Shahab Daneshvar
Undertaking River Infrastr. Inventory, Design & Construction Supervision of River Infrastr. at YEKOM- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Full professional proficiency
-
Persian Native or bilingual proficiency
-
Arabic Elementary proficiency
Topline Score
Bio
Robert K.M. Sunday
I have known Shahab during his consultancy services for development of an Integrated Water Resources Management and Development Plan for Internal Drainage Basin Water Board in Tanzania; his expertise and experience in hydrology and flood management enabled him to produce sound results. He is eager and result oriented consultant whom I am confident to recommend him for similar assignments
LinkedIn User
I have pleasure in endorsing Shahab as a serious professional who has keen interest in conducting any assignment professionally. Shahab has a range of professional expertise, including project management. His professional experience make him a great candidate for responsible managerial positions. I wish him well.
Robert K.M. Sunday
I have known Shahab during his consultancy services for development of an Integrated Water Resources Management and Development Plan for Internal Drainage Basin Water Board in Tanzania; his expertise and experience in hydrology and flood management enabled him to produce sound results. He is eager and result oriented consultant whom I am confident to recommend him for similar assignments
LinkedIn User
I have pleasure in endorsing Shahab as a serious professional who has keen interest in conducting any assignment professionally. Shahab has a range of professional expertise, including project management. His professional experience make him a great candidate for responsible managerial positions. I wish him well.
Robert K.M. Sunday
I have known Shahab during his consultancy services for development of an Integrated Water Resources Management and Development Plan for Internal Drainage Basin Water Board in Tanzania; his expertise and experience in hydrology and flood management enabled him to produce sound results. He is eager and result oriented consultant whom I am confident to recommend him for similar assignments
LinkedIn User
I have pleasure in endorsing Shahab as a serious professional who has keen interest in conducting any assignment professionally. Shahab has a range of professional expertise, including project management. His professional experience make him a great candidate for responsible managerial positions. I wish him well.
Robert K.M. Sunday
I have known Shahab during his consultancy services for development of an Integrated Water Resources Management and Development Plan for Internal Drainage Basin Water Board in Tanzania; his expertise and experience in hydrology and flood management enabled him to produce sound results. He is eager and result oriented consultant whom I am confident to recommend him for similar assignments
LinkedIn User
I have pleasure in endorsing Shahab as a serious professional who has keen interest in conducting any assignment professionally. Shahab has a range of professional expertise, including project management. His professional experience make him a great candidate for responsible managerial positions. I wish him well.
Experience
-
YEKOM
-
Iran
-
Civil Engineering
-
1 - 100 Employee
-
Undertaking River Infrastr. Inventory, Design & Construction Supervision of River Infrastr.
-
Oct 2022 - Present
Project Manager, River Training Expert
-
-
Preparation of FS & Design under North Aral Sea Development & Revitalization Project
-
Jun 2021 - Present
Senior Water Resources Expert
-
-
Integrated Flood Management Study for Kashkan Basin
-
Sep 2020 - Present
Project Manager
-
-
Consultancy Services for Preparation of an IWRMD Plan for Wami/Ruvu Basin
-
Jun 2017 - Sep 2020
Lead Hydrologist and Surface Water Resources Assessment Task LeaderHydro-Climatic (Drought and Flood) Disaster Assessment Task LeaderIntegrated Water Resources Modelling and DSS Development Team Member
-
-
Consolidation of Data, Information and Models from IWRMDPs in Tanzania
-
Jun 2017 - Jan 2020
