Scott Lynch

mobile service engineer at Torrent Trackside Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Coppull, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Truck Transportation
    • 1 - 100 Employee
    • mobile service engineer
      • Sep 2012 - Present

      I am responsible for the pre planned maintenace & repair of rail specific plant owned by our customer & hired assets from our company groups, we work to schedules created from our offices and carry out these duties daily at various locations. As part of my ongoing development and to maintain high standards, I undergo regular assessments and training to ensure we keep upto date with any change in the Industry's rules or regulations. I am responsible for the pre planned maintenace & repair of rail specific plant owned by our customer & hired assets from our company groups, we work to schedules created from our offices and carry out these duties daily at various locations. As part of my ongoing development and to maintain high standards, I undergo regular assessments and training to ensure we keep upto date with any change in the Industry's rules or regulations.

    • Canada
    • Education Administration Programs
    • 1 - 100 Employee
    • Lifting inspections / calibration & maintenance tool fitter
      • Sep 2010 - Sep 2011

      I travelled to customer sites all over the UK & Ireland to commission/service/ calibrate new & existing assets for the transportation industry (Road/rail & maritime) Duties included- calibration / inspection & testing to a wide variety of lifting aids, machinery & tools. Loller inspections carried out on the following equipment - Large lifting chains Strops/ straps / wire slings mechanical lifts Column Jack lifts Forklift trucks Truck mounted Hiabs Hook loaders Bin collection vehicles /side load / rear load Compactor trailer units Ladders / hoists / mobile scaffold platforms Chain recovery packs - North Sea industry Winch systems - NSI Calibration duties included - Torque wrenches - test/repair Workshop tools - test / repair Gauges - hi & low pressure / air & hydraulic -test Pressing tools - electrical connections - test In this role I was responsible for creating up to date individual reports on the clients assets during the servicing period, making sure all readings & measurements were documented so as to keep a detailed history of any owned assets. Show less

    • Construction
    • 1 - 100 Employee
    • Rail Plant engineer
      • Sep 2004 - Sep 2008

      I was Responsible for the day to day maintenance & repair of specialist equipment for use in large scale Rail infrastructure projects, SRS road/rail wagons, Mecalec access road/rail platform's, small portable machinery IE- railsaws,impact wrenches, rail stressors,lighting generators, I was part of a small team on Rotations of nights/days & call outs to fully cover the site 24hrs a day 7days a week. Further duties included, planned servicing of Large site Generators 22KVA TO 500KVA/ tower lights on large compounds from stockport to crewe, the Inspection/ service & Repair of HGV mounted cranes & hoists and servicing & control of vehicle defects of the many makes of vans used - pick ups, crew buses and smaller vans company cars, brake replacement, minor repairs and preparation work for MOTs. Show less

    • Rail Plant Fitter
      • Sep 2001 - Sep 2004

      Depot based & site work Duties included - Service/maintenance of rail specific plant machinery Including - rail grinders / rail stressing gear / on track plant / industry specialist lifting equipment inspections / generators / trackside lighting / mobile tower lights. Other duties included- Site work, trackside lighting set up and cover for the duration of planned works. Operation of rail specific machinery fastclip installation & removal, Cold hole expansion works on renewal sites / using the rail mounted fastclip & sleeper lifter on worksites throughout the country. Participate in the of hours call out rota covering the north west area. Site servicing of long term hire machinery on large scale projects in the UK Show less

    • Plant Fitter
      • Dec 1999 - Jun 2001

      Duties included- Servicing /maintenance/ repair, to a wide range of mid sized construction plant machinery & power tools for the hire industry. Dealing with customer enquires at the hire desk or on the phone, organising for equipment to be collected or delivered to site by working closely with the branch team. cooperate with the other branches in the group to keep stock levels of high order items serviced and ready to hire/exchange between depots as and when required. Loading / unloading of vans Yard duties, general housekeeping duties Show less

    • Plant fitter
      • Oct 1996 - Dec 1999

      My Duties included the servicing/repair to a large variety of small and medium construction plant machinery for the company’s hire fleet, as well as customers machinery, I gained knowledge in dealing directly with customers from the front desk in suppling the correct tools for the job and taking in bookings for repairs through to quoting for repairs, liaising with manufacturers to source parts and making sure the repairs were done to a high standard and delivered in a timely manner to minimise downtime to the customer. Machines worked on included- Mini/midi diggers / track barrows / Site generators / dumpers up to 3 ton / road saws / petrol saws/ P.A.T testing of 110v power tools.. Show less

    • Apprentice Plant fitter
      • Sep 1993 - Oct 1996

      learning to overhaul/repair/service and maintain a wide range of static and mobile welding plant, Large site Generators, diesel/petrol & LPG driven, Large Diesel driven sludge pumps, Compressors, Industrial mortar pumps, cement pumps and Hydraulic equipment for the north sea industry. I worked on associated equipment like 12v/24v engine electrical systems, removal and replacement of large alternators, 3 phase motors and repair/replacemant of wiring systems using manufacturers schematic diagrams. Show less

Education

  • Marine training board Govan
    mechanical & electrical engineering
    1993 - 1996

Community

You need to have a working account to view this content. Click here to join now