shafeequl Aslam

Sr. Land Surveyor at Mechanical And Civil Engineering Contractors Company (MACE) LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Construction
    • 100 - 200 Employee
    • Sr. Land Surveyor
      • Nov 2021 - Present

      Project: Al Dhay at Bloom Gardens • Laying of gravity sewerage line 1.50m to 7.0m deep. • Laying of gravity storm water line, 2.0m to 4.0m deep. • Installation of GRP liner manhole for sewerage up to 7.0m depth • Installation of precast storm water inlet and catch basin. • Laying of pressure portable water line 180 dia , 200 dia and house connections. • Installation of Gate walve chamber and fire hydrant chamber. Project: Al Dhay at Bloom Gardens • Laying of gravity sewerage line 1.50m to 7.0m deep. • Laying of gravity storm water line, 2.0m to 4.0m deep. • Installation of GRP liner manhole for sewerage up to 7.0m depth • Installation of precast storm water inlet and catch basin. • Laying of pressure portable water line 180 dia , 200 dia and house connections. • Installation of Gate walve chamber and fire hydrant chamber.

    • United Arab Emirates
    • Construction
    • 300 - 400 Employee
    • Senior Land Surveyor
      • Dec 2019 - Oct 2021

      Project: Construction, Completion and remedy of defects of 410 villas at Mirfa • Infrastructure Works include Road Works (Avenue & Internal Roads – 25 Km’s), • Landscape Works (Hard & Soft scape on Built up Area 125,000m2), • Utility Networks (Water network- 13Km, Storm Network-15Km, Irrigation network-14 Km Sewer netwroks-15 Km, Gas networks-13Km and Electricity), Pumping stations and related Tie-in connections to existing services by NDRC. • Construction of 410 villas, 4 Mosques, 5 Retails, and 13 Parks Show less

    • United Arab Emirates
    • Construction
    • 100 - 200 Employee
    • Senior Land Surveyor
      • Apr 2018 - Nov 2019

      Project: Jabel Hafeet Development • Jabel Hafeet pond work with Gabion stone placing, 6-meter depth and5-meter width ramp work with precast curbstone and precast slab. • Out fall structure and grouted riprap work. • 1200 dia RCP storm water line, 250, 315 and 400dia HDPE pipe laying for irrigation line. • Pumping station and reservoir, Storm water manhole and irrigation chamber construction, etc. Project: Jabel Hafeet Development • Jabel Hafeet pond work with Gabion stone placing, 6-meter depth and5-meter width ramp work with precast curbstone and precast slab. • Out fall structure and grouted riprap work. • 1200 dia RCP storm water line, 250, 315 and 400dia HDPE pipe laying for irrigation line. • Pumping station and reservoir, Storm water manhole and irrigation chamber construction, etc.

  • Classic wave contracting LLC
    • Dubai, United Arab Emirates
    • Senior Land Surveyor
      • Nov 2016 - Apr 2018

      Project 1: Construction of proposed workshop and G+M office building in Dubai Industrial City Client / Consultant: Royal United Metal and Glass/ Options Engineering Consultancies. Project 2: Construction of Residential Villa G+1 in Al Khawaneej Client / Consultant: Maryam Obaid Rashid ObaidAlmheiri / Seven Lines Engineering Consultant. Project 3:Proposed G+4 Labour Accommodation Building Client / Consultant: Shaikh Mohammed Maktoum Rashid Al Maktoum / Options Engineering Consultancies. Project Includes: • Excavation, Formation, Footing and all structure works. • Internal sewerage gravity network and underground holding tank. • Internal roads and footpath works Show less

    • United Arab Emirates
    • Construction
    • 300 - 400 Employee
    • Land Surveyor
      • Apr 2013 - Aug 2016

      Project: Sea Link for transportation between Al Aryam & Al Ghezlan Islands • Road including footpath works & Bridge construction with total length of 2.2 Km, • One single span bridge 40m, one triple span bridge 120m with precast pre-stressed I-girder typically 2.3m deep, 1.05m wide at top & 0.8m wide at bottom, MSE wall. • Cross drainage works (RCP culverts 2m dia. at 4 locations & 1m dia. at 4 locations with multiple rows), Embankment filling from -3.5m ACD up to +10.5m ACD, Rock revetment for embankment slopes, • Asphalt work and Soil improvement works (by dynamic & vibro compaction). Show less

    • United Arab Emirates
    • Construction
    • 100 - 200 Employee
    • Land Surveyor
      • Feb 2011 - Mar 2013

      Project: : Rehabilitation & Replacement of Existing Sewer Line • Laying of gravity sewerage GRP of size 150 dia. to 700 dia. and Upvc pipes of size 150 dia. to 400 dia. • Installation of GRP liner & in-situ casting of manholes up to 8m deep, Shoring works using trench sheet, • NDRC/NDM works including driving and receiving pit, Dismantling old sewerage pipeline, Pipeline connection to manholes, Trial pit to record existing utility details. Project: : Rehabilitation & Replacement of Existing Sewer Line • Laying of gravity sewerage GRP of size 150 dia. to 700 dia. and Upvc pipes of size 150 dia. to 400 dia. • Installation of GRP liner & in-situ casting of manholes up to 8m deep, Shoring works using trench sheet, • NDRC/NDM works including driving and receiving pit, Dismantling old sewerage pipeline, Pipeline connection to manholes, Trial pit to record existing utility details.

    • United Arab Emirates
    • Construction
    • 100 - 200 Employee
    • Land Surveyor
      • Sep 2008 - Feb 2011

      Project : Abu Dhabi TRIP Contract No: 5001 Bridge and Tunnels At IP-44 and Sea Palace intersection on Al Salam Street. • Open cut tunnel works for underpass & flyover. • Road works including the footpath & center median. • Storm Water Drainage system that includes laying of 1000mm to 2000mmdia RC pipeline, 300mm to 1000mm dia GRP pipes, Flush inlet chambers and Catch basin chamber, • Water line that includes laying of HDPE pipe, Irrigation line that includes laying of upvc pipeline, Situ casting and precast installation of manholes and chambers for storm water, irrigation, Etisalat, etc. • Foundation works for light poles, high mast, gantry sign board, cantilever sign board, Precast and cast in-situ boundary wall works, Future ducts for Water, Irrigation, Electricity, Telephone, etc. Show less

  • Al Naboodah Civil Engineering
    • Dubai, United Arab Emirates
    • Land Surveyor
      • Oct 2004 - Oct 2007

      Project: Dubai International Airport • AX087-GSE Tunnel East of Concourse 3, AX103- Cargo Mega Terminal Building Foundation Works, AX102- Mega Terminal Infrastructure, Roads and External Works and AX124 Project Concourse-3 Structure up to Arrival level. Project: Dubai International Airport • AX087-GSE Tunnel East of Concourse 3, AX103- Cargo Mega Terminal Building Foundation Works, AX102- Mega Terminal Infrastructure, Roads and External Works and AX124 Project Concourse-3 Structure up to Arrival level.

Education

  • The institute of engineering
    Diploma in civil engineering, Surveying
    1997 - 2000

Community

You need to have a working account to view this content. Click here to join now