senthil s
Project Lead Electrical and Instrumentation Engineer at Toshiba Plant Systems & Services Corp (TPSC Engineering)- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Toshiba Plant Systems & Services Corp (TPSC Engineering)
-
Malaysia
-
Oil and Gas
-
100 - 200 Employee
-
Project Lead Electrical and Instrumentation Engineer
-
Sep 2021 - Present
-
-
-
PT. SATYAMITRA SURYA PERKASA
-
Indonesia
-
Construction
-
1 - 100 Employee
-
Area Leader Electrical and Instrumentation
-
Apr 2019 - Jan 2021
Roles & Responsibilities: (Part of Acceleration Team to expedite the overall Balance of Plant, Electrical & Instrument (E&I) work for Indonesia’s Biggest Independent Power Provider (IPP) coal-fired power plant.) Prepare plans and schedule for installation work related to all Electrical and Instrumentation activity. Steer the construction and completion of the Plant Back End System for E&I scope of work SWFGD (Seawater Flue Gas Desulphurization) – Aeration Basin, Absorber & Booster Fan, Compressed Air Generation, Induced Draft Fan, Fabric Filter, Fly Ash System, Flue Stack, and CEMS (Continuous Emission Monitoring System). BOP Plant : Raw Water Treatment plant, Ammonia Removal System, ASH and Coal Run Off, Auxiliary Boiler, Chlorination System, Circulating Water Pumps, Tanks and all the Fire protection systems.etc., Overseeing erection completion of assigned packages are ready for commissioning and in line with the Master Work Program as Well as within Project Capitals. Supervise E&I daily manpower arrangement and performance monitoring of 200+ workers, subcontractors and vendors at a peak time for 13 different areas. Identify and solve issues related to erection feasibility through a detailed review of design documents, drawings, schematics, P&ID, method statement and risk assessment. Built detail tracking records and documents on modification, instruction and changes from the client; for evidence against delay, Back-charge and final measurement. Show less
-
-
-
Eversendai Corporation Berhad
-
Malaysia
-
Construction
-
1 - 100 Employee
-
-
Jun 2016 - Apr 2019
-
-
-
Nov 2014 - Jun 2016
-
-
-
Sep 2013 - Nov 2014
-
-
-
Jan 2011 - Sep 2013
-
-
Education
-
Dr MGR Educational and Research Institute