Sergio Orozco

Senior Well Intervention Supervisor at Equión Energía Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Colombia, CO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • IWCF Well Control Certification Level 4
    International Well Control Forum
    Jun, 2019
    - Nov, 2024

Experience

    • Colombia
    • Oil and Gas
    • 100 - 200 Employee
    • Senior Well Intervention Supervisor
      • 2017 - Present

      Led multidisciplinary teams during complex well interventions in Floreña field within the timeline and budget assigned, assuring the operation´s development was done under both technical and industrial safety standards. Wells were producing volatile oil and gas injectors with depths up to 19,000 ft, completions of 4-1 / 2 " to 7", well head pressure up to 5,500 psi, bottom hole temperature up to 290F.•Led well operations with multidisciplinary teams of up to 100 people with a budget up to 3M USD.•Investigated and demonstrated the permanent Coiled Tubing elongation after each round trip and the assessed impact generated, given the uncertainty of the depth.•Conducted key operations implementing new Coiled Tubing technology with fiber optics, minimizing the uncertainty of depth and bottom hole conditions, managing data analysis and decision making in real time.•Guided the successful puncture of an inflatable plug operation by using coiled tubing equipment at depths of about 14,600 ft. Show less

    • Well Intervention Supervisor
      • 2010 - 2017

      Conducted non-rig completion and well intervention operations in Cusiana and Floreña fields, tracking timelines and budgets, recording lessons learned, managing risk analysis, and providing reports on site progress. Occasionally, tasked with preparing new well intervention programs as well. •Actively participated in operations to successfully recover a well with severe mechanical damage.•Led the execution of more than 20 plug & abandonment well operations in the Cusiana field.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Well Intervention Engineer
      • 2009 - 2010

      Responsible for conducting routine well interventions in Cusiana, Cupiagua and Floreña fields. Monitoring key performance indicators, and creating reports to capture lessons learned. •Saved the life of more than 20 people during a wireline operation.

    • PE Challenger
      • 2007 - 2009

      Trained under the BP Global Challenge program, exposed to both field petroleum engineer duties and planning duties as program originator.•Participated in a complex coiled tubing fishing operation applying a wide variety of technologies including chemical cutter.

Education

  • Universidad Nacional de Colombia
    Petroleum Engineer

Community

You need to have a working account to view this content. Click here to join now