Saroof Kither Mohamed

Projects Coordinator at TYTEC
  • Claim this Profile
Contact Information
Location
Edmonton, Alberta, Canada, CA
Languages
  • English Professional working proficiency
  • Hindi Professional working proficiency
  • Tamil Professional working proficiency
  • Malayalam Native or bilingual proficiency
  • Portuguese Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Engineer In Training
    Engineers and Geoscientists BC
    Oct, 2018
    - Sep, 2024
  • Engineer In Training
    The Association of Professional Engineers and Geoscientists of Alberta (APEGA)
    Aug, 2018
    - Sep, 2024
  • Certified Six Sigma Green Belt
    ASQ
    Jun, 2015
    - Sep, 2024
  • Certification in Canadian Workplace Culture and Communication
    Edmonton Mennonite Centre for Newcomers
    Jan, 2018
    - Sep, 2024
  • ASQ-CQE
    ASQ
    Dec, 2014
    - Sep, 2024
  • Introduction to International Workplace Health and Safety
    British Safety Council

Experience

    • Canada
    • Oil and Gas
    • 1 - 100 Employee
    • Projects Coordinator
      • May 2019 - Present

      * Monitor daily progress of projects and prioritizing workload for the team without compromising quality or deadlines * Assisting PM in creating and maintaining project schedules, preparation and review of scope documents, progress reports, DBM's, meeting minutes etc. * Requesting vendor information, compiling RFQs, evaluating quotes, procurement tracking etc. * Assembling construction work packages with attention to detail * Assisting the Engineering team with drafting, developing Instrument Indexes, datasheet, cable schedules, document control etc. * Complete field visits to support engineering work development. Show less

    • United Kingdom
    • Engineering Services
    • 700 & Above Employee
    • QC Inspector - Electrical & Instrumentation
      • Jan 2015 - Aug 2015

      * Reviewed and approved sub-contractor quality deliverables (ITPs, Method Statements), QC personnel, calibration and test equipment etc. * Performed incoming inspection and ensured proper preservation of all E & I materials * Carried out site inspection, surveillance and approval of all E & I installations, field testing, pre-commissioning and loop checking activities performed by the sub-contractor * Attended various FAT/Vendor Surveillance inspections in UAE. Reviewed inspection reports sent from 3rd party inspection agencies world wide and corresponded with them on the same * Generated CAR/NCR/Observation reports, daily QA/QC reports, punch lists etc. on E & I works * Maintained logs, progress reports and assisted in liaison between the sub-contractor and Client * Conducted weekly tool box meetings with technicians and supervisors on E & I construction activities with emphasis on Quality and HSE aspects * Prepared safety observation cards and actively participated in HSE meetings Show less

    • United Arab Emirates
    • Mechanical Or Industrial Engineering
    • 200 - 300 Employee
    • QA/QC Engineer - Electrical & Instrumentation
      • Jul 2011 - Dec 2014

      * Carried out site inspection of all E & I installations and incoming inspections; ensured adherence to approved construction drawings, method statements, project specifications, applicable codes and regulatory requirements * Submitted inspection requests in coordination with concerned site/ project engineers and attended all E & I inspections with client/ contractor representatives * Monitored and performed calibration of field instruments/gauges, functional testing of smart transmitters, stroke check of control valves; inspection of cable ways, cable testing - Fiber optics, CAT 6/6A, Hi-pot testing of HV/MV cables, BDV test, leak test of impulse tubing etc. * Developed ITP and method statements based on project specifications, site construction quality requirements; provided induction to site personnel on Project Quality Plan and method statements * Prepared engineering queries and followed up with the Client on the same * Ensured that all equipment are calibrated and with valid certificates and maintained logs for the same * Organized final turnover documentation /work-packages, red-line / AS-BUILT drawings, testing and commissioning reports etc. * Implemented Company Integrated Management System (IMS) to the requirements of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, in addition to project and contractual requirements * Actively participated in third party compliance audits; carried out internal IMS audits; ensured effective control of all documentation; reported and documented all observations/non-conformities * Assisted in developing corrective/preventive actions and ensured its implementation and effectiveness; prepared daily/weekly/monthly QA reports; maintained QC logs Show less

    • Engineer - Electrical & Instrumentation
      • Dec 2010 - Jul 2011

      * Verified construction deliverables to ensure compliance with Project Specifications * Monitored all E & I materials and installation activities to ensure proper preservation, satisfactory workmanship, compliance with all IFC documents, international codes & standards * Identified the non conformities and generated NCR / Observation reports as applicable * Prepared daily reports to be sent to the Client; liaised with the Client and Contractor on work progress; followed up with the design team on close out of engineering queries Show less

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Engineer - Instrumentation & Control
      • Jun 2006 - Nov 2010

      * Supported and coordinated engineering design, procurement, construction and pre commissioning teams to ensure projects are executed in a safe, efficient, cost effective and timely manner * Effectively communicated with field execution teams in understanding labor allocation, material requirements and prepared bulk material take-off, manpower planning and mobilization, work schedules, look-ahead plans etc.; participated in the development of tender documents * Reviewed shop drawings including plot plans, process flow diagrams, process and instrumentation diagrams, general arrangements and organized construction work packages * Generated engineering design deliverables like data Sheets for field instruments, cable system, impulse tubing, cable Schedules, instrument and I/O List, termination drawings, instrument hook-up diagrams, cable tray fill calculations, lighting system design, load and voltage drop calculations etc. * Reviewed and evaluated vendor design data, calculations and drawings and communicated with them on technical and commercial queries * Prepared engineering queries (RFI) and followed up with design team on close out of the same During overseas project deputations as QA/QC Engineer - E & I: * Carried out visual inspection of all E & I installation works and incoming materials, generated internal punch list / NCR as required * Performed calibration of field instruments, field testing and pre commissioning activities * Organized final handover documentation /work-pack, red line / AS-BUILT drawings Show less

    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Engineering Trainee
      • Oct 2005 - May 2006

      *Installed, programmed and commissioned SIEMENS S7-300 & S7-200 range of PLCs *Prepared quotations and technical bids based on customer enquiries *Installed, programmed and commissioned SIEMENS S7-300 & S7-200 range of PLCs *Prepared quotations and technical bids based on customer enquiries

Education

  • NAIT (Northern Alberta Institute of Technology)
    Certificate in Industrial Instrumentation & Automation
    2018 - 2018
  • Anna University
    Bachelor of Engineering (B.E.), Electronics & Instrumentation
    2002 - 2005
  • Govt. Polytechnic,Palakkad
    Diploma in Technology, Instrument Technology
    1998 - 2001

Community

You need to have a working account to view this content. Click here to join now