Sattar Vahora

Assistant General Manager at Larsen & Toubro Power
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Vadodara, Gujarat, India, IN
Languages
  • English Full professional proficiency
  • Hindi Professional working proficiency
  • Gujarati Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Assistant General Manager
      • Sep 2018 - Present

    • Manager - Electrical
      • Nov 2009 - Present

      Job Responsibility: Engineering review, Project management & execution for Boiler, Turbine and Balance of plant for 3 x 660MW Supercritical Thermal Power Project.• Preparation of enquiry specification, bid evaluations, technical discussion with vendors and equipment order placement.• Liaison with customer, engineering consultant, JV companies and Vendors.• Review and approval of Engineering documents & drawings in line with standards and contractual requirements and obtain approvals from consultant and customer.• Monitor and execute the equipment manufacturing, inspection at vendor place or at testing institute and delivery of material at site as per project schedule requirement.• Monitor equipments erection, testing & commissioning and support the site team for successful erection & commissioning activities completion as per project schedule.• Billing break-up(BBU) preparation and obtain customer approvals. Material invoices to customer as per planned budget. Review and approvals of vendor BBUs.• Conduct project progress review meetings with consultant/customer, JV companies, Vendors and site team.• Project time and cost management.• Risk assessment and mitigation plan.• Contract negotiation and finalization. Show less

    • India
    • Construction
    • 700 & Above Employee
    • Lead Engineer
      • Aug 2006 - Nov 2009

      Job Responsibility: Engineering & Project execution of E&I Turnkey projects for Cement, Metal, Paper and Ports. Executed following projects for Cement plant, Paper plant and Port trust. • Saudi paper PM4, Dammam, Saudi Arabia. (Consultant: M/s Metso Paper, Sweden) : EPC Project – Electrical. • Birla cement Ltd, Chittorgarh, India. : SPRS system. • Hindustan Zink, Rajasthan, India. : AC drives (VFD) for various applications. • Chettinad Port Ltd, Chennai, India. : EPC project –E&I package. • Haldia Dock Complex, Kolkata Port trust, India. : EPC project –E&I package. • Birla Super Cement Ltd, Bangalore, India. : EPC project –E&I package. • Chettinad Cement Corporation Ltd, Tamil Nadu. : EPC project –E&I package. Achievements: • Successful erection & commissioning at Saudi Arabia: Successfully executed EPC-Electrical project for 2000 MPM capacity Tissue paper machine supplied by METSO paper. (Scope includes MCC, PCC, Motors, Transformers and AC drives(VFD) for Tissue Machine as Standalone drives with Master slave configuration of drives) Show less

    • India
    • Wholesale Building Materials
    • 700 & Above Employee
    • Engineer
      • Jul 2002 - Aug 2006

      Job Responsibility: Electrical system O&M for 16000TPD cement plant. Engineering, Procurement and Execution of up gradation projects. Head of section-Electrical for 2 x7500 TPD Kiln section and responsible for operation and maintenance of electrical system like: • 6.6kv SF6/Vacuum circuit breakers and MV switchgear. • 11kV/6.6kV/440volts Power and Distribution transformers. • Power and Motor control centers (PCC & MCC feeders). • HT Motors up to 4.1MW and DC motors up to 1350KW and LT AC motors. • Slip Power Recovery system for HT motor speed control. • Variable Frequency Drives (VFD) and DC drive panels. • Microprocessor based protection Relays and its coordination. • Batteries and Battery charger Panels. • UPS and UPS battery banks. Achievements: Successfully executed up-gradation of Kiln – I&II production line from 7500TPD to 8500TPD within stipulated time frame and with all safety measures. Planned all Electrical material and manpower requirement and scheduled the work activities for timely & safe execution. Show less

    • India
    • Construction
    • 700 & Above Employee
    • Project Engineer
      • Mar 1995 - Jul 2002

      Erection and commissioning engineer Erection and commissioning engineer

Education

  • The Maharaja Sayajirao University of Baroda
    Electrical engineering, First Class distinction
    1991 - 1994

Community

You need to have a working account to view this content. Click here to join now