Sargunan Guna
QA/QC Asst Manager at Toshiba Corporation japan- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English,Malay,Tamil Elementary proficiency
Topline Score
Bio
Srinee Vass Thayalla Vass
He very sharp and good working attitute always completing his job in time given with excellent quality.
Srinee Vass Thayalla Vass
He very sharp and good working attitute always completing his job in time given with excellent quality.
Srinee Vass Thayalla Vass
He very sharp and good working attitute always completing his job in time given with excellent quality.
Srinee Vass Thayalla Vass
He very sharp and good working attitute always completing his job in time given with excellent quality.
Credentials
-
CSWIP 3.2.1
Senior Welding inspectorJul, 2009- Oct, 2024 -
CSWIP
Radiographic InterpreterDec, 2008- Oct, 2024
Experience
-
Toshiba Corporation japan
-
Information Technology & Services
-
1 - 100 Employee
-
QA/QC Asst Manager
-
Nov 2017 - Present
-
-
-
Jacobs
-
Netherlands
-
Retail Office Equipment
-
1 - 100 Employee
-
Senior Welding Inspector
-
Aug 2016 - Dec 2016
Major Focus Monitoring Steel structural fabrication activity Interpret standards, codes, specifications and procedures; That assigned activities are conducted in accordance with approved instructions/procedures. Relevant examination records are completed, signed as a true record prior to inspection Major Focus Monitoring Steel structural fabrication activity Interpret standards, codes, specifications and procedures; That assigned activities are conducted in accordance with approved instructions/procedures. Relevant examination records are completed, signed as a true record prior to inspection
-
-
-
Alstom Power
-
Electric Power Generation
-
700 & Above Employee
-
Senior welding inspector
-
Oct 2013 - Jul 2016
Monitoring Piping fabrication activity and witness WQT reviews WPS/PQR Carried out site inspection boiler & turbine piping and storage tank.Conduct line check reviews test pack and release for hydrotest.Monitoring NDT activity reviews RT films and NDT documents. Involved Shutdown activity such as modification work.Material involved such as P91,P92,316L,CS & Crmoly. Monitoring Piping fabrication activity and witness WQT reviews WPS/PQR Carried out site inspection boiler & turbine piping and storage tank.Conduct line check reviews test pack and release for hydrotest.Monitoring NDT activity reviews RT films and NDT documents. Involved Shutdown activity such as modification work.Material involved such as P91,P92,316L,CS & Crmoly.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
S.welding Inspector
-
Feb 2012 - Oct 2013
Involve in steel structure and piping activity.Monitoring Piping inspection and line check,review test pack and ensure before release for hydrotest NDT complaint to the requirement.Follow up punch item ''A'' & ''B''.Review inspection documents. Involve in steel structure and piping activity.Monitoring Piping inspection and line check,review test pack and ensure before release for hydrotest NDT complaint to the requirement.Follow up punch item ''A'' & ''B''.Review inspection documents.
-
-
-
Chiyoda Malaysia Sdn.Bhd.
-
Oil and Gas
-
1 - 100 Employee
-
QA/QC Chief Inspector
-
Aug 2011 - Feb 2012
• Review Vendor documents and monitoring inspection activities such as air receiver, diesel tank, KO drum, Booster Compressor, valve testing & piping. • Review WPS & PQR and witness WQT. Carried out shop piping inspection. • Fit-up & visual inspection at site and monitor NDT status according to piping class. • Monitor RT status, review film and follow up repair / outstanding joints • Review piping test package and line check, issue punch list, witness hydrotest. • Review Vendor documents and monitoring inspection activities such as air receiver, diesel tank, KO drum, Booster Compressor, valve testing & piping. • Review WPS & PQR and witness WQT. Carried out shop piping inspection. • Fit-up & visual inspection at site and monitor NDT status according to piping class. • Monitor RT status, review film and follow up repair / outstanding joints • Review piping test package and line check, issue punch list, witness hydrotest.
-
-
-
Technip (M)
-
Norway
-
1 - 100 Employee
-
Piping Inspector
-
Jan 2010 - 2012
OGT Turkmenistan Project (Gas Plant) • Monitoring welder qualification test, welding consumable issue control • Conduct visual inspection field and pipe shop. • Carry out line check & issue punch list & follow-up punch killing with contractor. • Responsible in review test package to ensure all requirements in compliant to line class Service & executing outstanding works. Ensure NDT works to be done before hydro. • Release test pack for testing & witness hydro test • Updating daily QC documentation and hand over to client Show less
-
-
-
Ranex
-
Brazil
-
Food and Beverage Services
-
QA/QC manager
-
Dec 2007 - Jan 2010
Doing Plant Turnaround/Shutdown work.Planning and preparation activity Doing Plant Turnaround/Shutdown work.Planning and preparation activity
-
-
Education
-
Technology of welding institute (TWI)
Senior welding inspector & Radiography interpreter -
Workers institute technology
Diploma, Mechanical -
Clifford School.Kuala Kangsar
Primary & Secondary