SERDAR ÖZGÖZ

Production Engineer at İnanır Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Istanbul, Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Personal Care Product Manufacturing
    • 1 - 100 Employee
    • Production Engineer
      • Oct 2020 - Present

      LifeCube Cryo Cabinet Production Engineer Cryo Cabinet is a cabinet that can cool itself down to -80 °C / -95 °C. Athletes and beauty centers prefer this machine because it has many health benefits. Customers enter the machine and get a session.-Product research, warehouse material counting, preparation of missing material list, technical purchasing and preparation of price offers,-Conducting production process studies,-Innovative designs, technical drawings,-First audits and getting delivers from suppliers if it is necessary,- Performing computer-controlled PLC tests of the machine, general electrical controls, charging-discharging of refrigerant gases and first run tests of the machine,- Copper welding and water-lines set up of production stages - Ensuring employees about the device with hands-on training,- Investigations of the pre-set up, -Preparing the projects and presenting to the customers,- Providing technical training to customers,-Technical troubleshooting, service engineering and supporting by speaking Turkish or English with customers.Achievements Within Last 1 YearGermany – Werneck : Got trained of the LifeCube Set-up and testing stagesGalatasaray Football Club : Technical troubleshooting and providing trainingBaşakşehir Football Club : Set-up of LifeCube Cryo Trabzonspor Football Club : Set-up of LifeCube CryoItaly - The Longevity Suite : Technical troubleshooting and providing trainingItaly - Napoli Sport and Gym Care : Technical troubleshooting and providing trainingİzmir Altınordu Football Club : Set-up of LifeCube CryoGreece Drama : Set-up of LifeCube Cryo

    • Chief Mechanical Engineer
      • Feb 2019 - Jun 2020

      Istanbul Çam ve Sakura City HospitalConstruction Site Chief -Control of medical gas lines set-up, informing the teams about the project and following the work schedules,- Set up of the patient bed head units, intensive care units, anesthetic - surgical modules and pendants,-Monthly total costs data preparation, drawing as-builts, - Coordination with the main company,- Inspections of the working safely with safety expert,-Ensuring the parts of project to the main company expert,-Ensuring the completed project to the main expert.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Mechanical Engineer
      • Jan 2018 - Dec 2018

      Bağcılar Yeni Mahalle Gençlik Merkezi Ve Zeminaltı Otopark İnşaatı İşiMechanical Chief In a project that has 2 separated buildings with underground autopark-Responsible of fire lines, heating-cooling, infrastructure lines, irrigation of green sites, pool projects-Monthly total costs data preparation, drawing as-builts, -Control of set-up, informing the teams about the project and following the work schedules,- Inspections of the working safely with safety expert,-Ensuring the parts of project to the main company expert,-Ensuring the completed project to the main expert.

    • Mechanical Engineer
      • Jul 2015 - Dec 2017

      Toki İstanbul İli Başakşehir İlçesi Kayabaşı 868 Ada 5 Parsel 4.Etap 2.Bölge 476 Adet Konut Ve 48 Adet Dükkan İnşaatı İle Altyapı Ve Çevre Düzenlemesi İşiMechanical Chief İstanbul Jul 2015 - Dec 2017 [2 Years 6 Months]In a site that has 35 buildings and 550 floorsInspection per every building :-Solar pannels on the roof, heating systems with kaskad controlling,-Pex covered heating pipes, Pprc water-lines, waste water, natural gas, heating collectors, sanitary ware and fixtures,-Infrastructure of water-lines,-Infrastructure of natural gas-lines and indoor natural gas-lines of floors, -Fire fighting systems,-Water tanks, and water booster pumps,-Organisations of employees for accommodation,-Ensuring the parts of project to the main company expert,-Ensuring the completed project to the TOKİ experts.

    • Mechanical Engineer
      • Oct 2014 - Jul 2015

      Gürpınar Balık Hali Altyapı Ve Üstyapı İşi Field Engineer In total of horizontal of construction field about 150.000 square meter-Reporting of the construction field projects, -Building communication bridge between construction chief and employees,-Following the deadlines,-Confirmation of the completed projects,-Ammonia (-38 ⁰C) and glycol (-20 ⁰C) instant frozen room, cold storage room,-Infrastructure of water-lines,-Mechanical room, conditioning, air-handling unit, fire fight installation,-Following of the static and architectural projects and informing changes to employee.

    • Maintenance Mechanic
      • Sep 2014 - Oct 2014

      Maintenance and Controlling EngineerHaseki Eğitim ve Araştırma HastanesiYedikule Göğüs Hastalıkları HastanesiSüleymaniye Kadın Doğum HastanesiIn case of mechanical and electical problems:-Decisions of the emergency priorities,-Leading the teams,-Checking the boiler Room, mechanical room, air-handling units, conditioning units, wastewater pump room, fire fight systems, ventilation, plumbing, determining the in-operative systems in the hospital Maintenance and Controlling EngineerHaseki Eğitim ve Araştırma HastanesiYedikule Göğüs Hastalıkları HastanesiSüleymaniye Kadın Doğum HastanesiIn case of mechanical and electical problems:-Decisions of the emergency priorities,-Leading the teams,-Checking the boiler Room, mechanical room, air-handling units, conditioning units, wastewater pump room, fire fight systems, ventilation, plumbing, determining the in-operative systems in the hospital

    • Production Engineer
      • Jun 2013 - Jul 2014

      Production Engineer- Organizing production related organizations,- Follow up on orders,-Determine the materials,-Manufacturing improvement studies,-Data preparation to production chief. Production Engineer- Organizing production related organizations,- Follow up on orders,-Determine the materials,-Manufacturing improvement studies,-Data preparation to production chief.

    • Internship
      • Jun 2010 - Jul 2010

    • Internship
      • Jun 2008 - Jul 2008

Education

  • Hitit Üniversitesi
    Lisans Derecesi, Makine Mühendisliği
    2007 - 2011

Community

You need to have a working account to view this content. Click here to join now