The full title of the project is "Provision of Consultancy Services for Consolidation of Data, Information and Models from the Integrated Water Resources Management and Development Plans and Preparation of Requirements Specification for WRIS & WEB Portal", in which I'm acting as "Surface Water Resources Task Leader".Moreover to consolidation of data and information from the completed IWRMD Plans and previous water resources assessments, production of knowledge products including: 1) Water Resources Fact Sheets for the nine Basins, 2) Annotated Bibliography, and 3) Water Resources Atlas for Tanzania, is among the outputs of the study. Show less
-
-
-
Teaching and Lectures
-
Iran and Tanzania
-
Lecturer
-
2001 - Mar 2020
1) 2020, Rainfall-Runoff Modeling, Capacity Building Program for WRBWB experts, DSM, Tanzania, March 2) 2014, Water Resources Modeling, Capacity Building Program for IDBWB experts, Singida, Tanzania, August 3) 2014, Mike Hydro, Capacity Building Program for IDBWB experts, Singida, Tanzania, May 4) 2012, One Dimensional Modeling of Floods & River Flows using HEC-RAS, IDBWB experts, Singida, Tanzania, September 5) 2012, Applied Techniques for Meteorology and Hydrology and Continuous Events Rainfall-Runoff Modeling using HEC-HMS (IDB, case study in Tanzania), IDBWB experts, Singida, Tanzania, September 6) 2006-07, GIS Principals & its Application in River Engineering (ArcView HEC-geoRAS and Autodesk CAD Map), Mahab Ghodss Consulting Engineering Company/Irrigation and Drainage & Agriculture Department/ Diversion Dam and River Engineering Section 7) 2004, Computer Model Applications in Water Resources Engineering (applications of Hec-RAS and Hec-HMS), BSc Level, Irrigation Department, Uromiyeh University 8) 2003, Rainfall-Runoff Modeling & Application of Hec-HMS, Forest and Pasture Organization 9) 2002, Rainfall-Runoff Modeling and Application of Hec-HMS, Yekom Consulting Engineers 10) 2002, GIS Applications in Water Resources using ILWIS and ArcView GIS, Civil-Water Resources Engineering, MSc level, Faculty of Technology, University of Tehran (Assistant) 11) 2001, GIS Applications in Water Resources using ILWIS and ArcView GIS, International Joint Training Programme; ITC Netherlands and WJARC, and Khajeh NasirTousi University of Technology, I. R. Iran, MSc level (Course Language: English) (Assistant) 12) 2001, Hydrologic Modeling & Application of Hec-HMS model, International Joint Training Programme; ITC Netherlands and WJARC, and Khajeh NasirTousi University of Technology, I. R. Iran, MSc level (Course Language: English) (Assistant) 13) 2001, Surface Water Hydrology, Civil Engineering, BSc, Faculty of Technology, University of Tehran, (Assistant) Show less
-
-
-
Freelancer
-
Central Asia, Middle East, East Africa
-
Int'l Business Developer, Water Resources Engineering, Flood Managment
-
Oct 2014 - Jan 2020
-
-
-
YEKOM
-
Iran
-
Civil Engineering
-
1 - 100 Employee
-
Consultancy Services for Preparation of IWRMD Plan for Internal Drainage Basin (IDB) in Tanzania
-
Jul 2010 - Apr 2015
Lead Hydrologist and Surface Water Resources Assessment Task LeaderIDB is the second largst basin in Tanzania (ca. 163000 km2 in total, ca. 143000 km2 in Tanzania). It is the home of famous Ngorongoro Crater, Lake Manyara National Park, Tarangire National Park, Lake Natron National Park and so many other important and attractive features. It's one of the driest parts of Tanzania. Following studies have been carried out under my task:1) Assessment of climate of the basin, meteorology studies2) Estimate potential monthly and annual runoff by rainfall-runoff modelling and calibrating based on waterbodies water surface fluctuations and some few hydrometric data3) Assessment of Climate Change effects on surface water availability in future and propose adaptation measures4) Drought Assessment and propose adaptation measures5) Flood Hazard Assessment and propose adaptation measures6) Design and Propose Climatic and Hydrometric Monitoring Network7) Basin-wide Erosion and Sedimentation AssessmentI've also been an actively member of water resources modeling and DSS preparation and implementation team. Show less
-
-
Africa Region Operational Manager
-
Jul 2010 - Jan 2015
-
-
-
SMEC
-
Australia
-
Engineering Services
-
700 & Above Employee
-
Preparation of an IWRMD Plan for the Lake Nyasa Basin
-
Jan 2013 - Feb 2013
Lead Hydrologist and Surface Water Resources Assessment Expert Lake Nyasa Basin is located in south of Tanzania. It's a shared basin between Tanzania, Malawi and Mozambique. A total of about 27'500 km2 is inside Tanzania. The basin receives the highest amount of annual rainfall in Tanzania. Following studies was included under the task: 1) Assessment of climate of the basin, meteorology studies 2) Estimate potential monthly and annual runoff by rainfall-runoff modelling 3) Flood Management Study in 4 catchments to propose best management practices 4) Design and Propose Climatic and Hydrometric Monitoring Network Show less
