Sergelen Jargalsaikhan (MAusIMM)

Mining Engineer at Aspire Mining Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
MN
Languages
  • English Limited working proficiency
  • Mongolian Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • MAusIMM
    AusIMM
    Jan, 2020
    - Oct, 2024
  • Mongolian Certified Mining Engineer
    Openpit engineering commission
    Oct, 2017
    - Oct, 2024
  • Advanced Safety Course 2014
    SSIA
    Nov, 2013
    - Oct, 2024
  • Gemcom Whittle-Strategic Mine planning (in Beijing 2011)
    Gemcom software international Inc.
    Nov, 2011
    - Oct, 2024
  • Gemcom Minex-Mine Planning (in UB 2011)
    Gemcom Australia Pty Ltd.
    Jan, 2011
    - Oct, 2024
  • Shotfire of Open-pit
    SSIA
    Mar, 2010
    - Oct, 2024

Experience

    • Mining
    • 1 - 100 Employee
    • Mining Engineer
      • Oct 2018 - Present

      Responsible to administration of mining technical issues. • Prepared Strategic Mine Plan, phases and pushbacks. • Working on the pit-optimization, optimization of fleet requirements. • Working on the short and long term planning. Weekly plan. Monthly, LOM Plan Designs for Mine. • Develop and submit life of mine plan, annual forecast and budget, long term pit and dump plans. • Managing mine hauling roads, economic haul route. • Using mining professional softwares: Talpac 3D, Datamine OP, Datamine NPVS, Surpac.

    • Specialist of Feasibility study
      • Apr 2017 - 2018
    • Hong Kong
    • Mining
    • 1 - 100 Employee
    • Engineering Manager
      • Mar 2017 - Apr 2017

      Responsibles:• Provide day-to-day support, leadership and encouragement for the technical services team ensuring a productive and positive work place environment.• Ensure optimal utilisation and management of the mine site’s coal.• Monitor and manage hauling route to company goals and budgets.• Supervise delivery of specific technical support.• Ensure the team aligned with overall company strategy and policies.• Work within Health and Safety Guidelines and Company standards.• Be responsible for technical planning, quality control planning and economic planning to ensure pit optimisation.• Provide scheduling and long term / short term strategic planning for the mine.• Looking for the chance to decrease mining operation cost.

    • Engineering Superintendent
      • Nov 2015 - Feb 2017

      Responsibles:• Provide day-to-day support, leadership and encouragement for the technical services team ensuring a productive and positive work place environment.• Ensure optimal utilisation and management of the mine site’s coal.• Monitor and manage hauling route to company goals and budgets.• Supervise delivery of specific technical support.• Ensure the team aligned with overall company strategy and policies.• Work within Health and Safety Guidelines and Company standards.• Be responsible for technical planning, quality control planning and economic planning to ensure pit optimisation.• Provide scheduling and long term / short term strategic planning for the mine.• Looking for the chance to decrease mining operation cost.

    • Long Range Planning Engineer
      • Aug 2015 - Nov 2015

      Responsibles:• Analyze Mine operation cost based on actual cost.• Prepare Forecast & Budget estimation and decision making• Working on the Mine planning and Yearly Designs for Mine.• Prepared Mine Operation reports to GM and Directors.• Permit Mineplan (Mineral Resources Authority Mongolia)• Preparing "Pushbacks".• Optimization of fleet requirements.• Managing mine hauling roads, economic haul route.• Using mining professional softwares: Giovia Minex 6.3, Surpac 6.2, MineSCHED 8, Whittle 4.3, Runge Talpac 9, Excel Macros 2010, AutoCAD 2013, Minesight.

    • Senior Mining Engineer
      • Jun 2015 - Aug 2015

      Responsibles: • Working on the Life of Mine plan. • Working on the Med-term mine schedule. • Ultimate pit design and Nested pits. • Preparing "Pushbacks". • Pit optimization • Using mining professional softwares: Giovia Minex 6.3, Surpac 6.6, Runge Talpac 9.4, Excel Macros 2010. Responsibles: • Working on the Life of Mine plan. • Working on the Med-term mine schedule. • Ultimate pit design and Nested pits. • Preparing "Pushbacks". • Pit optimization • Using mining professional softwares: Giovia Minex 6.3, Surpac 6.6, Runge Talpac 9.4, Excel Macros 2010.

