 Worked as Project Coordinator on Supply of ASME U-Stamped Inlet Separator Pressure Vessels to OGDCL for Qadir Pur Site. Worked as Project Coordinator on Supply of BS 25 Metric Tons [54,500 WL] Capacity LPG Articulated Road Tanker for Chevron Pakistan Limited. Production planning & scheduling. Execution of project works on production floor. Productivity analysis. Man power handling. Consumable control. On time shipments. Show less

    • Trainee Engineer
      • Nov 2004 - Apr 2005

      NDT of Metal samples received from Metal Industries NDT of Metal samples received from Metal Industries

    • Production Engineer
      • Feb 2003 - Oct 2004

      Monitor and Control the production of electrical wiring harness of tractors. Monitor and Control the production of electrical wiring harness of tractors.

Education

  • University of Engineering and Technology, Lahore
    B.Sc. Metallurgy & Materials Engineering, Metallurgy, Materials
    1999 - 2003
  • University of the Punjab, Lahore
    Bachelor's degree, Arts
    2001 - 2001
  • Govt. College of Science Wahdat Road Lahore
    FSc. Pre Engienering, Physics, Chemistry, Mathematics
    1995 - 1998
  • Govt. Central Model School Samanabad Lahore
    Matric (Science), Physics, Chemistry, Biology, Mathematics
    1991 - 1995
  • Govt. Junior Model School Samanabad Lahore
    Grade 5, A+
    1985 - 1990

Community

You need to have a working account to view this content. Click here to join now