-
-
-
-
Project Manager
-
Oct 2005 - Jul 2009
Projects Carried out:1) Rehabilitation of Flood Affected Reaches in NortheastRailway (Phase II), positions: Project Manager, Principal River Engineer, Meteorology & Flood Hydrology Expert2) Rehabilitation of Flood Affected Reaches in KhorasanRailway (Phase II), positions: Project Manager, Principal River Engineer, Meteorology & Flood Hydrology Expert3) Beshar River Basin Flood Control Studies (phase I), positions: Project Manager, Physiography Expert, River Engineer
-
-
River Engineering Expert & Member of the Technical Committee
-
Oct 2005 - Jul 2009
Projects engaged in:1) Abharroud & Kharroud Rivers Training (Phases I&II), positions: Technical Committee Member, River Engineering Team Member, Physiographist2) Chavorchi Abdar, Sirch and Ab Bakhsha Rivers Training, positions: Technical Committee Member, River Engineering Team Member, Meteorology & Hydrology Expert3) Khoshk River Training (Emergency Phase II), positions: Technical Committee Member, Lead River Engineering Expert4) South Pars site #3 Flood Control and Protection (phase II), positions: Lead River Engineering Expert5) Saghez River Right-of-Way Determination Studies, positions: Member of Technical Committee, River Hydraulic Expert6) Saghez River Training Studies (phase II), positions: Member of Technical Committee, River Engineering Expert7) Saghez River Training Studies (Phase I), positions: River Hydraulics and Training Team Member8) Khoshk River Training (phases I & II), positions: Lead River Engineering Expert, Flood Hydrology Expert Show less
-
-
-
-
Project Manager and Water Resources Expert
-
Mar 2005 - Oct 2005
Project engaged in: 1) Right-of-Way Determination of Gharasou River and its Floodway Tributaries in Chaldoran Plain, positions: Project Manager, Principal River Hydraulic Expert, Meteorology & Hydrology Expert 2) Balekhli River Training (phases I & II), positions: Project Manager, River Engineering Expert, Flood Hydrology Expert 3) Assessment of Flood Affected Reaches of Tehran-Sarakhs Railway, position: Hydraulic Engineer Project engaged in: 1) Right-of-Way Determination of Gharasou River and its Floodway Tributaries in Chaldoran Plain, positions: Project Manager, Principal River Hydraulic Expert, Meteorology & Hydrology Expert 2) Balekhli River Training (phases I & II), positions: Project Manager, River Engineering Expert, Flood Hydrology Expert 3) Assessment of Flood Affected Reaches of Tehran-Sarakhs Railway, position: Hydraulic Engineer
-
-
-
YEKOM
-
Iran
-
Civil Engineering
-
1 - 100 Employee
-
On-Farm Water Management Expert
-
Nov 1998 - Mar 2005
1) Lake Urmia Integrated Water Resources Management, 2003-2005, Positions: Water for Food Module Engineer in charge and Task Leader, Coordination, Supervision on Field Study teams (Project languages: English and Persian) – (Work conducted together with a team from Royal Haskoning, the Netherlands) - Two Pilot Areas on Sugarbeet in Naghadeh and Mahabad plains, one cropping season2) Irrigation Improvement Project (loan from World Bank), 1998-2001, Position: Junior Engineer in Central Consultant Unit (CCU) to Liaison Office of the project (Project Language: English), (CCU: Yekom/Iran & Arcadis-Euroconsult/Netherlands) - Three Pilot Areas in Parsabad (sugarcane and maize), Bileh Savar (Wheat and Soybean), and Behbahan (Wheat and Maize), three cropping season Show less
-
-
River Engineering, River Hydraulic and River Sediment Expert
-
May 1999 - Nov 2004
1) Aras Border River Training in Jolfa (phase II), additional positoin: Deputy Project Leader2) Aras and Balha Border Rivers Right-of-Way Studies, 3) East Azerbaijan Internal Rivers Right-of-Way Studies4) Balha Border River Training (phase I)5) Ajichai Diversion Dam (phase II)6) Aras Border River Training (phases II & III)
-
-
Project Manager
-
Sep 2003 - Oct 2004
Aji River Flood Control Studies (phase II), positions: Project Manager, River Hydraulic Expert
-
-
Education
-
University of Tehran
Master of Science (MSc), Civil Engineering-Water -
University of Tehran
Bachelor of Science (B.Sc.), Irrigation and Reclamation