SAURABH MAHOBIYA
Deputy Manager at LANCO INFRATECH LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
LANCO INFRATECH LIMITED
-
Spain
-
Oil and Gas
-
100 - 200 Employee
-
Deputy Manager
-
Oct 2015 - Present
Industries Handled: Power Plants Construction Engineering. Execution of Boiler erection and commissioning. Critical Piping Erection Work.; Job Execute: 2 x 660 (1320 MW) Lanco Vidarbha Thermal Power Plant Project Wardha Nagpur Maharashtra. Project Execution work for BTG package. Planning of pre-assembly & erection activities of boiler for two units. Direct supervision on the above works done by the sub contractors. Monitoring the day to day work progress and regular reviews with concerned sub agencies Project coordination with various departments. Planning up to Micro level and monitoring of job progress. To ensure that Boiler Fabrication or Assembling and Erection is going according to given drawing. Incoming materials verification. Quality control and verification of contractor’s bills. Ensuring safety as per standard procedure. Show less
-
-
-
-
Manager
-
Sep 2013 - Oct 2015
Hi Hi
-
-
-
-
Assistant Manager
-
Feb 2011 - Sep 2013
Industries Handled: Power Plants Construction Engineering. Execution of Boiler erection and commissioning. Critical Piping Erection Work.; Job Execute: 2 x 660 (1320 MW) Lanco Vidarbha Thermal Power Plant Project Wardha Nagpur Maharashtra. Project Execution work for BTG package. Planning of pre-assembly & erection activities of boiler for two units. Direct supervision on the above works done by the sub contractors. Monitoring the day to day work progress and regular reviews with concerned sub agencies Project coordination with various departments. Planning up to Micro level and monitoring of job progress. To ensure that Boiler Fabrication or Assembling and Erection is going according to given drawing. Incoming materials verification. Quality control and verification of contractor’s bills. Ensuring safety as per standard procedure. Show less
-
-
-
-
Jr. Manager
-
Sep 2010 - Jan 2011
Job Execute: 2 x 660 (1320 MW) Jhajjar Thermal Power Plant Project. Owner of China Light & Power. Designed by SEPCO III Electric Power Construction Corp. Jharli-Jhajjar Haryana. Execution of the Pressure Part of Boiler in full compliance with the technical specification of the project. Planning Pre Fabrication, Erection, Alignment, Hydro test and Light up of Boiler and providing clearances. Planning up to Micro level and monitoring of job progress. To ensure that Pressure Parts of Boiler Fabrication or Assembling and Erection is going according to given drawing. Better Utilization of Manpower & Available resource to get maximum output in organization benefit. Making the Back filling report Show less
-
-
-
-
Senior Engineer
-
Apr 2009 - Aug 2010
Job Executed: 2 x 80 (160 MW) Captive Power Plant project of Hindustan Zinc Ltd. Designed by Bharat Heavy Electrical Ltd. Dariba Rajasthan. Execution of the Pressure Part of Boiler in full compliance with the technical specification of the project. Planning Pre Fabrication, Erection, Alignment, Hydro test and Light up of Boiler and providing clearances. Project coordination with various departments. Planning up to Micro level and monitoring of job progress. To ensure that Pressure Parts of Boiler Fabrication or Assembling and Erection is going according to given drawing. Better Utilization of Manpower & Available resource to get maximum output in organization benefit. Witness of Hydro testing of Boiler. Take out the work from my subordinate Show less
-
-
-
-
Project Engineer
-
Oct 2006 - Apr 2009
Prepared the Piping & equipment layout drawings for plant Execution Work. Overall supervision, assistance and control in Execution work of piping jobs. Planning up to Micro level and monitoring of job progress. To ensure that Pipe Fabrication & Erection is going according to given Isometric, Plan and Piping & Instrument drawing (P & ID). Overall responsibility of job quality, i.e. welding procedure, cross checking of pipe and pipe fittings which is specified material in drawings. Witness of Hydro testing of piping circuits. Reported of work to Project Manager &; day by day. Achievements . Witness of Hydro Test and Light up of 2 x 80 MW Boiler. Synchronies of 1 out of 2 x 80 MW Boilers Show less
-
-
Education
-
Indira Gandhi Govt. Engineering College
Bachelor of Engineering, Mechanical