Project Lead Electrical and Instrumentation Engineer at Toshiba Plant Systems & Services Corp (TPSC Engineering)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cox’s Bazar, Chattogram, Bangladesh, BD

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Project Lead Electrical and Instrumentation Engineer
      • Sep 2021 - Present

    • Indonesia
    • Construction
    • 1 - 100 Employee
    • Area Leader Electrical and Instrumentation
      • Apr 2019 - Jan 2021

      Roles & Responsibilities: (Part of Acceleration Team to expedite the overall Balance of Plant, Electrical & Instrument (E&I) work for Indonesia’s Biggest Independent Power Provider (IPP) coal-fired power plant.)  Prepare plans and schedule for installation work related to all Electrical and Instrumentation activity.  Steer the construction and completion of the Plant Back End System for E&I scope of work  SWFGD (Seawater Flue Gas Desulphurization) – Aeration Basin, Absorber & Booster Fan, Compressed Air Generation, Induced Draft Fan, Fabric Filter, Fly Ash System, Flue Stack, and CEMS (Continuous Emission Monitoring System).  BOP Plant : Raw Water Treatment plant, Ammonia Removal System, ASH and Coal Run Off, Auxiliary Boiler, Chlorination System, Circulating Water Pumps, Tanks and all the Fire protection systems.etc.,  Overseeing erection completion of assigned packages are ready for commissioning and in line with the Master Work Program as Well as within Project Capitals.  Supervise E&I daily manpower arrangement and performance monitoring of 200+ workers, subcontractors and vendors at a peak time for 13 different areas.  Identify and solve issues related to erection feasibility through a detailed review of design documents, drawings, schematics, P&ID, method statement and risk assessment.  Built detail tracking records and documents on modification, instruction and changes from the client; for evidence against delay, Back-charge and final measurement. Show less

    • Malaysia
    • Construction
    • 1 - 100 Employee
      • Jun 2016 - Apr 2019

      • Nov 2014 - Jun 2016

      • Sep 2013 - Nov 2014

      • Jan 2011 - Sep 2013

Education

  • Dr MGR Educational and Research Institute

Community

You need to have a working account to view this content. Click here to join now