Seamus Scanlon BSc,MSCSI, MRICS

Senior Quantity Surveyor at John Sisk and Son Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Ireland, IE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 200 - 300 Employee
    • Senior Quantity Surveyor
      • Apr 2019 - Present

      The design & build Coopers Cross 472 Unit Residential Project, situated at North Wall, Dublin 1 generally bounded by Sheriff Street Upper to the north, New Wapping Street to the west, Mayor Street Upper.

    • Senior Quantity Surveyor
      • Jun 2017 - Dec 2019

      The Redevelopment of the Herbert Park Hotel and Development of 10 Pembroke Place, Dublin 4. The redevelopment involved building on 38 additional bedrooms and the new build consists of an office building and a 38 unit apart Hotel.

    • Senior Quantity Surveyor
      • Nov 2016 - Aug 2019

      The construction works comprised of demolition of existing building (separate contract) and the construction of 7 storey office development to shell and core standard.The Installation of New basement to the south of the building. The construction of a new structural steel frame with wide slab precast plank building extension from lower ground to 6th floor level. The installation of Entire Glazed Façade on the eastern elevation. Installation of ‘krion’ stone to North, south and west elevations with a white ceramic brick Show less

    • Senior Quantity Surveyor
      • May 2015 - Oct 2016

      The works consisted of the construction of a 6 storey over single basement office block of 4,270 sq.m. to ‘shell and core’ standard. The site is at Charlemont Place in Dublin 2, a confined site requiring careful and well planned logistics. The site is bounded on the West side by the Green Line Luas viaduct.

    • Senior Quantity Surveyor
      • Feb 2016 - Sep 2016

      Bank of Ireland Office Fit Out. The project included the CAT B fit out works to Baggot Plaza including but not limited to, CSA fit out works, Mechanical and Electrical, Landscaping and all other associated construction works.

    • Ireland
    • Construction
    • 700 & Above Employee
    • Project Quantity Surveyor
      • Jan 2013 - Apr 2015

      The Cultural Centre includes a performance space with seating for 100 people, an art gallery, education workshop space and cafe. The library will include a public “living room” overlooking the park, with space for internet use, newspapers and magazines as well as a resource for community information and a dedicated suite of rooms for young people.

    • Project Quantity Surveyor
      • Jan 2012 - Dec 2012

      The Phoenix Care Centre is the first new building to be constructed as part of the redevelopment of the old St Brendan's Hospital site in Grangegorman. The new building has a total floor area of 7,600m² comprising new residential accommodation for patients with 54 bedrooms and en-suites, recreational rooms, clinical rooms, administration areas, seclusion rooms and therapy gardens. The building is spread over three floors which are constructed around two Internal Courtyards.

    • Project Quantity Surveyor
      • Jul 2012 - Nov 2012

      The project comprised the fit out of 2 floors of an existing building. Sisk were employed as the main contractor and responsible for the management and construction of the fit-out works along with playing an integral role in assisting the client and design team in the design and development of the works. The works were completed over three phases with an overall duration of 19 weeks. During Phases 2 & 3, SISK delivered the project whilst ensuring BSKYB’s live call centre was uninterrupted.

    • Project Quantity Surveyor
      • Sep 2010 - Dec 2011

      Primary Care & Mental Health Centre for the treatment of the public with nursing, therapy, GP, mental health, dentistry and community services. The accommodation also includes a separate single storey crèche. The building is a concrete framed structure finished with an internal block wall and a combination of facing brick and ceramic tile rainscreen cladding. Windows are composite aluminium windows with some aluminium curtain walling. Internal plasterboard partitions with vinyl floor finishes. Ceilings are a combination of MF, ceiling tiles and exposed concrete ceiling finishes. Mechanical Services include new gas and water incoming services, central heating centre installation, soils and wastes, water services, air conditioning and ventilation, heating services and protective services installations. Show less

    • Project Quantity Surveyor
      • Jul 2008 - Sep 2010

      The project involved:• Construction & fit-out of 50,000 seat stadium over double basement• New underground car park underneath the new back pitch• Stadium fit-out including construction of entrance areas, bars, WC’s, offices, media facilities, restaurant areas, kiosks, premium box areas, presidential suite etc.• New pitch installation including advertising boards, screens etc.• Stadium Management Building, a separate facility which also includes the new Wanderers’ Football Club Pavilion.The new stadium has all seated capacity of 50,000 and consists of a continuous curvilinear shaped stand enclosing all four sides of the ground. The South, East and West Stands have four tiers of seating for spectators. The second tier provides facilities for premium ticket holders while the third tier provides facilities for corporate boxes. The North Stand comprises of one low level seating tier to reflect its proximity to the residential properties at that end of the ground. Show less

    • Quantity Surveyor
      • Nov 2006 - Jun 2008

      • 228 apartments in 3 blocks varying 3-11 storey, some with "live work" areas incorporated.• 5-storey office building (approx 8000m²) over double basement.• 4 Star Hilton Hotel: 120 bedrooms; 15 top floor Executive suites; leisure centre.• Retail units• 310 car park spaces at basement level.

    • Graduate Quantity Surveyor
      • May 2005 - Oct 2006

      Park Place is Dublin’s most exciting commercial development in decades. Situated in the heart of the thriving Dublin 2 Business district, Park Place ranks as a new standard in European Office Development. This premium, sustainable office environment is specifically designed to meet the needs and expectations of today’s corporate occupiers.Park Place’s 26,973 sq m is laid out in three separate blocks that can be interconnected but also feature three high profile entrance lobbies offering major corporate occupiers ‘own door’ access and significant presence on Hatch Street. Show less

    • Ireland
    • Construction
    • 700 & Above Employee
    • Junior Quantity Surveyor
      • 2003 - 2005

      I worked as a Student Quantity Surveyor on this project, the largest ever commercial development in Ireland and one of the most comprehensive suburban regeneration schemes ever undertaken in either Ireland or the UK. Incorporated into the 17 acre site is a 281,747m2 structure comprising 90,000m2 retail area; 12-screen multiplex cinema; 23,000m2 office space; more than 30 restaurants; 200-seat theatre; 27 apartments; medical centre; day-care centre; adult education centre; pub; underground car parking for 3,500 cars. The project won numerous awards and was successfully completed within programme and budget. Seamus worked within a team of Quantity Surveyors and developed excellent experience working on this prestigious project. Show less

Education

  • Dublin Institute of Technology
    Degree in Construction Economics & Management
    2003 - 2005
  • Institute of Technology, Sligo
    Diploma in Construction Economics
    2002 - 2003
  • Institute of Technology, Sligo
    Certificate in Construction Technology
    2000 - 2002
  • Scoil Mhuire Strokestown
    1994 - 2000

Community

You need to have a working account to view this content. Click here to join now