Sean Quach

Senior Project Manager at DG Architects
  • Claim this Profile
Contact Information
Location
San Francisco, California, United States, US

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Registered Architect in the State of California
    California Architects Board
    Jul, 2007
    - Sep, 2024

Experience

    • South Africa
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Project Manager
      • Sep 2015 - Present

      SELECTED PROJECT EXPERIENCE • BioMarin Pharmaceuticals Novato, California, Buck Institute Vivarium Expansion, 1,500 SF • Denali (Building 6, The Cove), South San Francisco, California – Build-Out of Five-Story Headquarters and R&D Facility, 148,020 SF • RAPT Therapeutics‎ (formerly FLX Bio) South San Francisco, California – 561 and 571 Eccles Avenue. Service Yard, Lab and Office Improvements, 5885 SF • Global Blood Therapeutics (Building 4, The Cove), South San Francisco, California – 171 Oyster Point Boulevard) Levels 2 and 3. Lab, Office, and Vivarium Improvements totaling 60,649 SF • Achaogen South San Francisco, California – 1 Tower Place. 4th & 5th Floor Lab/Office Improvements, 24,500 SF System1 Biosciences, San Francisco, California – 1405 Minnesota Street. 3,650 SF of Analytical Lab and Office Renovations in 14,315 SF Warehouse Building • Annexon Biosciences South San Francisco, California – 180 Kimball Way (75,440 SF). Renovation of 12,316 SF of Office Space on the 2nd Floor to Office and Lab Space. • Surrozen (Building 4, The Cove), South San Francisco, California – 4th Floor Lab/Office Improvements, 30,310 SF • Tenaya (Building 4, The Cove), South San Francisco, California – 5th Fl0orTenant Improvement including Labs, Vivarium, Offices and Support Spaces, 29,700 SF • Aduro Biotech Berkeley, California – 740 Heinz Avenue (101,000 SF) Headquarters/R&D Facility Phase 1 Improvements on the 1st, 3rd and 4th Floors totaling 73,998 SF • Applied Molecular Evolution / Lilly Biotechnology Center San Diego, California – 10300 Campus Point Drive. Design of Mechanical Service Yard Building (2,370 SF) to Serve New 125,000 SF R&D and Office Facility • SRI International Menlo Park, California – Building P Immunology Labs. Renovation of Freezer Room and Data Center to Accommodate R&D Labs, 3,000 SF Show less

    • Hong Kong
    • Retail
    • 700 & Above Employee
    • Consultant / Project Manager
      • Apr 2014 - Jun 2015

      • Worked directly with Vice President on the creation and implementation of internal processes within Global Store Planning and Development department. The projects significantly reduced human input errors in the day-to-day work and improved productivity by as much as 300%. • Led department standards effort that included organizing a library of more than 300 types of fixtures. Created short-cut solutions in AutoCAD fixture blocks using built-in data and dynamic parametric features to automatically link to other tasks throughout the organization. All 300 blocks were packaged into a single master block-library, selectable via an intuitive menu structure. • Developed training videos and conducted department training to junior staff members • Concurrent to the special project, assisted with store planning at various global locations (i.e. T Galleria Venice, T Galleria Paris (ongoing), T Galleria, Siem Reap Galleria, TST East, etc.) Show less

    • Project Architect
      • Apr 2008 - Jun 2012

      • EmeryStation Greenway Building, Emeryville, California Successfully managed and administered the construction of a new cold shell, mixed-use building, LEED – Gold certified; 4 levels with 1 level underground parking; over 150,000 SF of retail, laboratories, and office space; succeeded in keeping the overall project on budget and on schedule despite numerous additions and deductions of scope during construction process. • SRI International, Menlo Park, California Renovation of R&D facility to provide immunology laboratories at the Stanford Research Institute, 3,500 SF. • 365 Main - Chandler Data Center, Chandler, Arizona Expansion of data center adding 214,000 SF of building space to existing 314,000 SF facility. • Applied Molecular Evolution / Lilly Biotechnology Center, San Diego, California Design of mechanical service yard building (2,370 SF) to serve new 125,000 SF R&D and office facility. • Celgene, San Francisco, California New R&D/Office facility, 54,000 SF. • Washington Hospital Healthcare System Fremont, California Smoke compartment master plan and Smoke barrier upgrade Show less

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Project Manager
      • Oct 2000 - Mar 2008

      • Kaiser Permanente, Oakland, California ADA Upgrade and Barrier Removal Managed the complex and high-profile project with over 4000 barriers to be address at one of the busiest hospital facility in the Bay Area; developed design solutions minimizing impact to daily business operation and critical functions of the hospital; conducted meetings and coordinated between a diverse group of stakeholders including the client’s project manager, contractor, hospital staff, site inspectors, and regulatory agency • Kaiser Permanente, Pleasanton, California Radiology & Fluoroscopy Room Remodel; 850 SF • Kaiser Permanente, Walnut Creek, California Mammography Department Expansion. • Port of Oakland – APL Terminal (Berths 60-63), Oakland, California Construction of two new port buildings. Marine Operations Building, 5,300 SF (offices, toilet facility, break room and crane repair shop) Maintenance and Repair Building, 25,000 SF (repair shop, parts storage & offices) • Port of Oakland – SSA Terminal (Berths 57-59), Oakland, California Construction of seven new buildings, and improvements to an existing administration building • (3) Longshoreman Buildings, 2,217 SF each • Chassis Maintenance Shop, 7,792 SF • Power Bays Maintenance Shop, 14,683 SF • Clerk/Cashier Building, 2,496 SF • Crane Maintenance Shop, 4,300 SF • Improvement of existing Administration Building, 9,795 SF • Department of Correction, Oakland, California Tenant improvement and accessibility upgrade, 22,000 SF Show less

Education

  • University of California, Berkeley
    Bachelor’s Degree, Architecture
    1992 - 1995

Community

You need to have a working account to view this content. Click here to join now