Shailendra SAH
Senior Engineer - Quality at Esquire Machines Pvt. Ltd.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Limited working proficiency
-
Hindi Native or bilingual proficiency
-
Gujarati Limited working proficiency
Topline Score
Bio
Credentials
-
Basic Inspection Methods
CWB GroupMay, 2020- Nov, 2024 -
Introduction to Welding Processes
CWB GroupMay, 2020- Nov, 2024 -
W59 Workshop for Supervisors and Inspectors
CWB GroupMay, 2020- Nov, 2024 -
Welding Health and Safety
CWB GroupMay, 2020- Nov, 2024 -
Paint & Coating Inspection:- Fundamental of Corrosion & Coating
NACE InternationalOct, 2006- Nov, 2024 -
Modern Technology Concept
Government Industrial Training Institute, Guj, IndiaOct, 2000- Nov, 2024 -
Welding Inspector Course
Indian institute of weldingFeb, 2017- Nov, 2024 -
ISO 9001 : 2015 QMS Internal Auditor Certificate
SGS Institut Fresenius GmbH
Experience
-
Esquire Machines Pvt. Ltd.
-
India
-
Machinery Manufacturing
-
1 - 100 Employee
-
Senior Engineer - Quality
-
Sep 2019 - Present
Incoming, In-process Fabrication, Machining, Assembly inspection, Handling & Validation. Function testing, Hydraulic - Pneumatic test & load test of Machine as per company norm. Painting, Packing, PDI, Validate all Manuals & TPI Handling. Vendor assessment, Outsource inspection, Vendor rating for improvement. 5S, Kaizen, QRQC, NCR, CAPA & Prepare Daily, Monthly Quality reports etc. Maintain calibration record of instruments &equipment and calibrating through NABL Lab. ISO 9001 2015 QMS internal Auditor. -SAP Show less
-
-
-
Gujarat Industrial Development Corporation (GIDC)
-
India
-
Government Administration
-
1 - 100 Employee
-
QA/QC Engineer
-
Sep 2018 - Aug 2019
Incoming, In-process, Final inspection& Validation, handling TPI & Customer. Visual, Weld-Visual, DPT, RT film interpretation and Hydro testing. Shot blasting, Painting, Packing & Dispatch inspection. MIR, Dimension, NDT, Hydro, Leak testing, Painting etc documents and final Dossier preparation. Incoming, In-process, Final inspection& Validation, handling TPI & Customer. Visual, Weld-Visual, DPT, RT film interpretation and Hydro testing. Shot blasting, Painting, Packing & Dispatch inspection. MIR, Dimension, NDT, Hydro, Leak testing, Painting etc documents and final Dossier preparation.
-
-
-
Santo Engineering Co Pvt Ltd
-
India
-
Machinery Manufacturing
-
1 - 100 Employee
-
Quality Engineer - Fabrication,Machining,Panting, Packing & Dispatch
-
Oct 2016 - Aug 2018
Kickoff meeting with project team and the client of the project. NCR and RCA for improvement, handling Quality team, TPI & Customer inspection. Incoming inspection, Raw materials Mill / Painting TC review & Validation. Coordination with Lab for check testing of Raw Material, review check-test Report & Validation. Fabrication shop stage inspection, PWHT Validation & SR chart review, final inspection & Trial shop assembly inspection & getting TPI clearance. Weld Book / Weld plan preparation and approval. NDT DPT, Visual/Weld visual inspection, Machine Component inspection & Assembly inspection. Shot blasting & Painting in-process & Final Inspection. Maintain calibration record of instruments & equipments and calibrating through NABL Lab. Project documentation, Prepare report, MCR/MIR & final dossier as per client requirement. WPS PQR & WPQ as per ASME Sec. IX. Preparation and approval from third party & customer. Monitoring the welder's performance through Spot check Instrument handling: Varnier calliper , Micrometer, Bore gauge, Surface Roughness tester, Holiday tester, DFT/WFT meter, Pull-off tester, adhesion tester, Measuring tape, Height gauge, salt containment, dust test, Thredo light etc Show less
-
-
-
GE Renewable Energy
-
France
-
Renewable Energy Equipment Manufacturing
-
700 & Above Employee
-
Production Quality Control Specialist
-
Nov 2015 - Jun 2016
Nov 2015 to Jun 2016, GE Renewable Energy Maneja Vadodara Incoming inspection and validation in SAP/ P Max, through QM module. Test report review of bought out items. As well QRN, IFR, NCR & dossier etc. Handling Quality Wall, Packing & Dispatch & Painting Inspection and Quality relevant issues. Nov 2015 to Jun 2016, GE Renewable Energy Maneja Vadodara Incoming inspection and validation in SAP/ P Max, through QM module. Test report review of bought out items. As well QRN, IFR, NCR & dossier etc. Handling Quality Wall, Packing & Dispatch & Painting Inspection and Quality relevant issues.
