Shahrul Ezuan

Site Investigation Engineer at UFT STRUCTURE RE-ENGINEERING SDN BHD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Batu Pahat, Johore, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Site Investigation Engineer
      • Mar 2021 - Present

      1. KRPJ – Successfully managed tests on site such as GPR (Ground Penetration Radar), Windsor Probe Test, Coring, Rebar Scanning, Crack Width, Crack Depth and Concrete Quality with UPV. 2. JPS (Empangan Bekok) – Conduct Rebound Hammer test to check concrete strength and quality. 3. DIALOG (Kerteh) – Conduct and successfully check on Building Integrity Assessment at Oxyalkylates Plant for PCC Oxyalkylates Malaysia Sdn. Bhd. 1. KRPJ – Successfully managed tests on site such as GPR (Ground Penetration Radar), Windsor Probe Test, Coring, Rebar Scanning, Crack Width, Crack Depth and Concrete Quality with UPV. 2. JPS (Empangan Bekok) – Conduct Rebound Hammer test to check concrete strength and quality. 3. DIALOG (Kerteh) – Conduct and successfully check on Building Integrity Assessment at Oxyalkylates Plant for PCC Oxyalkylates Malaysia Sdn. Bhd.

    • Site Engineer
      • Aug 2015 - Dec 2020

      LTA - C1396 Implementation of Support Enhancement Measures for Tunnel Equipment and Fixtures in Rail Tunnels - Liaise with LTA, SMRT officers for Possession / Permit to work into tunnel. - Supervise support installation accordingly. - Update LTA, SMRT and Professional Engineer any to changes of installation. - Prepare monthly reports, MSRA, manpower hours, project timeline, daily work, claims, toolbox meeting, pre con and submission for clearance from authorities. PUB - Infrastructure Enhancement Work at Existing Doors, Outdoor Electrical Transformers and Windows at Bedok and Lower Seletar Pumping Stations. - Prepare and amend MSRA to PUB for clearance. - Inspect installation progress accordingly. - Liaise with PUB officers on time and work area. - Prepare handover inspection to PUB. JTC - Diversion of Merlimau Twin Pumping Mains Outside SRD Boundary Including The Operation and Maintenance of Merlimau Pumping Station - Arrange trial holes accordingly. - Apply NCE from authorities. - Supervise pipe installation, washout chamber, air valve chamber, inspection chamber and thrust block accordingly. - Update any changes from drawing due to site condition. PUB - Repairing of Digester Inner Concrete Wall - Prepare MSRA for work clearance. - Liaise with Main Contractor on work. - Supervise repair work accordingly. EPGC - Installation of Weather Mast Sensor - Prepare MSRA for work clearance - Liaise with authorities for permit to work. - Ensure installation following manual from manufacturer. ALCON - Rebar Reinstatement Work Inside Lift Shaft - Prepare MSRA for work clearance. - Ensure on availability and suitable materials, tools and time to execute works. - Supervise repairing work. Show less

    • Project Engineer
      • Aug 2015 - Nov 2015

      LTA project TR200 - Inspect AYE (Ayer Rajah Expressway) and BKE (Bukit Timah Expressway), locate, capture, report and describe any damages on both expressways to client (LTA). LTA project TR200 - Inspect AYE (Ayer Rajah Expressway) and BKE (Bukit Timah Expressway), locate, capture, report and describe any damages on both expressways to client (LTA).

  • EMKAY Group
    • Putra Jaya, Malaysia
    • Internship Trainee
      • 2014 - 2014

      Train as Site Engineer to supervise prestressed concrete on site, reinforcement bars installation, site testing as Mackintosh test and Coring test. Train as Site Engineer to supervise prestressed concrete on site, reinforcement bars installation, site testing as Mackintosh test and Coring test.

Education

  • University of Malaya
    Bachelor of Engineering - BE, Civil Engineering
    2011 - 2015
  • Kolej Matrikulasi Selangor
    Physical Sciences, 3.88
    2010 - 2011
  • Mara Junior Science College (MRSM)
    Pure Science, 5A 4B
    2008 - 2009

Community

You need to have a working account to view this content. Click here to join now