Sarel Marais

Cathodic Protection Engineer at Isinyithi Cathodic Protection
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
City of Johannesburg, Gauteng, South Africa, ZA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Cathodic Protection Technologist CP3
    NACE International
    Mar, 2021
    - Nov, 2024
  • Coating Inspector - Level 1
    NACE International
    Sep, 2020
    - Nov, 2024

Experience

    • South Africa
    • Oil, Gas, and Mining
    • 1 - 100 Employee
    • Cathodic Protection Engineer
      • Apr 2018 - Present

    • Australia
    • Design Services
    • 700 & Above Employee
    • Mechanical/Electrical Assistant Resident Engineer
      • Jun 2013 - Mar 2018

      Construction supervision of phases 2C, 2D and 2H of the Olifants River Water Resources Development Project (ORWRDP) (South Africa). 40km 1.8m dia. water pipeline and pump station. (Construction costs R1.16 billion). Responsible for mechanical/electrical construction supervision and commissioning, network administration and Electronic document solutions (M-Files). (Trans Caledon Tunnelling Authority/Department of Water Affairs (TCTA/DWA)).

    • Mechanical Inspector/Technician
      • May 2012 - Jun 2013

      Construction supervision of phases 2C, 2D and 2H of the Olifants River Water Resources Development Project (ORWRDP) (South Africa). Technical assistant/Inspector. 40km 1.8m dia. water pipeline and pump station. (Construction costs R1.16 billion). Responsible for mechanical/electrical/civil construction supervision, network administration and Electronic document solutions (M-Files). (Trans Caledon Tunnelling Authority/Department of Water Affairs (TCTA/DWA)).

    • Technical Assistant Electrical/Mechanical
      • Mar 2011 - May 2012

      Construction supervision of the rehabilitation / widening of a section of the freeway between Tom Jones and Daveyton intersections on the National Route N12 (9km) (South Africa). Technical assistant Electrical/Mechanical. Rehabilitation and widening of existing road. (Construction costs R580 million). Responsible for median barrier (civil) and electrical construction supervision, network administration and IT support. (South African National Roads Agency Limited (SANRAL)).

    • Planner/Technical Assistant
      • Jul 2008 - Mar 2011

      Construction supervision of the rehabilitation / widening of a section of the freeway between the Brakfontein Interchange and the R21 Interchange on the National Route N1 (10km) (South Africa). Planner/Technical assistant Electrical/Mechanical. Rehabilitation and widening of existing road through the escarpment. (Construction costs R1.1 billion). Responsible for administrative work, traffic accommodation, compaction grouting and electrical construction supervision, network administration and IT support. (South African National Roads Agency Limited (SANRAL)). Show less

    • South Africa
    • Mining
    • 700 & Above Employee
    • Miner/Developer
      • Jun 2005 - Jul 2006

      Developing of 5th and 6th level of Bafokeng Rasimone Platinum Mine (BRPM) (South Africa). Miner and Developer. Sinking of inclined shaft and developing haulages. Responsible for overseeing services in the shaft/haulages and charging & blasting to advance the rockface. (ANGLO PLATINUM). Developing of 5th and 6th level of Bafokeng Rasimone Platinum Mine (BRPM) (South Africa). Miner and Developer. Sinking of inclined shaft and developing haulages. Responsible for overseeing services in the shaft/haulages and charging & blasting to advance the rockface. (ANGLO PLATINUM).

  • Cementation Mining
    • Rustenburg Area, South Africa
    • Banksman/Stagehand/Sinker
      • Jan 2001 - Jun 2005

      Sinking of Impala 12 shaft (from ground level to completion) (South Africa) 2001 - 2005. Murray & Roberts, Banksman, Stagehand, Sinker. Sinking of a vertical shaft (12m dia. 1000m deep) for ventilation. Responsible for overseeing installation of services in the shaft and charging & blasting. (IMPALA PLATINUM). Sinking of Impala 12 shaft (from ground level to completion) (South Africa) 2001 - 2005. Murray & Roberts, Banksman, Stagehand, Sinker. Sinking of a vertical shaft (12m dia. 1000m deep) for ventilation. Responsible for overseeing installation of services in the shaft and charging & blasting. (IMPALA PLATINUM).

Education

  • NACE Internatinal
    CP3
    2020 - 2021
  • NACE International
    Cathodic Protection Technician, Corrosion Engineering
    2016 - 2017
  • University of South Africa/Universiteit van Suid-Afrika
    Bachelor of Technology (BTech), Mechanical Engineering
    2008 - 2012
  • Goldfields Academy
    Blasting Certificate
    2003 - 2003
  • Goldfields Academy
    Onsetters/Banksman Certificate
    2002 - 2002

Community

You need to have a working account to view this content. Click here to join now