Scott Mackie
Operations Manager at Envac Australia- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Envac
-
Sweden
-
Environmental Services
-
100 - 200 Employee
-
Operations Manager
-
Jun 2021 - Present
I am managing the operation of Australia's first Automated Waste Collection Facility. An underground pipe network connects buildings and public litterbins to a vacuum system. The vacuum is operated several times per day and draws general waste and recyclables to the facility. Here it is separated then stored for offsite disposal.
-
-
Mechanical Engineer
-
Apr 2019 - Jun 2021
Managing the installation of Australia's first Automated Waste Collection System (AWCS) in the new Maroochydore City Centre.
-
-
-
Bio-Gen Solutions
-
Sunshine Coast Queensland
-
Project Coordinator
-
Feb 2018 - Nov 2018
Project management of new tank projects. Bio-Gen Solutions builds bolted tanks at sites across Australia. The tanks are prefabricated and installed by a small crew of tank specialists. The whole construction process is done from ground level by jacking the tank. My role is managing the project from order through to handover. I deal with the design, procurement and quality assurance. Project management of new tank projects. Bio-Gen Solutions builds bolted tanks at sites across Australia. The tanks are prefabricated and installed by a small crew of tank specialists. The whole construction process is done from ground level by jacking the tank. My role is managing the project from order through to handover. I deal with the design, procurement and quality assurance.
-
-
-
Ventia Engineering Services (formerly ICD Asia Pacific)
-
Australia
-
Design
-
1 - 100 Employee
-
Project Engineer / Project Manager
-
May 2011 - Sep 2017
I was part of the capital projects team at the Geelong Refinery (formerly owned by Shell). I worked on a number of projects.across the refinery. This included a $10 million safety upgrade of the "Mogas" unit and replacement of the refinery's tank drainage system. Since April 2015 I've been in ICD's Geelong office. My projects since have been with BP and Origin. I was part of the capital projects team at the Geelong Refinery (formerly owned by Shell). I worked on a number of projects.across the refinery. This included a $10 million safety upgrade of the "Mogas" unit and replacement of the refinery's tank drainage system. Since April 2015 I've been in ICD's Geelong office. My projects since have been with BP and Origin.
-
-
-
Technical Staffing Resources
-
United States
-
Staffing and Recruiting
-
200 - 300 Employee
-
Project Engineer
-
Mar 2010 - Aug 2010
Project engineering on Carbon Sequestration unit for Chevron Gorgon Project Project engineering on Carbon Sequestration unit for Chevron Gorgon Project
-
-
-
Amec Foster Wheeler
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Project Engineer
-
Jun 2008 - Mar 2010
Data management of engineering information for Woodside Pluto Project Data management of engineering information for Woodside Pluto Project
-
-
-
Worley
-
Australia
-
Professional Services
-
700 & Above Employee
-
Engineer
-
2003 - 2005
-
-
Education
-
University of Melbourne
Bachelor of Engineering & Bachelor of Computer Science, Mechanical Engineering