    • Mid Range Planning Engineer
      • Nov 2014 - Jun 2015

      Responsibles:• Analyze Mine operation cost based on actual cost.• Prepare Forecast & Budget estimation and decision making• Working on the Mine planning and Yearly Designs for Mine.• Prepared Mine Operation reports to GM and Directors.• Permit Mineplan (Mineral Resources Authority Mongolia)• Preparing "Pushbacks".• Optimization of fleet requirements.• Managing mine hauling roads, economic haul route.• Using mining professional softwares: Giovia Minex 6.3, Surpac 6.2, MineSCHED 8, Whittle 4.3, Runge Talpac 9, Excel Macros 2010, AutoCAD 2013, Minesight.

    • Short Range Planning Engineer
      • Dec 2013 - Nov 2014

      Responsibles: • Determine Drill & Blast priority. • Analyze production of Liebherr 996 (backhoe 34 bcm) and Bucyrus MT4400 (240t). • Analyze production of Liebherr 9250 (backhoe 15 bcm) and Terex TR100 (100t). • Focusing Coal target and Movement materials. • Daily and Weekly mine plan. • Required Dump truck number using Runge Talpac. • Managing mine hauling roads. • Planned daily and monthly dewatering procedure. • Using mining professional softwares: Giovia Minex 6.2, Runge Talpac 9

    • Mine Planning Engineer
      • Oct 2013 - Jan 2014

      Manage the administration of mining technical services team. • Prepared Strategic Mine Plan, phases and pushbacks. • Working on the pit-optimization, optimization of fleet requirements. • Working on the short and long term planning. Weekly plan. Monthly, LOM Plan Designs for Mine. • Develop and submit life of mine plan, annual forecast and budget, long term pit and dump plans. • Managing mine hauling roads, economic haul route. • Planned daily and monthly dewatering procedure. • Management of Survey team. • Training and passing on knowledge to the Junior workforce. • Geology grid model updates each week. • Using mining professional softwares: Giovia Minex 6.2, Surpac 6.2, MineSCHED 8, Whittle 4.3, Runge Talpac 9, Excel Macros 2010, AutoCAD 2013.

    • Mining engineer
      • Mar 2013 - Oct 2013

      Responsibles: • Long & Med term Mine Plan • Analyze production of CAT 777 (100t) • Strategic mine planning (sequences and phases) • Pit optimization, open-pit & Underground mine design • Fleet calculations • Equipment selection • Haul-and-Load optimization • Waste dump scheduling sequences and optimization Haul planning and distances • Water pump management • Writing technical reports • Mining softwares: Minex, Whittle, Surpac, Minesched, Talpac Responsibles: • Long & Med term Mine Plan • Analyze production of CAT 777 (100t) • Strategic mine planning (sequences and phases) • Pit optimization, open-pit & Underground mine design • Fleet calculations • Equipment selection • Haul-and-Load optimization • Waste dump scheduling sequences and optimization Haul planning and distances • Water pump management • Writing technical reports • Mining softwares: Minex, Whittle, Surpac, Minesched, Talpac

    • Long Term Planning Engineer
      • Jan 2010 - Jan 2013

      Responsibles: • Long term Mine Plan • Strategic mine planning (sequences and phases) • Pit optimization, open-pit & Underground mine design • Fleet calculations • Equipment selection • Haul-and-Load optimization • Waste dump scheduling sequences and optimization Haul planning and distances • Water pump management • Writing technical reports • Mining softwares: Minex, Whittle, Surpac, Minesched, Talpac. Responsibles: • Long term Mine Plan • Strategic mine planning (sequences and phases) • Pit optimization, open-pit & Underground mine design • Fleet calculations • Equipment selection • Haul-and-Load optimization • Waste dump scheduling sequences and optimization Haul planning and distances • Water pump management • Writing technical reports • Mining softwares: Minex, Whittle, Surpac, Minesched, Talpac.

    • Mining Engineer & Foreman
      • 2008 - 2009

      Responsibles and managing Technical service team in open-pit & Underground mine Drill and Blast services. Responsibles and managing Technical service team in open-pit & Underground mine Drill and Blast services.

Education

  • Mongolian University of Science and Technology
    Research Doctorate, Minig engineer, Dissertation: Operating conditions of open-pit mine, pushback’s and strategic planning
    2013 -
  • Mongolian University of Science and Technology
    Master's degree, Mining engineer, Dissertation: Ovoot coking coal deposit cut-off level study, pit optimization.
    2010 - 2013
  • Mongolian University of Science and Technology
    Bachelor's degree, Mining engineer, Dissertation: Optimisation of load-and-haul equipment complex of the Erdenet mine
    2005 - 2009

Community

You need to have a working account to view this content. Click here to join now