Sathish Leelakrishnan

Technical Project Manager at Result Group (formerly Result Packaging)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Melbourne, Victoria, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

LinkedIn User

Sathish goes above and beyond , always active to deliver his very best in every challenge we have given him. A talented Engineer, with excellent personal skills . Always a pleasure to work with , and admired by his colleagues. Thanks Sathish for your support.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Technical Project Manager
      • Oct 2021 - Present

    • Australia
    • Machinery Manufacturing
    • 300 - 400 Employee
    • Manufacturing Engineer Supervisor
      • Feb 2020 - Sep 2021

    • Production Engineer
      • May 2017 - Feb 2020

      • Plan and coordinate production engineering processes on daily basis to produce high quality products in safe conditions.• Implement and manage the introduction of new products and design into manufacturing and making sure the change is implemented in timely manner.• Develop process improvements to effectively utilize equipment and materials to maximize production.• Provide engineering support for production and suppliers and other stakeholders in maintaining the quality of the product.• Perform engineering analysis to reduce lost time in the production line.• Investigate problems, analyse root causes and derive resolutions.• Evaluate current production activities and make recommendations for improvements.• Implement cost reduction initiatives while maintaining high quality standards.• Help in developing operating instructions and equipment specifications for production activities.• Provides training and guidance to team members to accomplish production goals.• Stay current with product specifications, engineering technology and production processes.• Develop best practices to improve production capacity, quality and reliability.• Maintain Axapta item master and keep up to date and accurate. Item master creation and maintenance process documented.• Accurately processing and implementing PRD(Product release documentation)s in a timely manner. PRDs to be reviewed and implemented.• Creating and processing redlines within an agreed time frame.• Implement and manage the introduction of new products and design into manufacturing and making sure the change is implemented in a smooth manner.• Very good knowledge in Microsoft Dynamics Ax12, Excel, Power point.

    • Production Planner & Engineering Change Coordinator
      • Oct 2008 - May 2017

      1.To maintain Axapta item master and keep up to date and accurate. Item master creation and maintenance process documented within 6 months of start.2.Accurately processing and implementing PRD’s in a timely manner. PRDs to be reviewed and implementation plan finalised within 1 week of receipt.3.Creating and processing redlines within an agreed time frame.4.Production/design related issues promptly resolved on the factory floor.5.Identifying any opportunities that will add value to the company.6.Implement and manage the introduction into Manufacturing all engineering changes related to established/released products.7.Good knowledge of the following aspects in MRP/ERP systems a)Bill of Materialb)Item MasterC)Work Order Management8) Manage the daily, weekly and monthly production plans based on requirements driven by demand and sales forecasts9) Use Dynamics AX12 ERP and Microsoft Excel to assist with Weekly Production plan.10) Assisting in achieving agreed KPI's including DIFOT (delivery in full on time)11) Balance weekly production loading and ensure manufacturing labour are effectively and efficiently used12) Analyse production capacity and suggest the potential capacity challenges to the Production Team

    • India
    • Aviation and Aerospace Component Manufacturing
    • 400 - 500 Employee
    • Quality Engineer
      • May 2004 - Nov 2007

Education

  • Bharathiar University
    BE, Mechanical Engineering
    2001 - 2004
  • Directorate Of Technical Education
    Diploma, Mechanical Engineering
    1998 - 2001

Community

You need to have a working account to view this content. Click here to join now