Sean Coetzee

Site Lifting Specialist assigned to (TEPA) Total Energies Angola at Grupo Epalmo
  • Claim this Profile
Contact Information
Location
South Africa, ZA

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • FOET + CA-EBS
    Survival Offshore Training
    Jul, 2021
    - Sep, 2024
  • OPITO Stage 4 Banksman & Slinger
    Offshore Africa Training Centre
    Jan, 2023
    - Sep, 2024
  • OPITO Stage 4 Rigger
    Offshore Africa Training Centre
    Jan, 2023
    - Sep, 2024
  • Transfer safely by boat
    Project Maritime Training
    Jan, 2023
    - Sep, 2024

Experience

    • Portugal
    • Human Resources Services
    • 1 - 100 Employee
    • Site Lifting Specialist assigned to (TEPA) Total Energies Angola
      • Apr 2023 - Present
    • France
    • Oil and Gas
    • 100 - 200 Employee
    • Deck Supervisor
      • Nov 2022 - Apr 2023
    • Switzerland
    • Oil and Gas
    • 1 - 100 Employee
    • Deck Foreman
      • Jul 2022 - Nov 2022

      Hook up & riser installation.Pre-com & Topside spool installation. Hook up & riser installation.Pre-com & Topside spool installation.

    • South Africa
    • Oil and Gas
    • 1 - 100 Employee
    • Rigging Supervisor
      • Feb 2022 - Jul 2022

      Seawater inlet riser installation on the Coral Sul FLNG Seawater inlet riser installation on the Coral Sul FLNG

    • Nigeria
    • Oil and Gas
    • 200 - 300 Employee
    • Deck Foreman
      • Oct 2009 - Feb 2022

      Onboard Siem Marlin vessel for SNEPCO at Bonga oil field Onboard African Vision for Total at Egina/Akpo Field, Nigeria For Chevron, onboard Siem Marlin/African Inspiration/Polar Onyx Vessel on Agbami Field Escravos (Meji field) project, Nigeria Deck & crane operation Rigid Jumper, HFL & EFL installations Tree installations Installation of suction piles SCM & Choke change out ROV support & subsea projects Administrative tasks & procedures Inventories of various equipment & rigging Show less

    • Norway
    • Oil and Gas
    • 1 - 100 Employee
    • Rigging Supervisor
      • Jun 2009 - Jun 2009

      Rigging and load out of STP buoy (1000 ton) Rigging and load out of STP buoy (1000 ton)

    • United Kingdom
    • Oil and Gas
    • 300 - 400 Employee
    • Deck Foreman
      • Mar 2009 - Jun 2009

      Frade FPSO Project, Brasil Riser installation Umbilical installation Assistance with pre-commissioning Diesel de-watering Co-ordination of rigging & lifting operations Frade FPSO Project, Brasil Riser installation Umbilical installation Assistance with pre-commissioning Diesel de-watering Co-ordination of rigging & lifting operations

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Deck Foreman
      • Jan 2009 - Mar 2009

      Akpo Project, Nigeria Manual lifting and movement of spools Inspection of rigging equipment Liaise between personnel and supervisor Rigging of equipment wrt riser pull-inn`s & pigging operations Akpo Project, Nigeria Manual lifting and movement of spools Inspection of rigging equipment Liaise between personnel and supervisor Rigging of equipment wrt riser pull-inn`s & pigging operations

    • Egypt
    • Oil and Gas
    • 300 - 400 Employee
    • Tower Operator
      • Sep 2008 - Dec 2008

      Controlling anchor winches in accordance with barge foreman instruction Monitoring and recording of all activities on the barge Marine and survey co-ordination Controlling anchor winches in accordance with barge foreman instruction Monitoring and recording of all activities on the barge Marine and survey co-ordination

    • Switzerland
    • Oil and Gas
    • 700 & Above Employee
    • Deck Foreman
      • Apr 2008 - Jun 2008

      Deepwater Expedition, Cape Town Harbour Heavy lifting of risers and containers (over 25 ton) Stripping of risers Connecting of hydraulic lines and lifting onto vessel (over 30 ton) Management of personnel Deepwater Expedition, Cape Town Harbour Heavy lifting of risers and containers (over 25 ton) Stripping of risers Connecting of hydraulic lines and lifting onto vessel (over 30 ton) Management of personnel

    • Deck Foreman
      • Apr 2006 - Mar 2008

Community

You need to have a working account to view this content. Click here to join now