Shahab Ali

Commissioning Engineer at Solar-LIT
  • Claim this Profile
Contact Information
Location
Riyadh, Saudi Arabia, SA

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Health and Safety Officer (HSO)
    Technocrats Institute Of Technology
    Feb, 2022
    - Sep, 2024

Experience

    • China
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Commissioning Engineer
      • Jan 2023 - Present

      Deployment of Robots:I'm responsible for setting up and installing ARCS in various work environments, ensuring that the robots are correctly positioned and integrated into the workflow.This involves configuring the hardware, such as robotic wheels, sensors, and control systems, and ensuring they are synchronized for efficient operation. I collaborate with different teams to plan and execute the deployment process while adhering to safety guidelines.Troubleshooting:As part of my role, I troubleshoot any issues or malfunctions that may arise during the operation of ARCS. Also tasked with diagnosing and resolving problems with both hardware and software components of the robotic systems.Program Updation:A significant aspect of my job involves updating the software programs that control the robots. I’m working on enhancing the robot's capabilities by updating their algorithms, improving their precision, or adapting them to changing tasks. Also, collaborate with concerned authorities to ensure that the programs are up-to-date with the latest technology and industry standards.Maintenance:Regular maintenance of the robotic systems is a crucial part of my job. This includes tasks like cleaning, inspecting, and replacing components that are subject to wear and tear. I'm also implementing preventive maintenance routines to avoid potential issues and extend the lifespan of the robots.Training and Documentation:I'm involved in training the Technicians how to deal with and diagnose the fault effectively and safely. Creating and maintaining detailed documentation for the deployment process, troubleshooting procedures, and program updates is essential to ensure a consistent and structured approach to your work.Permit Receiving: Part of my responsibilities include obtaining the necessary permits or permissions to deploy and operate the robots, troubleshooting, and updating the program at various points. Show less

    • Commissioning Engineer
      • Jan 2023 - Present

    • Pakistan
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Jul 2019 - Aug 2022

      Project Planning: I was responsible for planning the electrical components of domestic solar projects. This includes assessing the energy needs of clients, determining the optimal location for solar panels, and creating electrical schematics.Installation: To oversee the physical installation of solar panels and related electrical components on residential properties. This involves mounting panels on rooftops or other suitable locations and ensuring proper wiring and connections.Commissioning: Once the solar system is installed, I was the responsible for the commissioning process. This includes testing the entire system to ensure it operates efficiently and safely. I verified that all electrical connections are secure and that the system generates the expected amount of electricity.Inverter Fault Diagnosing: Diagnosing and resolving any issues related to Inverter. When faults or malfunctions occur, I was troubleshooting, identifying the problems, and implement necessary repairs or replacements.Safety Compliance:Ensuring the safety of the solar system installation is paramount.Client Communication:Part of my role involves communicating with clients to explain the installation process, answer questions, and provide maintenance instructions. I was also offering guidance on how to optimize energy production and reduce electricity costs.Maintenance and Repairs: Beyond the initial installation, I was responsible for routine maintenance and repairs as needed. This includes cleaning solar panels, inspecting the system for wear and tear, and addressing any technical issues that arise.Documentation: Keeping detailed records of each installation, commissioning, and maintenance activity is important. This documentation helps in tracking the performance of each system and facilitates future troubleshooting if problems arise. Show less

    • Electrical Supervisor
      • May 2017 - Jun 2019

      Installation Oversight: I was responsible for overseeing the installation of solar panels, wiring, and associated components. This involves coordinating with the installation team, ensuring that safety protocols are followed, and confirming that the installation is in compliance with local regulations and industry standards.Commissioning:Commissioning involves the thorough testing and validation of the entire solar system to ensure it functions optimally. I play a key role in supervising this process, making sure that all connections are secure, and the system is set up to generate electricity efficiently.Inverter Expertise: A significant part of my job is centered around inverters, which are critical components of a solar system. I was responsible for the setup and configuration of inverters to convert the DC power generated by the solar panels into usable AC power. Additionally, I diagnose and troubleshoot inverter faults to ensure their proper operation.Quality Assurance: To maintain a high standard of quality control throughout the installation and commissioning process. This involves inspecting workmanship, ensuring that all electrical connections are secure and safe, and verifying that the system is functioning as expected.Safety Compliance: I was responsible for ensuring that safety protocols are strictly adhered to, reducing the risk of accidents during installation and commissioning. This may include personal protective equipment (PPE) requirements and adherence to electrical safety codes.Daily Report: I was responsible to handover the DPR to concern EngineerProblem Solving: When issues or faults arise, I was applying my expertise in diagnosing and solving problems, particularly related to inverters. This may involve identifying electrical issues, software malfunctions, or mechanical failures and taking appropriate corrective actions. Show less

    • Lead Solar Installer
      • Jun 2014 - Apr 2017

      Project planning: I was responsible for planning and coordination of solar power installation projects. This involved assessing the site, taking measurements, and designing an efficient solar panel layout to maximize energy production. Team Management: I was leading a team of installers and technicians, assigning tasks and ensuring that the installation process went smoothly. I was providing guidance, training and support to my team members. Safety Compliance: I had to make sure my team used proper safety equipment and followed industry standards to prevent accidents. Quality Control: It was my responsibility to maintain the quality of work. This included inspecting the installation to ensure it met all specifications and standards. Any problems or defects need to be fixed immediately. Customer Interaction: As a team leader, I had direct contact with customers. I had to inform about the progress of the installation, address any concerns, and provide information about the functionality of the system. Troubleshooting: If any technical issues or challenges were encountered during the installation, I had the knowledge and skills to effectively address and resolve them. Documentation: Keeping records of the installation process, including diagrams, measurements, and equipment specifications, is essential for project documentation and future maintenance. Time Management: I had to effectively manage the project timeline to ensure that the installations were completed within the stipulated time frame. Content Management: I was overseeing the inventory of supplies and equipment needed for the installations, making sure everything was available when needed. Training and Development: I was responsible for training new technicians and ensuring that your team stays up-to-date with industry developments. Show less

Education

  • University of Technology Nowshera
    Bachelor of Science - BS, Electrical Engineering Technologies/Technicians
  • Professional Institute of Technology Mandani
    Associate's degree, Electrical Engineering
    2011 - 2014

Community

You need to have a working account to view this content. Click here to join now