Scott Kimmel, EIT, PMP

Project Manager at Woodstream Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Green Belt Certification (GB)
    ITT Inc.
    Feb, 2015
    - Nov, 2024
  • Engineer In Training
    Commonwealth of Pennsylvania
    May, 2007
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute
    Apr, 2021
    - Nov, 2024

Experience

    • United States
    • Manufacturing
    • 200 - 300 Employee
    • Project Manager
      • Feb 2019 - Present

      • Responsible for the management of a variety of projects undertaken by the Terro & Safer new product development teams assisting in achieving the strategic business objectives. • Interacted with multiple departments’ personnel, senior managers, executives and outside vendors to advance projects from chartered ideas to new product offerings using a phase-gate process. • Provided supervision and guidance to project team stakeholders, developed project timelines, identified constraints, planned and documented project criterion, tracked completion of action items, developed requests for capital, consolidated information for charter/phase reviews.

    • United States
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Product Engineer
      • Nov 2011 - Feb 2019

      • Responsible for maintaining, updating, qualifying and troubleshooting the ITT Dia-Flo valve product line. • Responsible for developing the ITT Bornemann SLH and SLH-4G Food/Hygienic Pump product line for the North American market. • Created 3-D solid models, assemblies & technical drawings with PTC Creo. • Assumed responsibility as the facility FARO Arm 3-D scanning/analysis expert; assisted all ITT product lines. • Reviewed nuclear valve seismic report calculations. • Assisted ITT Pure-Flo product line. • Responded to Non-Compliance Reports (NCRs), Engineer Change Notices (ECNs), customer problems, shop floor problems and quotes/orders/returns. Maintained BPCS & SAP database Item Master Notes, BOM’s, and technical documentation.

    • United Kingdom
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Associate Engineer
      • Jul 2008 - Nov 2011

      · Assisted in the Paladin Integrated Management (PIM) program focusing on the development of the M109 PIM Self-Propelled Howitzer (SPH) and its support vehicle for U.S. military through the integration of new technologies and Bradley Fighting Vehicle common components. · Responsible for design, BOM/drawing maintenance, parts tracking & hands-on build support for roughly half of the installations on the SPH’s Cab (Turret). · Performed various tests and engineering analyses to determine installations’ functionality, quality, performance & full integration with surrounding vehicle equipment. · Created 3-D solid models/assemblies & technical drawings with a heavy use of Pro/ENGINEER.

    • United States
    • Civil Engineering
    • 100 - 200 Employee
    • Project Engineer
      • Jun 2007 - Jun 2008

      • Assisted engineers on design projects (water treatment and filtration plants); manufacturer part selection, site visits, AutoCAD design, PWEA informational meetings. • Assisted land surveyors on state projects; field surveys (minor use of equipment), AutoCAD Land Desktop design, survey quality checks, bridge profile measurements, deed and tax map research. • Assisted engineers on design projects (water treatment and filtration plants); manufacturer part selection, site visits, AutoCAD design, PWEA informational meetings. • Assisted land surveyors on state projects; field surveys (minor use of equipment), AutoCAD Land Desktop design, survey quality checks, bridge profile measurements, deed and tax map research.

    • United States
    • Design Services
    • 1 - 100 Employee
    • Mechanical Engineer Intern
      • Jun 2006 - Aug 2006

      • Co-authored a DoD vehicle wash station study at MCB Quantico. • Performed HVAC load calculations for commercial and residential buildings. • Drafted building plan electrical and HVAC layouts with AutoCAD. • Co-authored a DoD vehicle wash station study at MCB Quantico. • Performed HVAC load calculations for commercial and residential buildings. • Drafted building plan electrical and HVAC layouts with AutoCAD.

Education

  • Penn State University
    Bachelor's, Mechanical Engineering Technology
    2003 - 2007

Community

You need to have a working account to view this content. Click here to join now