-
-
-
Alstom Power
-
Electric Power Generation
-
700 & Above Employee
-
Quality Engineer - Fabrication,Panting, Packing & Dispatch
-
Jun 2012 - Nov 2015
Quality Wall Inspection, Key role playing to reduce NC & Customer Complain. Final inspection of All component before moving outside of factory. Packing & Dispatch inspection of export and Domestic Projects. NCR creation in NC data base and monitoring to close properly. Packing & Dispatch clearance through MTA and generating quality release note for final Dispatch. Tracking & Tracing of NCR during Final Dispatch & Clearance in SAP / Pmax (through QM / PP module) for movement of job one shop to another, as well as during final Dispatch. Handling Quality Wall inspector to achieve organization objective. Daily QRQC, for effectively treat the problems of In-house, Out-source and customer complain. Support to achieve organization target through of KPIs, process control metrics (PCMs), AQMs etc. Carrying out final Inspection, Key role playing to reduce NC & Customer complain as well as help to improvement in deferent Section Fabrication, Machining, Assembly, Painting. Developed Packing & Dispatch section from initial stage and reduce Time, Money, customers complain etc. Carry out root cause analysis of customer complaints by using 5Why, Blue Card, Yellow Card, 8D etc. Show less
-
-
Quality Executive - Fabrication & Painting
-
Sep 2005 - Jun 2012
Project coordination and Customer inspection. Fabrication, machining Dimensional, Stage & Final inspection, Generate Reports, NCR, MCRs. NDT : DPT & VT (Visual & Weld visual) inspection and validation. Shot Blasting & Painting, in-process & Final Inspection as per painting scheme “Air, Water & Oil Contact”, (Surface preparation, WFT, DFT, Adhesion test “Cross/X-Cut & Pull-off test”, Holiday test etc. Outsource inspection & Vendor development for Painting process. Process Audit of fabrication & Painting. Show less
-
-
-
Suzlon Group
-
India
-
Renewable Energy Semiconductor Manufacturing
-
700 & Above Employee
-
Quality Control Inspector
-
Mar 2005 - Sep 2005
Carried out Fabrication, Visual, Weld Visual, Painting, Assembly and Dispatch Inspection and documentation. Inspection of incoming components & Raw Material & Paint TC review and validation. Inspection after Oxy cutting of parts, after edge preparation, during and after fit-up eg. Root gap, Root face and visual aesthetics. Dimensional & visual/Weld-visual inspection during welding & after welding of job. Blasting & Painting inspection (Surface preparation, WFT, DFT & Adhesion test), Assembly & Dispatch inspection as per Company Norm. Coordination with TPI, for Stage inspection and Clearance to proceed. Show less
-
-
-
KUSTERS CALICO MACHINERY PRIVATE LIMITED
-
India
-
1 - 100 Employee
-
Technician - Assembly
-
2003 - Mar 2005
Handling Assembly of Machines, Hydraulic Power Pack, Hydraulic & Pneumatic connections. 5s, Packing & Dispatch of machines. Handling Assembly of Machines, Hydraulic Power Pack, Hydraulic & Pneumatic connections. 5s, Packing & Dispatch of machines.
-
-
-
GMW Pvt. Ltd
-
Vadodara Area, India
-
Technician - Fabrication & Assembly
-
2001 - 2003
Working in Fabrication & assembly shop, handling Fabrication & Assembly of Machines 5s, Packing & Dispatch of machines. Working in Fabrication & assembly shop, handling Fabrication & Assembly of Machines 5s, Packing & Dispatch of machines.
-
-
Education
-
The Maharaja Sayajirao University of Baroda
Engineer’s Degree, Diploma Mechanical Engineering -
Government Industrial Training Institute, padra, Guj, India
Technician, Fitter Mechanical