Shahsuvar Penahaliyev
Piping Supervisor at PROKON LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
PROKON LLC
-
Construction
-
100 - 200 Employee
-
Piping Supervisor
-
Aug 2016 - Present
Responsible Discipline Supervisor Piping & Pipe SupportMonitoring and supervising the Piping/Support fabrication activities carried out by the module fabricator- Monitor the quality and progress of the work scope and adherence to company and contractor procedures.- Assists with the hand-over of completed works- Ensuring that the Piping/Support fabrication and assembly activities are carried out to the schedule and highest HSE standards.- Ensuring necessary HSE reviews are undertaken and identified actions completed.- Providing weekly progress reports.- Provide input to Project Documents for Piping/Support fabrication / assembly, commissioning and start-up requirements.- Ensuring the issuance of appropriate documentation for installation works e.g. requests, permits, isolations, etcDuties: In charge of, organize daily labor requirements as per construction schedule work packs and test packs, ensure allrequirements in the packs are complete and Q/C accepted prior toydro test. Conduct daily toolbox Meetings,and as the perfuming authority compile work permits.• Additionally:Check the line and clear the punch. Inspect and organize work based on Method statement and ITP.• Complete lines based on priority test packages and prepare for testing.• Check the purchasing materials in accordance with the standards• Preparing the all document of Construction (MR, RFI, NCR, PAR, etc.)• Preparing and requesting project materials based on drawings.• Preparation of payments• Investigate and approve payments made by Subcontractor
-
-
-
AZFEN
-
Azerbaijan
-
Construction
-
500 - 600 Employee
-
PIPING DRAFTSMAN
-
Mar 2015 - Jul 2016
Responsibilities:• Development and production of piping isometrics, piping supports using PDMS pipe design and Auto Cad;• Developing and directing project plans with the Engineering Manager;• Reviewing, monitoring and ensuring compliance requirements are met for design and (e.g. Standards, specification and local codes and regulations etc.);• Coordinating with other engineering and design discipline team members;• Developing, implementing, and maintaining design standards, guides, and procedures;• Reviewing and approving piping design standards and specifications and utilizing sector and safety best-practices;Examined and validated piping drawings and layout plans for quality and compliance.• Reviewed and altered design documents to meet established piping standards.• Used navisworks and Smartplant software and completed all tasks, efficiently.• Interpreted and complied with piping design standards and specifications.• Built and maintained positive relationships with coworkers and engineering department personnel.• Checked and revised piping plans, drawings, and structures, in an efficient manner.• Reviewing stamped and finalized drawings (including piping plans and sections, piping isometrics, piping supports, tank and vessel layouts and details, etc.);• Ensuring engineering quality, design quality, and technical accuracy of drawings, 3D models, material quantities, specifications, procedures;• During construction, inspect works at site;• Plan the piping work in detail in accordance with the overall Project Work Schedule and monitor especially any piping related work in the critical path and provide feedback to direct Manager and Project Manager;• Participating in engineering meetings, project meetings;
-
-
-
-
Responsible to piping & Support draftsman Company Name Hydro Lotus
-
Dec 2013 - Dec 2015
Responsibilities: Check the line and clear the punch. Inspect and organize work based on Method statement and ITP.To prepare and hand over test packages• The preparation of Pipe&Pipe Support fabrication drawings as outlined within this procedure.The production of material data, in accordance with the fabrication drawings.Ensure that all drawing related documentation is as per Product Engineering procedures prior to releasing to Documentation Control.Attend engineering design reviews to establish best solution. Ensure that all drawing office documentation is correctly stored.
-
-