Seth Abel
Senior Scheduler at CM Solutions- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CM Solutions
-
France
-
Arts & Crafts
-
1 - 100 Employee
-
Senior Scheduler
-
Jul 2023 - Present
• Updating and maintaining schedules for Terminal Expansion project for AAAJV.• Developing project schedule for Terminal C Redevelopment, to help assist in early project negotiations.• Managing cost-loaded activities, updating actuals, and maintaining budgets for invoice alignment.• Authored schedule submittal narratives for stakeholder communication.• Create and maintain progress curves for visual project advancement tracking.
-
-
Senior Scheduler
-
Sep 2021 - Present
• Develop and maintain schedules for projects through all stages of execution. • Track delays, run impact analysis, and report on findings. • Develop detailed construction schedules for construction management teams and run What-If scenarios to optimize execution. • Migrated from cloud to remote database while maintaining full coding structure.• Developed new standard templates for future Pipeline work.
-
-
-
Fluor Corporation
-
United States
-
Construction
-
700 & Above Employee
-
Project Scheduler
-
Aug 2018 - Aug 2021
LAX Automated People Mover Project:• Managed and developed schedules for design, utilities, roadway civil, and vertical construction sections.• Coordinated with the construction team to establish scheduling activities.• Built and manipulated large databases in Excel and Primavera 6.• Collaborated with the management team to refine monthly schedules for specific areas of expertise.
-
-
Project Estimator
-
Mar 2018 - Aug 2018
Texas High Speed Rail:• Collaborated with the Lead Estimator to update and develop take-offs for realigned rail segments and project superstructure.• Reviewed and vetted the phased bidders list.• Assisted the engineering team in creating drainage assumptions for the estimate.
-
-
Project Control Specialist
-
Dec 2017 - Mar 2018
Puerto Rico Power Restoration Project:• Collaborated with the project team to track and report the progress of grid re-establishment after Hurricane Maria.• Reviewed and ensured the accuracy of the daily plan.• Evaluated equipment utilization and subcontractor costs.• Determined forecasts based on daily progress assessments provided by the construction organization.
-
-
-
NATARE LTD
-
United Kingdom
-
Field Technician
-
May 2017 - Nov 2017
• Construction Technician responsible for installation of stainless steel pools on a multi contractor job-site • Supported project wide safety procedures and maintained a clean and safe job-site • Considered battery limit interfaces in execution of work with multiple contractors • Installed chemical anchors to support structures • Managed inventory and verified shipment receipts • Construction Technician responsible for installation of stainless steel pools on a multi contractor job-site • Supported project wide safety procedures and maintained a clean and safe job-site • Considered battery limit interfaces in execution of work with multiple contractors • Installed chemical anchors to support structures • Managed inventory and verified shipment receipts
-
-
-
Evans Hamilton
-
Environmental Services
-
1 - 100 Employee
-
Marine Technician
-
Nov 2015 - Feb 2017
• Installed equipment to gather current and wave data for the US Army Corp of Engineers • Analyzed and provided current and wave data utilizing an array of different instrumentation • Collected sediment and water samples using multiple methods • Extensive overnight travel throughout the Southeast to support field operations & execution of the works • Installed equipment to gather current and wave data for the US Army Corp of Engineers • Analyzed and provided current and wave data utilizing an array of different instrumentation • Collected sediment and water samples using multiple methods • Extensive overnight travel throughout the Southeast to support field operations & execution of the works
-
-
-
College of Charleston
-
United States
-
Higher Education
-
700 & Above Employee
-
Teaching Assistant
-
Aug 2014 - Dec 2015
TA for 105 Lab
-
-
Research Assistant
-
Aug 2014 - Sep 2014
Utilized magnetometer and side scan sonar on the Pautuxent Rive in Maryland.Processed data using SonarWiz.Observing professor was Scott Harris
-
-
-
-
Seafloor Mapping Assistant
-
Mar 2014 - Mar 2014
Utilized Side Scan Sonar and Sub-bottom Profiler. Used HyPak. Worked under Scott Harris (Professor and researcher at College of Charleston) Utilized Side Scan Sonar and Sub-bottom Profiler. Used HyPak. Worked under Scott Harris (Professor and researcher at College of Charleston)
-
-
-
Truphonic Recording
-
Musicians
-
1 - 100 Employee
-
Intern
-
Aug 2013 - Jan 2014
I assisted on sessions with The Royal Tinfoil, Dead 27s, The Executives, The Wild Feathers, Ben Fagan, Old You, and Reckless (TV show). I assisted on sessions with The Royal Tinfoil, Dead 27s, The Executives, The Wild Feathers, Ben Fagan, Old You, and Reckless (TV show).
-
-
Education
-
College of Charleston
Bachelor’s Degree, Geological and Earth Sciences/Geosciences -
Belmont University
Music