Shahid Rehman Choudhary

IC Piping at Descon Engineering Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 700 & Above Employee
    • IC Piping
      • Apr 2015 - Present

    • Piping Superintendent
      • Mar 2014 - Apr 2015

      Fabrication workshop incharge Fabrication workshop incharge

    • Greece
    • Construction
    • 700 & Above Employee
    • Piping Superintendent
      • Nov 2001 - Jan 2014

      Fabshop Piping superintendent Responsible for Flare & Offsite Piping erection

    • Piping Supervisor
      • Feb 2009 - Sep 2011

    • Pakistan
    • Oil and Gas
    • 200 - 300 Employee
    • Piping Superintendent
      • Sep 2008 - Feb 2009

      Responsible for fabrication and Erection

    • supervisor piping
      • Mar 2008 - Sep 2008

      Responsible for two fabrication work shop (carbon steel and stainless steel)Duties

    • United Arab Emirates
    • Oil and Gas
    • 500 - 600 Employee
    • PIPING SUPERVISOR
      • Jan 2006 - Mar 2008

      • Responsible for check all drawing at latest revision before starting fabrication• Follow and monitor the fabrication groups people in the fabrication shop• Ensuring all drawing new modification coming during the project going on with construction department • Ensuring all the result for request for inspection with quality control department during the work• Submit NCR for any problems during work to the client under company specification/stranded• Release and reported all document needed updated on the system for progress • Erection on the site (underground piping) as per the general arrangement drawing Show less

    • Piping Supervisor
      • Jun 2005 - Dec 2006

      Arrange inventory for all materials, tools, equipmentRequired for fabrication.Prepare team of fabrication prior to fabrication setup.Cutting of pipe lengths as per isometric.Prepare coupons for procedure qualification and welder qualification.Prepare setup for simulation test, perforation test for Hot-Tap 36” & 48”.Pipe fabrication in workshop.Erection of Pipe, instrument air receiver, pumps, hydrants, spools etc. prepares blinds, gaskets, end caps for hydro testing and pneumatic testing. Show less

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Piping Supervisor
      • Mar 2004 - Jun 2004

      • Prepare team of fabrication prior to fabrication setup. Cutting of pipe lengths as per isometric. • Prepares coupons for procedure qualification and welder qualification. • Arrange inventory for all materials, tools, equipment required for fabrication. Pipe fabrication in workshop. • Erection of Pipe, instrument air receiver, pumps, hydrants, spools etc. prepares blinds, gaskets, end caps for hydro testing and pneumatic testing. • Prepare team of fabrication prior to fabrication setup. Cutting of pipe lengths as per isometric. • Prepares coupons for procedure qualification and welder qualification. • Arrange inventory for all materials, tools, equipment required for fabrication. Pipe fabrication in workshop. • Erection of Pipe, instrument air receiver, pumps, hydrants, spools etc. prepares blinds, gaskets, end caps for hydro testing and pneumatic testing.

    • United Arab Emirates
    • Oil and Gas
    • 500 - 600 Employee
    • Piping Supervisor
      • Nov 2002 - Mar 2004

      • Fabrication & erection of 60 to 36” to 1/2” pipes, • verification of pipe spools, monitoring all the crew and assign the right • Person to the right job, station works, hydro testing, cement mortar lining, painting & insulation. Transportation of various construction materials as per isometric, hydro torching LP 100 & 30, RSL-2, 4, 6 pipe supports & clear all client’s punch list items. • Fabrication & erection of 60 to 36” to 1/2” pipes, • verification of pipe spools, monitoring all the crew and assign the right • Person to the right job, station works, hydro testing, cement mortar lining, painting & insulation. Transportation of various construction materials as per isometric, hydro torching LP 100 & 30, RSL-2, 4, 6 pipe supports & clear all client’s punch list items.

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Structural supervisor
      • Sep 2001 - Oct 2002

    • Piping Supervisor
      • Sep 2001 - Oct 2001

      Supervision of fabrication/Erection of Piping & PipeSupports.

    • Piping Supervisor
      • Dec 2000 - Aug 2001

    • South Korea
    • Machinery Manufacturing
    • 700 & Above Employee
    • Piping Supervisor
      • Sep 2001 - Oct 2002

      Supervision of Pipe Supports, Pipe Erections & Hydro test. Supervision of Pipe Supports, Pipe Erections & Hydro test.

    • Germany
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Piping Superintendent
      • Feb 1999 - May 2000

      Supervision of fabrication & Erection of Piping, Pipe Supports, Hydrotesting & Steam Tracing. Supervision of fabrication & Erection of Piping, Pipe Supports, Hydrotesting & Steam Tracing.

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Structural Foreman
      • Sep 1998 - Jan 1999

      Supervision of Fabrication & Erection of Steel Structure Main Rack. Supervision of Fabrication & Erection of Steel Structure Main Rack.

    • Piping Supervisor
      • Sep 1997 - Feb 1998

    • piping foreman
      • Nov 1995 - Jun 1996

    • Construction
    • 1 - 100 Employee
    • piping lead man
      • Nov 1994 - Oct 1995

    • pipe fabricator
      • Jan 1993 - Oct 1994

    • pipe fabricator
      • Nov 1991 - Dec 1992

Education

  • Matric
    Matriculation, Science
    1980 - 1982

Community

You need to have a working account to view this content. Click here to join now