Serdar Mercan

Wind Turbine Commissioner at ewi recruitment
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Staffing and Recruiting
    • 100 - 200 Employee
    • Wind Turbine Commissioner
      • Nov 2022 - Present

    • Germany
    • Renewable Energy Equipment Manufacturing
    • 700 & Above Employee
    • Wind Turbine Commissioner
      • Apr 2020 - Oct 2022

      Turkey *AZURESKY WF 65XN149/4800 (USA) *IRONSTAR WF 62XN149/4800 (USA) *PRIDDY WF 63XN149/4800 (USA) *FRONTIER II WF 74XN149/4800 (USA) *NYSATER WF (SWEDEN) *OMERLI WF 21XN149/4800 (Turkey) *ALARES02 WF 1XN149/4800 (Turkey) *GEYVE WF 11XN149/4800 (Turkey) *TATLIPINAR WF 20XN149/4800 (Turkey) *CERIT WF 10XN131/3900 (Turkey) *MERSINLI WF 10XN133/4800 (Turkey) *OVACIK WF 11XN131/360 (Turkey) *İSTANBUL 01 WF… Show more *AZURESKY WF 65XN149/4800 (USA) *IRONSTAR WF 62XN149/4800 (USA) *PRIDDY WF 63XN149/4800 (USA) *FRONTIER II WF 74XN149/4800 (USA) *NYSATER WF (SWEDEN) *OMERLI WF 21XN149/4800 (Turkey) *ALARES02 WF 1XN149/4800 (Turkey) *GEYVE WF 11XN149/4800 (Turkey) *TATLIPINAR WF 20XN149/4800 (Turkey) *CERIT WF 10XN131/3900 (Turkey) *MERSINLI WF 10XN133/4800 (Turkey) *OVACIK WF 11XN131/360 (Turkey) *İSTANBUL 01 WF 5XN133/4800 (Turkey) *ALARES01 WF 1XN149/4800 (Turkey) *BAGLAR WF 5XN133/4800 (Turkey) *TASPINAR WF 14XN149/4800 (Turkey) *SOKE WF 23XN149/4800 (Turkey) *MARMARA WF 2XN133/4800 (Turkey) *BAFA WF 10XN131/3900 (Turkey) *Responsible for Commissioning and Pre-Commissioning of Wind Turbine. *Troubleshooting of electrical, mechanical, and hydraulic systems. *Performing the routine operational testing and calibration of protective system of wind turbines. *Responsible for implementation of safety procedures & risk assessment in Wind Turbine. *Performing the Test Run and filling the documents and Final report. Show less

    • Spain
    • Renewable Energy Semiconductor Manufacturing
    • 700 & Above Employee
    • Troubleshooter
      • Jan 2020 - Feb 2020

      Denizli, Turkey *20xSiemens D3, 3.4 MW Wind Turbine. *Troubleshooting and fault diagnostic of mechanical, hydraulic or electrical. *Participate in the annual maintenance. *Responsible for implementation of safety procedures & risk assessment in Wind Turbine. *Creating of maintenance schedules, to optimize the turbine production. *Manage and being sure about performing retrofits.

    • Delegate Troubleshooter
      • May 2018 - Dec 2019

      Iran (Siahpoush Wind Farm) *18xSiemens D3, 3.4 MW Wind Turbine. *Support the local wind farm technician and support the wind farm. *Head of troubleshooting team on the wind farm. *Manage and monitor all aspects of health, safety and environment including daily HSE briefings and inductions. *Advice on ordering tools, cloths, necessary spare part, and consumable. *Supervisory on the performing of the annual maintenance.

    • Site Lead
      • May 2016 - May 2018

      Canakkale, Turkey *13xSiemens VS, 2.3 MW Wind Turbine & 27xSiemens D3, 3.2 MW Wind Turbine. *Troubleshooting and fault diagnostic of mechanical, hydraulic, or electrical. *Participate in the annual maintenance. *Responsible for implementation of safety procedures & risk assessment in Wind Turbine. *Responsible for Scheduling the yearly maintenance and troubleshooting and reporting on the wind farm. *Report wind farm generation, turbine performance, and maintenance issues to… Show more *13xSiemens VS, 2.3 MW Wind Turbine & 27xSiemens D3, 3.2 MW Wind Turbine. *Troubleshooting and fault diagnostic of mechanical, hydraulic, or electrical. *Participate in the annual maintenance. *Responsible for implementation of safety procedures & risk assessment in Wind Turbine. *Responsible for Scheduling the yearly maintenance and troubleshooting and reporting on the wind farm. *Report wind farm generation, turbine performance, and maintenance issues to management. *Performing major operation replacement, main bearing gearbox, gearbox Ims pinion.

    • Germany
    • Renewable Energy Equipment Manufacturing
    • 700 & Above Employee
    • Field Service Technician
      • Sep 2014 - Apr 2016

      Balıkesir, Türkiye *10xNordex N90, 2.5 MW Wind Turbine 11xNordex 117, 2.4 MW Wind Turbine. *Troubleshooting and fault diagnostic. *Participate in the annual maintenance. *Performing the retrofit in Wind Farm. *Store activity, check the tools calibration, safety issues. *Participate in major component replacement.

    • Türkiye
    • Utilities
    • 400 - 500 Employee
    • Electrical Troubleshoter and Maintenance
      • May 2013 - Aug 2014

      Şanlıurfa, Türkiye *Troubleshooting & repair, replace electrical services Participate in the annual maintenance. *Participate in turbine yearly maintenance. *Routine annual maintenances on gas engine and generator on control system. *Auxiliary system maintenance and troubleshooting.

    • Türkiye
    • Mining
    • 200 - 300 Employee
    • Electrical Technician,Troubleshoter and Maintenance
      • Sep 2011 - Dec 2012

      Çankırı, Türkiye *Troubleshooting & Repair on factory electrical systems. *Troubleshooting of mills, conveyor systems, presses, loading robots, unloading robots, packaging systems. *Routine annual maintenances of electrical control system and machines.

    • Mining
    • 400 - 500 Employee
    • Electrical Technician,Troubleshoter and Maintenance
      • Feb 2008 - Jun 2011

      Çanakkale, Türkiye *Installation of control room cabinets, assembly cable duct, assembly and connection of power and signal cables. *Installation of electrical components like, DC 700 1200 KW Motor , cooling system, DC 700 V Converter system, factory communication system, transformers 5MVA, MV Switchgear system, packing robots, Cooling pools and 6300 Kw motor system Controller Siemens PLC S7400-S7300-S7200. *Routine annual maintenances Electrical control system, DC 700V 1200 kw motors DC 700 V… Show more *Installation of control room cabinets, assembly cable duct, assembly and connection of power and signal cables. *Installation of electrical components like, DC 700 1200 KW Motor , cooling system, DC 700 V Converter system, factory communication system, transformers 5MVA, MV Switchgear system, packing robots, Cooling pools and 6300 Kw motor system Controller Siemens PLC S7400-S7300-S7200. *Routine annual maintenances Electrical control system, DC 700V 1200 kw motors DC 700 V converter, robots, auxiliary system and on machines. *Troubleshooting & Repair on factory electrical systems. Show less

Education

  • INDUSTRIAL VOCATIONAL HIGH SCHOOL
    ELECTRICTY, 4
    2000 - 2003

Community

You need to have a working account to view this content. Click here to join now